Example 3.a -A proposal for a 12,000 square foot mobile home repair business on<br />
a 200 x 240 foot lot. The business would operate nine hours each day. There would<br />
be 30 employees in the building during each hour. During four hours, a total of 15<br />
visitors are expected each hour.<br />
Averaae Densitv<br />
1. The size of the project is 200 x 240 feet, or 48,000 square feet. Dividing<br />
48,000 by 43,560 results in a project of 1 .I acres.<br />
2. The number of persons during each hour is 30 during five hours and 45<br />
during four hours.<br />
3. A total of 330 persons will be on the site during the nine hours of operation<br />
(5~30=150and4~45= 180).<br />
4. The average number of persons per hour is 330 divided by 9 hours, or 37.<br />
5. Average density per acre per hour is 37 divided by 1 .I, or 34.<br />
Highest Densitv<br />
1. The highest number of persons expected at any time is 45. (30 employees<br />
and 15 visitors).<br />
2. Size of project is I .I acres.<br />
3. Dividing 45 persons by 1.1 acres results in 41 persons per acre.<br />
In this example the project exceeds the 25 persons per acre per hour standard, at 34,<br />
but does not exceed the maximum density standard of 50 persons per acre at any<br />
time, at 41. This project would be incompatible with Airport Land Use Commission<br />
standards.<br />
Example 3.b -A proposal for a sheet metal fabrication facility on 2.5 acres. The facility<br />
will have a fabricating building, a warehouse, and a shipping dock. The facility will<br />
operate two eight hour shifts. One shift as 45 workers and the other has 30. No<br />
customers come to the facility.<br />
Average Densitv<br />
1. Projectsizeis2.5acres.<br />
2. Persons per hour is 45 x 8 = 360 and 30 x 8 = 240.<br />
3. Total persons is 600 during 16 hours of operation.<br />
4. Average persons per hour is 600 divided by 16 = 37.5.<br />
5. Average density per acre per hour is 37.5 divided by 2.5, or 15.