Liebherr 9350 loading a Caterpillar 777D 100 <strong>to</strong>nne truck.<br />
3. Zeta Underground Definitive Feasibility Study (DFS)<br />
The DFS for underground mining of the Zeta Mineral Resource is on track and scheduled for completion in<br />
late <strong>2011</strong> with the results expected <strong>to</strong> be released <strong>to</strong> the ASX in early 2012. Independent consultant Mining<br />
Plus Pty Ltd (Mining Plus) is assisting with the completion of the DFS.<br />
Snowden Mining Industry Consultants (Snowden) completed an upgrade of the Mineral Resources for the<br />
Zeta Deposit incorporating 54 new infill holes drilled earlier this year. The Mineral Resources at Zeta<br />
increased by 9 million <strong>to</strong>nnes (25%) <strong>to</strong> 44.1 million <strong>to</strong>nnes and this resource model will form the basis of the<br />
Zeta underground DFS. Please refer <strong>to</strong> the updated Mineral Resource and Ore Reserves statement on the<br />
second last page of this report.<br />
During the quarter, Mining Plus evaluated several mine access options and geotechnical work progressed<br />
with recommendations made for a ground support regime for haulage development and production areas. A<br />
s<strong>to</strong>pe design exercise commenced <strong>to</strong>gether with mine sequencing and production scheduling. A<br />
metallurgical test work programme on samples of Zeta underground material confirmed the similarity of the<br />
Zeta underground ore with Zeta open pit material.<br />