14.02.2014 Views

BORGES-CLARKSBURG AIRPORT - sacog

BORGES-CLARKSBURG AIRPORT - sacog

BORGES-CLARKSBURG AIRPORT - sacog

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Example 3.a -A proposal for a 12,000 square foot mobile home repair business on<br />

a 200 x 240 foot lot. The business would operate nine hours each day. There would<br />

be 30 employees in the building during each hour. During four hours, a total of 15<br />

visitors are expected each hour.<br />

Averaae Densitv<br />

1. The size of the project is 200 x 240 feet, or 48,000 square feet. Dividing<br />

48,000 by 43,560 results in a project of 1 .I acres.<br />

2. The number of persons during each hour is 30 during five hours and 45<br />

during four hours.<br />

3. A total of 330 persons will be on the site during the nine hours of operation<br />

(5~30=150and4~45= 180).<br />

4. The average number of persons per hour is 330 divided by 9 hours, or 37.<br />

5. Average density per acre per hour is 37 divided by 1 .I, or 34.<br />

Highest Densitv<br />

1. The highest number of persons expected at any time is 45. (30 employees<br />

and 15 visitors).<br />

2. Size of project is I .I acres.<br />

3. Dividing 45 persons by 1.1 acres results in 41 persons per acre.<br />

In this example the project exceeds the 25 persons per acre per hour standard, at 34,<br />

but does not exceed the maximum density standard of 50 persons per acre at any<br />

time, at 41. This project would be incompatible with Airport Land Use Commission<br />

standards.<br />

Example 3.b -A proposal for a sheet metal fabrication facility on 2.5 acres. The facility<br />

will have a fabricating building, a warehouse, and a shipping dock. The facility will<br />

operate two eight hour shifts. One shift as 45 workers and the other has 30. No<br />

customers come to the facility.<br />

Average Densitv<br />

1. Projectsizeis2.5acres.<br />

2. Persons per hour is 45 x 8 = 360 and 30 x 8 = 240.<br />

3. Total persons is 600 during 16 hours of operation.<br />

4. Average persons per hour is 600 divided by 16 = 37.5.<br />

5. Average density per acre per hour is 37.5 divided by 2.5, or 15.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!