2. Bose<strong>to</strong> Operational Progress<br />

Temporary operations accommodation at Toteng.<br />

Mining operations commenced during <strong>September</strong> following successful delivery and commissioning of the<br />

first units of the mobile plant fleet and induction of the first group of mobile plant opera<strong>to</strong>rs. Two John<br />

Deere scraper units have been engaged in <strong>to</strong>p‐soil stripping and haul‐road construction and a Caterpillar<br />

front end loader and truck fleet has commenced ROM s<strong>to</strong>ckpile pad construction.<br />

Equipment delivered and commissioned by the end of <strong>September</strong> included:<br />

2 John Deere scraper units;<br />

1 Caterpillar 990 front end loader;<br />

8 Caterpillar 777D haul trucks;<br />

1 Caterpillar D10T bull‐dozer;<br />

1 Caterpillar 16M grader;<br />

2 Caterpillar 834 rubber tyred dozers;<br />

1 Sandvik D25KS blast hole drill;<br />

2 Terex rough terrain cranes; and<br />

8 items of smaller auxiliary plant.<br />

The first of three Liebherr 9350 excava<strong>to</strong>rs (350 <strong>to</strong>nne) was successfully delivered and assembly commenced<br />

in late <strong>September</strong>. This unit was commissioned and commenced operation in mid‐Oc<strong>to</strong>ber <strong>2011</strong>. The<br />

remaining mobile plant is on schedule for delivery and commissioning in late <strong>2011</strong> and early 2012.<br />

Excava<strong>to</strong>r and truck mining operations are planned <strong>to</strong> commence at the Zeta Deposit in the next month <strong>to</strong><br />

start the building of the run‐of‐mine (ROM) ore s<strong>to</strong>ckpile ahead of plant feed requirements. Recruitment<br />