24.02.2014 Views

Download - City of Oakland

Download - City of Oakland

Download - City of Oakland

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

CITY OF OAKLAND<br />

DEPARTMENT OF CONTRACTING AND PURCHASING<br />

CONTRACT ADMINISTRATION DIVISION<br />

CURRENT REQUEST FOR QUALIFICATIONS OPPORTUNITIES<br />

RFP for the Strategic Plan for the <strong>City</strong> <strong>of</strong> <strong>Oakland</strong>’s Workforce Investment Board<br />

License Required N/A<br />

Project Number<br />

N/A<br />

Fees Fee: $10.00 Mailed $19.05<br />

Pre-Proposal Meeting Thursday, December 09, 2010 @ 10:00am<br />

One Frank H. Ogawa Plaza,<br />

Hearing Room 3<br />

Submittals Due<br />

Monday, January 3, 2011 @2PM<br />

250 Frank Ogawa Plaza, Suite 3341<br />

Contract Administration Front Desk<br />

Engineer’s Estimate<br />

Number <strong>of</strong> Bids Received<br />

Bidders and Bid Amounts<br />

Apparent Low Bid<br />

Awarded To<br />

Plan Holders<br />

12/31/10


RFP for On Call Construction Services for Various <strong>City</strong> <strong>of</strong> <strong>Oakland</strong> Projects<br />

License Required A or C8 or C42<br />

Project Number<br />

N/A<br />

Fees Fee: $10.00 Mailed $19.05<br />

Pre-Proposal Meeting Friday, August 20, 2010 @ 10:00am<br />

One Frank H. Ogawa Plaza,<br />

Hearing Room 1<br />

Submittals Due<br />

Friday September 3, 2010@2PM<br />

250 Frank Ogawa Plaza, Suite 3341<br />

Contract Administration Front Desk<br />

Engineer’s Estimate<br />

Number <strong>of</strong> Bids Received 5<br />

Bidders and Bid Amounts<br />

Apparent Low Bid<br />

Awarded To<br />

Plan Holders<br />

AJW Construction, Beliveau Engineering, Dan Peters Construction,<br />

Magdave Associates, McGuire and Hester, New Growth Landscape,<br />

12/31/10


RFP Preparation <strong>of</strong> Blight Studies and Preliminary Reports for Proposed Amendments to<br />

the Central District and Broadway/MacArthur/San Pablo Redevelopment Project Area<br />

Plans<br />

License Required N/A<br />

Project Number<br />

N/A<br />

Fees Free Mailed $19.05<br />

Pre-Proposal Meeting<br />

Friday, August 11, 2010 @ 10:00am<br />

One Frank H. Ogawa Plaza,<br />

Hearing Room 2<br />

Submittals Due<br />

Friday September 2, 2010@2PM<br />

250 Frank Ogawa Plaza, Suite 3341<br />

Contract Administration Front Desk<br />

Engineer’s Estimate<br />

Number <strong>of</strong> Bids Received 2<br />

Bidders and Bid Amounts<br />

Apparent Low Bid<br />

Awarded To<br />

Plan Holders<br />

Byrens Kim Design Works, Dowling Associates, Inc., Lumenworks<br />

Lighting Design, Inc., Magdave Associates, Inc.<br />

12/31/10


RFP for the Preparation <strong>of</strong> Environmental Impact Reports Broadway/MacArthur/ San<br />

Pablo Redevelopment Project Area Plans<br />

License Required N/A<br />

Project Number<br />

N/A<br />

Fees Fee: No Fee Mailed $19.05<br />

Pre-Proposal Meeting Wednesday, August 11, 2010 @ 11:00am<br />

One Frank H. Ogawa Plaza,<br />

Hearing Room 2<br />

Submittals Due<br />

Friday September 3, 2010 @2PM<br />

250 Frank H. Ogawa Plaza, Suite 3341<br />

Contract Administration Front Desk<br />

Engineer’s Estimate<br />

Number <strong>of</strong> Bids Received 4<br />

Bidders and Bid Amounts<br />

Apparent Low Bid<br />

Awarded To<br />

Plan Holders<br />

Fugro West, Inc., Dowling Associates, Inc., Byrens Kim Design<br />

Works<br />

12/31/10


RFP-to Perform a Performance Audit <strong>of</strong> the Fox Theater<br />

License Required N/A<br />

Project Number<br />

N/A<br />

Fees No Fee Mailed $19.05<br />

Pre-Proposal Meeting Thursday, June 17, 2010 @ 10:00am<br />

<strong>City</strong> Hall, Hearing Room 1<br />

One Frank Ogawa Plaza<br />

Submittals Due<br />

Friday, July 9,2010@2PM<br />

250 Frank Ogawa Plaza, Suite 3341<br />

Contract Administration Front Desk<br />

Engineer’s Estimate<br />

Number <strong>of</strong> Bids Received<br />

Bidders and Bid Amounts<br />

Apparent Low Bid<br />

Awarded To<br />

Plan Holders<br />

URS, Beyond Compliance, Peter Cooke/Associates, MARSH, Yano<br />

Accountancy Corp., Macias Gini Oconnell, Muller & Caufield<br />

Architects,<br />

12/31/10


RFP-for Security Guard Services THIS PROJECT HAS 1 ADDENDUM<br />

License Required N/A<br />

Project Number<br />

N/A<br />

Fees No Fee Mailed $9.05<br />

Pre-Proposal Meeting Wednesday, June 16, 2010 @ 10:00am<br />

250 Frank H. Ogawa Plaza, Suite 4304<br />

Broadway Conference Room<br />

Submittals Due<br />

Engineer’s Estimate<br />

Number <strong>of</strong> Bids Received<br />

Bidders and Bid Amounts<br />

Apparent Low Bid<br />

Awarded To<br />

Plan Holders<br />

Wednesday June 30, 2010@2PM<br />

250 Frank Ogawa Plaza, Suite 3341<br />

Contract Administration Front Desk<br />

Every Second Count, St. Moritz, U.S. Security Assoc., Inc., Cypress<br />

Security, G45 Secure Solutions USA, ABC Security Service,<br />

ARCLIGHT Systems Security, Inc., A&K Security, Inc.,<br />

Alliedbarton , Security Code 3, VAL Security, Inc., Securetrans ,<br />

Fisher Executive Protection & Training, WSB, Marina Securities<br />

12/31/10


RFP-for Education and Outreach for Implementation <strong>of</strong> Instant Run-<strong>of</strong>f, Also known as,<br />

ranked-Choice Voting, in the <strong>City</strong> <strong>of</strong> <strong>Oakland</strong>’s November 2010 Election<br />

THIS PROJECT HAS 2 ADDENDUMS<br />

License Required N/A<br />

Project Number<br />

N/A<br />

Fees Fee: $10.00 Mailed $9.05<br />

Pre-Proposal Meeting<br />

Thursday, June 2, 2010 @ 10:00am<br />

One Frank H. Ogawa Plaza,<br />

Hearing Room 2<br />

Submittals Due<br />

Engineer’s Estimate<br />

Number <strong>of</strong> Bids Received<br />

Bidders and Bid Amounts<br />

Apparent Low Bid<br />

Awarded To<br />

Plan Holders<br />

Friday June 18, 2010 @2PM<br />

250 Frank Ogawa Plaza, Suite 3341<br />

Contract Administration Front Desk<br />

Central Legal De La Raza<br />

12/31/10


RFP-for As- Needed Economic Consultants Services<br />

License Required N/A<br />

Project Number<br />

N/A<br />

Fees $10.00 Mailed $9.05<br />

Pre-Proposal Meeting Friday, May 7, 2010 @ 10:30am<br />

One Frank H. Ogawa Plaza,<br />

Hearing Room 4<br />

Submittals Due<br />

Engineer’s Estimate<br />

Number <strong>of</strong> Bids Received<br />

Bidders and Bid Amounts<br />

Apparent Low Bid<br />

Awarded To<br />

Plan Holders<br />

Friday May 21, 2010@2PM<br />

250 Frank Ogawa Plaza, Suite 3341<br />

Contract Administration Front Desk<br />

ATTEVO INC, ELEVATA INCORPORATED, FUGRO WEST INC, GJT<br />

LIMITED, GOLDEN ASSOCIATES, HKIT Architects, Harris & Associates, JM<br />

MOORE, JUNGLE COMMUNICATIONS INC, KILOWATT ENGINEERING<br />

INC DBA KW Engineering Inc., KLEINFELEDER WEST INC, LILIEN, LLC,<br />

OLIVE CONSTRUCTION MANAGEMENT, R3 CONSULTING GROUP INC,<br />

REGINA M BLUS, TRANSYSTEMS CORPORATION, U.S. BANK<br />

NATIONAL ASSOCIATION, VARGAS GREENAN ARCHITECTURE-CIVIC<br />

DESIGN, WILLDAN GROUP INC, WILLIAMS ADLEY & COMPANY LLP,<br />

HAUSRATH ECONOMICS GROUP, VERNAZZA WOLFE ASSOCIATES<br />

INC, KEYSER MARSTON ASSOCIATES, PUBLIC FINANCIAL<br />

MANAGEMENT INC., UDA STUDIO, DAVID PAUL ROSEN &<br />

ASSOCIATES, ECONOMIC AND PLANNING SYSTEMS, STRATEGIC<br />

ECONOMIC, PACIFIC MUNICIPAL CONSULTANTSJACK FAUCETT<br />

ASSOCIATES INC, GRUEN GRUEN & ASSOCIATES, PURPLE LYNX,<br />

BEDROCK MEDIA, APPLIED DEVELOPMENT ECONOMICS, SASAKI<br />

ASSOCIATES INC, URBAN TRANSFORMATION, JSA Consulting Services,<br />

BAY AREA ECONOMICS (B.A.E.), CSG ADVISORS, INC., WAHLSTROM &<br />

ASSOCIATES, DENISE E. CONLEY, Brion & Associates, METROVATION<br />

BROKERAGE INC, MANEX, CGR MANAGEMENT CONSULTANTS,<br />

URBAN ANALYTICS LLC, OLIVA GLOBAL COMMUNICATIONS, SEIFEL<br />

CONSULTING, INC., BBP & Associates, LLC<br />

12/31/10


RFP-for Civic Center HVAC and Air Flow Improvements-<br />

STIMULUS PROJECT ONLINE ONLY- THIS PROJECT HAS 1 ADDENDUM<br />

License Required N/A<br />

Project Number<br />

C389010<br />

Fees<br />

N/A<br />

Pre-Proposal Meeting Thursday, April 29, 2010 @ 11:00am<br />

250 Frank H. Ogawa Plaza, Suite 4304<br />

Submittals Due<br />

Friday May 14, 2010@2PM<br />

250 Frank Ogawa Plaza, Suite 3341<br />

Contract Administration Front Desk<br />

Engineer’s Estimate<br />

Number <strong>of</strong> Bids Received 2<br />

Bidders and Bid Amounts<br />

Apparent Low Bid<br />

Awarded To<br />

Plan Holders Broadway Mechanical, IC Engineering, Salas O’Brien, McGraw –<br />

Hill Construction Dodge, Sacramento Regional Builders Exchange,<br />

Airway Air Conditioning & Heating, Inc. IC Engineering<br />

Comments: Requests for Proposals are available for download free <strong>of</strong> cost: send an<br />

email to EnergyGroup@oaklandnet.com with “Civic Center HVAC and Air Flow<br />

Improvements” as the subject and a reply email with further instructions will be<br />

sent.<br />

12/31/10


RFP-for Municipal Lighting Energy Efficiency Retr<strong>of</strong>its Phase 8- STIMULUS PROJECT<br />

ONLINE ONLY-THIS PROJECT HAS 3 ADDENDUMS<br />

License Required N/A<br />

Project Number<br />

C388710,C389110,C389210<br />

Fees<br />

N/A<br />

Pre-Proposal Meeting MANDATORY-Friday, April 23, 2010 @ 3:00pm<br />

One Frank H. Ogawa Plaza,<br />

Hearing Room 3<br />

Submittals Due<br />

Friday May 12, 2010@2PM<br />

250 Frank Ogawa Plaza, Suite 3341<br />

Contract Administration Front Desk<br />

Engineer’s Estimate<br />

Number <strong>of</strong> Bids Received 2<br />

Bidders and Bid Amounts<br />

Apparent Low Bid<br />

Awarded To<br />

Plan Holders<br />

Controlled Energy, DKS Associates, Ultra Systems Enviornmental,<br />

Sun Industries, Sustainable Technologies, Kitchell, Sacramento<br />

Regional Builders Exchange, Salas O’Brien, Airway Air<br />

Conditioning & Heating, Inc., IC Engineering<br />

Comments: Requests for Proposals are available for download free <strong>of</strong> cost: send an<br />

email to EnergyGroup@oaklandnet.com with “Municipal Lighting Phase 8” as the<br />

subject and a reply email with further instructions will be sent.<br />

12/31/10


RFP-for The Streetscape Design for Martin Luther King Jr. Way & Peralta Street in the<br />

West <strong>Oakland</strong> Redevelopment Project Area<br />

License Required N/A<br />

Project Number<br />

N/A<br />

Fees $10.00 Mailed $19.05<br />

Pre-Proposal Meeting Wednesday, April 7, 2010 @ 10:00am<br />

250 Frank H. Ogawa Plaza, Suite 4304<br />

Skyline Conference Room<br />

Submittals Due<br />

Engineer’s Estimate<br />

Number <strong>of</strong> Bids Received<br />

Bidders and Bid Amounts<br />

Apparent Low Bid<br />

Awarded To<br />

Plan Holders<br />

Friday April 30, 2010@2PM<br />

250 Frank Ogawa Plaza, Suite 3341<br />

Contract Administration Front Desk<br />

BKF Engineers Surveyors & Planners, Bionic, Jetaanc, Bruce Jett &<br />

Associates, Inc., Harris & Associates, Golden Associates, WRT,<br />

Glates, Bottomley Design & Planning, RBF Consulting,<br />

Community Design & Architechture, Sasaki Associates, Moore<br />

Zacufano , Goutsman, Inc.<br />

12/31/10


RFQ-Request for Qualifications for Civic Center HVAC and Air Flow Improvements<br />

License Required N/A<br />

Project Number<br />

C389010<br />

Fees<br />

$:Free<br />

Pre-Proposal Meeting -2 MANDATORY<br />

Wednesday ,March 24, 2010 @11:00am and<br />

Thursday, March 25, 2010 @ 11:00am<br />

250 Frank H. Ogawa Plaza, Suite 4304<br />

Broadway Conference Room<br />

Submittals Due<br />

Thursday , April 8, 2010 @ 2:00pm<br />

250 Frank Ogawa Plaza, Suite 3341<br />

Contract Administration Front Desk<br />

Engineer’s Estimate<br />

Number <strong>of</strong> Bids Received 0<br />

Bidders and Bid Amounts<br />

Apparent Low Bid<br />

Awarded To<br />

Plan Holders<br />

Comments: Requests for Qualifications are available for download free <strong>of</strong> cost: send<br />

an email to EnergyGroup@oaklandnet.com with “Civic Center HVAC and Air Flow<br />

Improvements” as the subject and a reply email with further instructions will be<br />

sent.<br />

12/31/10


RFP-Security Guard Services<br />

License Required N/A<br />

Project Number<br />

C389310<br />

Fees $32.00 If Mailed $36.05<br />

Pre-Proposal Meeting 2 Monday ,March 22, 2010 @10:00am<br />

250 Frank H. Ogawa Plaza, Suite 4304<br />

Broadway Conference Room<br />

Submittals Due<br />

Engineer’s Estimate<br />

Number <strong>of</strong> Bids Received<br />

Bidders and Bid Amounts<br />

Apparent Low Bid<br />

Awarded To<br />

Plan Holders<br />

Friday , April 2, 2010 @ 2:00pm<br />

250 Frank Ogawa Plaza, Suite 3341<br />

Contract Administration Front Desk<br />

ANI Private Security, Cypress Security, Pr<strong>of</strong>essional Security<br />

Consultants, Star Protection Agency, ABC Security Service, A&K<br />

Security Services, WSB & Associates, McCoys Patrol Service, A-1<br />

Protective Services, WSB & Associates, Inc., Integral Protection,<br />

Highcom Security Services<br />

12/31/10


RFQ-Request for Qualifications for Hall <strong>of</strong> Justice HVAC Improvements<br />

License Required N/A<br />

Project Number<br />

C389310<br />

Fees $24.00 If Mailed $34.00<br />

Pre-Proposal Meeting 2 Monday ,March 1, 2010 @3:00pm<br />

250 Frank H. Ogawa Plaza, Suite 4304<br />

Wednesday March 3, 2010 @ 3:00pm<br />

One Frank Ogawa Plaza, Hearing Room 3<br />

Submittals Due<br />

Friday , March 19, 2010 @ 2:00pm<br />

250 Frank Ogawa Plaza, Suite 3341<br />

Contract Administration Front Desk<br />

Engineer’s Estimate<br />

Number <strong>of</strong> Bids Received 2<br />

Bidders and Bid Amounts<br />

Apparent Low Bid<br />

Awarded To<br />

Plan Holders<br />

12/31/10


RFP for ReCreate Art Contest and Exhibition- THIS RFP IS ONLINE<br />

License Required N/A<br />

Project Number<br />

N/A<br />

Fees $20.00 If Mailed $24.05<br />

Pre-Proposal Meeting Wednesday, February 24, 2010 at 3PM<br />

Skyline Conference Room 3 rd Floor<br />

250 Frank Ogawa Plaza<br />

Submittals Due<br />

Wednesday, March 12, 2010 @ 2:00pm<br />

250 Frank Ogawa Plaza, Suite 3341<br />

Contract Administration Front Desk<br />

Engineer’s Estimate $30,000.00($15,000.00 annual aggregate)<br />

Number <strong>of</strong> Bids Received 1<br />

Bidders and Bid Amounts<br />

Apparent Low Bid<br />

Awarded To<br />

Plan Holders<br />

Comments: Electronic (pdf) RFP’s may be downloaded by sending an email to:<br />

ZeroWaste@oaklandnet.com with “ReCreate ” as the subject and a reply email with<br />

further instructions will be sent.<br />

12/31/10


RFP- On-Call Appraisal Services<br />

License Required N/A<br />

Project Number<br />

N/A<br />

Fees $20.00 If Mailed $24.05<br />

Pre-Proposal Meeting Wednesday, February 17, 2010 at 2PM<br />

Broadway Conference Room 4 th Floor<br />

250 Frank Ogawa Plaza<br />

Submittals Due<br />

Wednesday, March 3, 2010 @ 2:00pm<br />

250 Frank Ogawa Plaza, Suite 3341<br />

Contract Administration Front Desk<br />

Engineer’s Estimate<br />

Number <strong>of</strong> Bids Received 12<br />

Bidders and Bid Amounts<br />

Apparent Low Bid<br />

Awarded To<br />

Plan Holders<br />

Up to $600,000 over 2yr period<br />

Yovino & Young, Inc., Alfred L. Watts & Associates,<br />

Burchard/Rinehat, J.W. Tomard Associates, Donna Desmond, Sanli<br />

Pastore & Hill<br />

12/31/10


<strong>Oakland</strong> Municipal Identification/Stored Value Card<br />

License Required N/A<br />

Project Number N/A<br />

Fees $10.00 If Mailed $19.05<br />

Pre-Submittal Monday, February 8, 2010 at 10:00am<br />

Meeting<br />

Hearing Room 2 , <strong>City</strong> Hall<br />

One Frank Ogawa Plaza<br />

Submittals Due Wednesday, March 17, 2010 @ 2:00pm<br />

250 Frank Ogawa Plaza, Suite 3341<br />

Contract Administration Front Desk<br />

Engineer’s Estimate<br />

Number <strong>of</strong> Bids<br />

Received<br />

Bidders and Bid<br />

Amounts<br />

Apparent Low Bid<br />

Awarded To<br />

Plan Holders<br />

HID Global<br />

Capture Technologies<br />

DatacardGroup<br />

SafeCardID.Com<br />

Rock West Technology Group<br />

Photo ID Systems & Supplies<br />

VTFS, Inc<br />

Image Sales, Inc<br />

SF Gloval Group<br />

California Bank and Trust<br />

California Government Banking Bank <strong>of</strong> America<br />

US Bank<br />

Far East National Bank<br />

Metropolitan Bank<br />

Community Bank <strong>of</strong> the Bay<br />

Bank <strong>of</strong> the West<br />

HSBC Bank USA, NA<br />

Citibank<br />

Washingron Mutual<br />

Cathay Bank<br />

Union Bank <strong>of</strong> California<br />

Wells Fargo-MAC 0193-120<br />

Alta Alliance Bank<br />

Comerica Bank<br />

United Commerical Bank<br />

Intercede<br />

12/31/10


U.S. Bank National Association Governments and Non-Pr<strong>of</strong>its Banking<br />

Hoobe Identification Solutions, Inc.<br />

ALINC Consulting, Inc<br />

Comments: Electronic (pdf) RFQs may be downloaded for free by sending an email to:<br />

dcpca@oaklandnet.com with “RFQ for <strong>Oakland</strong> ID Card” as the subject and a reply<br />

email with further instructions will be sent.<br />

12/31/10


RFP for the Parking Access and Revenue Control System (PARCS) THIS PROJECT HAS<br />

ONE ADDENDUM<br />

License Required N/A<br />

Project Number<br />

N/A<br />

Fees FREE If Mailed $9.05<br />

Pre-Submittal Meeting Wednesday, January 06, 2009 at 10:30am<br />

Personnel Conference Room, 3 rd Floor1<br />

150 Frank Ogawa Plaza<br />

Submittals Due<br />

Thursday, February 11, 2010 @ 2:00pm<br />

250 Frank Ogawa Plaza, Suite 3341<br />

Contract Administration Front Desk<br />

Engineer’s Estimate<br />

Number <strong>of</strong> Bids Received<br />

Bidders and Bid Amounts<br />

Apparent Low Bid<br />

Awarded To<br />

Plan Holders<br />

N/A<br />

DataPark, InterTechnomics, (CMTI, MVP, Clancy Systems), Paylock, Bay<br />

Cities Automatic Gates, T2 Systems, Scheint & Bazhman, S&B, ACS,<br />

AEKO, Federal APD, GMG Systems, Inc., WM.D.White Co., Inc., SECOM<br />

Int.<br />

12/31/10


RFP for General Liability Third Party (TPA) Services<br />

License Required N/A<br />

Project Number<br />

N/A<br />

Fees FREE If Mailed $9.05<br />

Pre-Submittal Meeting Wednesday , December 09, 2009 at 10:00am<br />

Skyline Conference Room, Suite 3341<br />

250 Frank Ogawa Plaza<br />

Submittals Due<br />

Wednesday, January 22, 2010 @ 2:00pm<br />

250 Frank Ogawa Plaza, Suite 3341<br />

Contract Administration Front Desk<br />

Engineer’s Estimate<br />

Number <strong>of</strong> Bids Received<br />

Bidders and Bid Amounts<br />

Apparent Low Bid<br />

Awarded To<br />

Plan Holders<br />

N/A<br />

George Hills Co., Carl Warren Company, Cannon Cochran<br />

Management Services, Inc., Keenan & Associates, John Glenn<br />

Adjusters, AIMS, York Ins. Services JT2, Builder Unlimited<br />

12/31/10


RFP for 2010-2011 Team <strong>Oakland</strong><br />

License Required N/A<br />

Project Number<br />

P35510<br />

Fees Pick-up $20.00 If Mailed $29.05<br />

Pre-Submittal Meeting Tuesday , December 01, 2009 at 9:30am<br />

<strong>City</strong> Hall Hearing Room 3<br />

One Frank Ogawa Plaza<br />

Submittals Due<br />

Wednesday, January 6, 2010 @ 2:00pm<br />

250 Frank Ogawa Plaza, Suite 3341<br />

Contract Administration Front Desk<br />

Engineer’s Estimate $249,000.00<br />

Number <strong>of</strong> Bids Received<br />

Bidders and Bid Amounts<br />

Apparent Low Bid<br />

Awarded To<br />

Plan Holders<br />

YEP, Peralta Svcs., Corp, <strong>Oakland</strong> Venue Management, Latino<br />

Commission, Spanish Speaking Citizens’ Foundation, The Unity<br />

Council<br />

12/31/10


Request for Design / Build Proposals Hall <strong>of</strong> Justice HVAC Improvements (STIMULUS<br />

PROJECT)<br />

License Required B<br />

Project Number<br />

C389310<br />

Fees Pick-up $30.00 If Mailed $39.05<br />

Pre-Submittal Meeting Tuesday , December 01, 2009 at 3:00pm<br />

<strong>City</strong> Hall Hearing Room 3<br />

One Frank Ogawa Plaza<br />

Submittals Due<br />

Friday, December 18, 2009 @ 2:00pm<br />

250 Frank Ogawa Plaza, Suite 3341<br />

Contract Administration Front Desk<br />

Engineer’s Estimate $552,059.00<br />

Number <strong>of</strong> Bids Received<br />

Bidders and Bid Amounts<br />

Apparent Low Bid<br />

Awarded To<br />

Plan Holders<br />

Legacy Mechanical, Carrier Corporation, EMCOR Mesa, America<br />

Air, Acco, Monterey Mechanical Co., Roberts Electric<br />

12/31/10


RFP for Green Business Program Technical Assistance<br />

License Required Recycling and Solid Waste Consultants<br />

Project Number<br />

H63640<br />

Fees Pick-up $20.00 If Mailed $29.05<br />

Pre-Submittal Meeting Thursday, November 05, 2009 at 9:30am<br />

<strong>City</strong> Hall Hearing Room 1<br />

One Frank Ogawa Plaza<br />

Submittals Due<br />

Monday, November 30, 2009 @ 2:00pm<br />

250 Frank Ogawa Plaza, Suite 3341<br />

Contract Administration Front Desk<br />

Engineer’s Estimate<br />

Number <strong>of</strong> Bids Received<br />

Bidders and Bid Amounts<br />

Apparent Low Bid<br />

Awarded To<br />

Plan Holders<br />

Kies Strategies, Sustainable Concepts Studio, URS Corporation,<br />

Environmental Science Associates, EnviroSystems Group, C2<br />

Alternative Services, R3 Consulting Group, Environmental Planning<br />

Consultants,<br />

12/31/10


RFP Creation <strong>of</strong> Development Impact Fees<br />

*Note: If you would like a copy <strong>of</strong> the RFP emailed to you, please email your request<br />

to: Istarr@oaklandnet.com<br />

License Required N/A<br />

Project Number<br />

N/A<br />

Fees<br />

Pre-Proposal Meeting<br />

Proposals Due<br />

Engineer’s Estimate<br />

Number <strong>of</strong> Proposals<br />

Received<br />

Planholders list:<br />

Free or $9.05 if mailed<br />

Thursday, October 29, 2009 at 2:00 p.m.<br />

Broadway Conference Room , Suite 4304<br />

250 Frank Ogawa Plaza<br />

Friday, November 20, 2009 at 2:00 p.m.<br />

250 Frank H. Ogawa Plaza, Suite 3341<br />

Contract Administration Front Desk<br />

Seifel Consulting ,PBS&J, Fehr & Peers. Urban Economics,<br />

Wilbur Smith Associates, Dowling Associates,<br />

Environmental Science Associates, Duncan Associates,<br />

Revenue Cost, Kimley-Horn, Willdan Financial, CHS<br />

Consulting, Circle Point, PMC. Economic & Planning<br />

Systems, Inc., Transportation Analytics, AECOM, Conley<br />

Group, Brion & Associates, Hausrath Economics Group,<br />

DKS Associates, Bay Area Economics, Cox Castle<br />

Nicholson<br />

12/31/10


RFQ- 2009-2012 – As Needed Engineering Services<br />

License Required Civil, Structural, Geotechnical Engineering Services<br />

Project Number<br />

N/A<br />

Fees<br />

Free $10.00 or $15.00 if mailed<br />

Pre-Proposal Meeting Wednesday, September 30, 2009 at 2:00 p.m.<br />

1 Frank H. Ogawa Plaza,<br />

Hearing Room 1<br />

Proposals Due<br />

Friday, October 9, 2009 at 2:00 p.m.<br />

250 Frank H. Ogawa Plaza, Suite 3341<br />

Contract Administration Front Desk<br />

Engineer’s Estimate<br />

Number <strong>of</strong> Proposals 38<br />

Received<br />

Planholders list:<br />

MGE Engineering, Inc., Rajappan & Meyer, Fugro West,<br />

Inc., Questa, Cal Engineering & Geology, Biggs Cardosa<br />

Assoc., Kimley- Horn Assoc., Treadwell, Rollo, Inc.,<br />

M<strong>of</strong>fatt & Nichol, Applied Materials & Engineering,<br />

OLMM Consulting Engineers, URS, Carollo Engineers.<br />

Restoration Design Group(RDG),BKF Engineers,<br />

Cornerstone Earth Group, TRC, Urban Design Consulting<br />

Engineers, ENGEO Inc., Earthquake & Structures, Inc.,<br />

Kleinfelder, Degenkolb Engineers, SMW & Associates,<br />

MACTEC, Jacob Associates, Avila Project Mgmt., HTK<br />

Structural Engineers, Humann Co., Geosphere Consultants,<br />

Creegan & D’Angelo, Chow Engineering, AGS, Inc., TRS<br />

Consultants, Inc., WRECO, Mark Thomas & Co., Wood<br />

Rodgers, AT Merovich & Associates Structural Engineers,<br />

RES Engineers, Lai & Associates, Summit Eng., Jacobs,<br />

Ninyo & Moore, S.Kwok Engineers, Inc., DC&E, AMC<br />

Consulting Eng., Inc., Interactive Reasurers, Fratessa Forbes<br />

Wong, Miller Pacific Engineering Group, Aliquot Assoc.,<br />

Inc., Ireland Engineering, Ware Malcomb, AE3 Partners<br />

Engineering, Beyaz & Patel, Inc., RBF Consulting, Sandis,<br />

DKS Associates, The KPA Group, KC Pierce & Assoc.,<br />

Fehr & Peers<br />

12/31/10


RFP-Chemical Dependency Treatment Programs Provider List REVISED<br />

License Required N/A<br />

Project Number<br />

N/A<br />

Fees<br />

Free or $9.05 if mailed<br />

Pre-Proposal Meeting Wednesday, October 14, 2009 at 11:00 a.m.<br />

1 Frank H. Ogawa Plaza,<br />

Hearing Room 1<br />

Proposals Due<br />

Friday, November 13, 2009 at 2:00 p.m.<br />

250 Frank H. Ogawa Plaza, Suite 3341<br />

Contract Administration Front Desk<br />

Engineer’s Estimate<br />

Number <strong>of</strong> Proposals<br />

Received<br />

Planholders list:<br />

The Camp Recovery Center, Recovery Management<br />

Svc.Inc., Azure Acres Recovery, New Bridge Foundation<br />

12/31/10


SOQ – As Needed Landscape Architectural Services<br />

License Required Landscape Architects<br />

Project Number<br />

N/A<br />

Fees<br />

Free 10.00 or $15.00 if mailed<br />

Pre-Proposal Meeting Thursday, September 17, 2009 at 10:00 a.m.<br />

1 Frank H. Ogawa Plaza,<br />

Hearing Room 1<br />

Proposals Due<br />

Thursday, October 8, 2009 at 2:00 p.m.<br />

250 Frank H. Ogawa Plaza, Suite 3341<br />

Contract Administration Front Desk<br />

Engineer’s Estimate Approximately $150,000.00 per consultant<br />

Approximately $500,000.00 per consultant<br />

Number <strong>of</strong> Proposals 18<br />

Received<br />

Planholders list:<br />

Peter Wolfe Landscape Architecture, Stevens Associates,<br />

Bottomley Design & Planning, Wallace Roberts & Todd,<br />

Bruce Jett Associates, Sasaki Associates, Golden Associates<br />

Landscape Architects, Inside Out Designs, PGA Design,<br />

Dillingham Associates, Keller Mitchell, Merrill Morris,<br />

Adrienne Wong Assoc., CMG Landscape Architectural,<br />

Questa Engineering, Cliff Lowe Associates, Stantec,<br />

Restoration Design Group, Design, Community &<br />

Environment, Harris Design, UDS<br />

12/31/10


RFP –Citation Administration and Revenue Reconciliation Systems(CARRS)THIS<br />

PROJECT HAS 2ADDENDUM<br />

License Required Qualified Medical Service Provider Consultants<br />

Project Number<br />

N/A<br />

Fees<br />

Free or $9.05 if mailed<br />

Pre-Proposal Meeting Mandatory Thursday, August 13, 2009 at 10:30 a.m.<br />

150 Frank H. Ogawa Plaza,<br />

Finance Conference Room<br />

Proposals Due<br />

Friday, September 25, 2009 at 2:00 p.m.<br />

250 Frank H. Ogawa Plaza, Suite 3341<br />

Contract Administration Front Desk<br />

Engineer’s Estimate N/A<br />

Number <strong>of</strong> Proposals<br />

Received<br />

Planholders list:<br />

ACS, JCMS, <strong>City</strong> <strong>of</strong> Inglewood ITC Department, Duncan<br />

Solutions, Inc., Streetline, Inc., Paylock IPT LLC, Street<br />

Smart Technology, Duncan Solutions,<br />

12/31/10


RFP for <strong>Oakland</strong> Fire Department Annual Physical Examinations<br />

License Required Qualified Medical Service Provider Consultants<br />

Project Number<br />

N/A<br />

Fees<br />

Free or $9.05 if mailed<br />

Pre-Proposal Meeting Wednesday, August 21, 2009 at 11:30 a.m.<br />

250 Frank H. Ogawa Plaza, Suite 3341<br />

Skyline Conference Room<br />

Proposals Due<br />

Friday, August 21, 2009 at 2:00 p.m.<br />

250 Frank H. Ogawa Plaza, Suite 3341<br />

Contract Administration Front Desk<br />

Engineer’s Estimate N/A<br />

Number <strong>of</strong> Proposals<br />

Received<br />

Planholders list:<br />

Concentra<br />

12/31/10


RFP for <strong>Oakland</strong> Fire Department Personality Trait Assessments<br />

License Required Medical Service Provider Consultants<br />

Project Number<br />

N/A<br />

Fees<br />

Free or $9.05 if mailed<br />

Pre-Proposal Meeting Wednesday, August 5, 2009 at 11:30 a.m.<br />

250 Frank H. Ogawa Plaza, Suite 3341<br />

Skyline Conference Room<br />

Proposals Due<br />

Friday, August 28, 2009 at 2:00 p.m.<br />

250 Frank H. Ogawa Plaza, Suite 3341<br />

Contract Administration Front Desk<br />

Engineer’s Estimate N/A<br />

Number <strong>of</strong> Proposals<br />

Received<br />

Planholders list:<br />

12/31/10


RFP for <strong>Oakland</strong> Fire Department Pre-Employment Background Investigations<br />

License Required Qualified Investigations Consultant<br />

Project Number<br />

N/A<br />

Fees<br />

Free or $9.05 if mailed<br />

Pre-Proposal Meeting Wednesday, August 5, 2009 at 11:30 a.m.<br />

250 Frank H. Ogawa Plaza, Suite 3341<br />

Skyline Conference Room<br />

Proposals Due<br />

Friday, August 28, 2009 at 2:00 p.m.<br />

250 Frank H. Ogawa Plaza, Suite 3341<br />

Contract Administration Front Desk<br />

Engineer’s Estimate N/A<br />

Number <strong>of</strong> Proposals<br />

Received<br />

Planholders list:<br />

Castle Branch, All Clear Screening Services, Inc.,<br />

12/31/10


RFP for <strong>Oakland</strong> Fire Department Employee Assistance Program<br />

License Required Qualified Medical Service Provider Consultants<br />

Project Number<br />

N/A<br />

Fees<br />

Free or $9.05 if mailed<br />

Pre-Proposal Meeting Wednesday, August 5, 2009 at 11:30 a.m.<br />

250 Frank H. Ogawa Plaza, Suite 3341<br />

Skyline Conference Room<br />

Proposals Due<br />

Friday, August 21, 2009 at 2:00 p.m.<br />

250 Frank H. Ogawa Plaza, Suite 3341<br />

Contract Administration Front Desk<br />

Engineer’s Estimate N/A<br />

Number <strong>of</strong> Proposals<br />

Received<br />

Planholders list:<br />

Claremont EAP, Psych Solutions, Inc.<br />

12/31/10


RFP for the Administration <strong>of</strong> the <strong>Oakland</strong> Police Department False Alarm<br />

Reduction Unit THIS PROJECT HAS 1 ADDENDUM<br />

License Required<br />

Project Number<br />

N/A<br />

Fees<br />

Pre-Proposal Meeting<br />

Free or $9.05 if mailed<br />

Wednesday, July 29, 2009 at 10:30 a.m.<br />

250 Frank H. Ogawa Plaza, Suite 3341<br />

Skyline Conference Room<br />

Proposals Due<br />

Thursday, August 17, 2009 at 2:00 p.m.<br />

250 Frank H. Ogawa Plaza, Suite 3341<br />

Contract Administration Front Desk<br />

Engineer’s Estimate $246,750.00<br />

Number <strong>of</strong> Proposals<br />

Received<br />

Planholders list:<br />

Janitorial Pr<strong>of</strong>essionals, Enable Point, Inc., Kidd<br />

International, ATB Services,<br />

12/31/10


RFP for Audit Services for Sales, Use and Property Taxes<br />

License Required<br />

Project Number<br />

H63640<br />

Fees<br />

$30.00 or $39.05 if mailed<br />

Pre-Proposal Meeting Wednesday, July 1, 2009 at 10:00 a.m.<br />

250 Frank H. Ogawa Plaza, Suite 4304<br />

Broadway Conference Room<br />

Proposals Due<br />

Thursday, July 16, 2009 at 2:00 p.m.<br />

250 Frank H. Ogawa Plaza, Suite 3341<br />

Contract Administration Front Desk<br />

Engineer’s Estimate $300,000.00<br />

Number <strong>of</strong> Proposals 2<br />

Received<br />

Planholders list:<br />

MuniServices, LLC, HDL Companies<br />

12/31/10


RFP for Zero Waste System Design Modeling/Testing and Procurement Technical<br />

Assistance<br />

License Required<br />

Project Number<br />

H63640<br />

Fees<br />

Pre-Proposal Meeting<br />

$Free or $9.05 if mailed<br />

Thursday, April 30, 2009 at 10:00 a.m.<br />

One Frank H. Ogawa Plaza,<br />

Hearing Room 1<br />

Proposals Due<br />

Wednesday, May 13, 2009 at 2:00 p.m.<br />

250 Frank H. Ogawa Plaza, Suite 3341<br />

Contract Administration Front Desk<br />

Engineer’s Estimate Not to Exceed $300,000.00<br />

Number <strong>of</strong> Proposals<br />

Received<br />

Planholders list:<br />

RB Consulting Group, Inc., WIH Resource Group, Cascada<br />

Consulting Group, SERA, Inc., HF&H Consultants, Inc.,<br />

R&M Environmental, Herrera Environmental Consultants,<br />

Economics, Inc., RJ Proto Consulting, Integrated Waste<br />

Mgmt., Alternate Resources, Sound Resource Mgmt Grp.,<br />

Circle Point, Waste Sleuth, Environmental Innovations<br />

Corp., Cal Recovery, Inc., Synergis, Gershman, Brickner &<br />

Brohon, Inc., HDR Engineering, Environmental Planning<br />

Consultants, URS Corp., Sustainable Concepts Studio, Gary<br />

Liss & Assoc., ESA, AECOM, Pacific Waste Consulting<br />

Grp., MSE Grp., Brian Strrat & Assoc.,<br />

12/31/10


2009-2012 As-Needed Transportation Planning Services<br />

License Required Employment Services/ Recreation<br />

Project Number<br />

N/A<br />

Fees<br />

$10.00 or $15.00 if mailed<br />

Pre-Proposal Meeting Thursday, March 19, 2009 at 2:00 p.m.<br />

250 Frank H. Ogawa Plaza,<br />

Broadway Conference Room 4 th Floor<br />

Proposals Due<br />

Thursday, April 2, 2009 at 2:00 p.m.<br />

250 Frank H. Ogawa Plaza, Suite 3341<br />

Contract Administration Front Desk<br />

Engineer’s Estimate $500,000 (Type A SOQ)<br />

$150,000 (Type B SOQ)<br />

Number <strong>of</strong> Proposals<br />

Received<br />

Planholders list:<br />

KOA Corporation, DKS Associates, JRDV Architects,<br />

Reconnection America, Arthulia, EMC Research, Inc.,<br />

Hausrath Economics Group, CHS Consulting Group,<br />

Community Design & Architecture, Bottomley Design &<br />

Planning, HNTB, Alta Planning & Design, Watry Design,<br />

AECOM, EnviroTrans Solutions, MIG, Inc., Eisen/Letunic,<br />

Nelson/Nygaard, M<strong>of</strong>fatt & Nichol, Dowling Associates,<br />

Ecorp Consulting, Inc., DC&E, Strategic Economics, AE3<br />

Partners, Fehr & Peers, Circle Point, Wilbur Smith<br />

Associates, Kimley Horn Associates, Woodrodgers, Questa<br />

Engineering, IPA Planning Solutions<br />

12/31/10


RFP Keep <strong>Oakland</strong> Clean and Beautiful Division<br />

Team <strong>Oakland</strong> Program 2009-2010<br />

PROJECT CANCELLED<br />

License Required Employment Services/ Recreation<br />

Project Number<br />

N/A<br />

Fees<br />

Pre-Proposal Meeting<br />

Free or $9.05 if mailed<br />

Friday, February 6, 2009 at 1:00 p.m.<br />

250 Frank H. Ogawa Plaza, Suite 3341<br />

Contract Administration<br />

Skyline Conference Room 3 rd Floor<br />

Proposals Due<br />

Friday, February 20, 2009 at 2:00 p.m.<br />

250 Frank H. Ogawa Plaza, Suite 3341<br />

Contract Administration Front Desk<br />

Engineer’s Estimate $249, 000.00<br />

Number <strong>of</strong> Proposals<br />

Received<br />

Planholders list:<br />

KC Pierce & Associates, C&C Const. Delu<br />

12/31/10


RFP Camera Surveillance Project<br />

License Required N/A<br />

Project Number<br />

N/A<br />

Fees<br />

$10.00 or $15.00 if mailed<br />

Pre-Proposal Meeting Thursday, October 23, 2008 at 10:00 a.m.<br />

4 th Floor Broadway Conference Room<br />

Proposals Due<br />

Friday, October 31, 2008 at 2:00 p.m.<br />

250 Frank H. Ogawa Plaza, Suite 3341<br />

Contract Administration Front Desk<br />

Engineer’s Estimate<br />

Number <strong>of</strong> Proposals 5<br />

Received<br />

Planholders list:<br />

12/31/10


RFP to Provide Engineering Services for Assessment Districts<br />

License Required Engineering Services<br />

Project Number<br />

N/A<br />

Fees<br />

$10.00 or $15.00 if mailed<br />

Pre-Proposal Meeting Thursday, October 23, 2008 at 10:00 a.m.<br />

6 th Floor Large Conference Room<br />

Proposals Due<br />

Friday, October 31, 2008 at 2:00 p.m.<br />

250 Frank H. Ogawa Plaza, Suite 3341<br />

Contract Administration Front Desk<br />

Engineer’s Estimate<br />

Number <strong>of</strong> Proposals 3<br />

Received<br />

Planholders list:<br />

MMS Design Assoc., Nolte Associates, Inc.<br />

12/31/10


RFP for State Lobbyist<br />

License Required<br />

Project Number<br />

Fees<br />

Pre-Proposal Meeting<br />

Proposals Due<br />

Engineer’s Estimate<br />

Number <strong>of</strong> Proposals<br />

Received<br />

Planholders list:<br />

Legislative Services<br />

N/A<br />

$10.00 or $15.00 if mailed<br />

Monday, October 6, 2008 at 10:00 a.m.<br />

1 Frank H. Ogawa Plaza<br />

1 st Floor Hearing Room 3<br />

Monday, October 13, 2008 at 2:00 p.m.<br />

250 Frank H. Ogawa Plaza, Suite 3341<br />

Contract Administration Front Desk<br />

3<br />

Townsend Public Affairs, Strategic Counsel PLC<br />

12/31/10


RFQ-2008-2011 As Needed Transportation Engineering Services<br />

License Required Transportation and Engineering Services<br />

Project Number<br />

N/A<br />

Fees<br />

$10.00 or $15.00 if mailed<br />

Pre-Proposal Meeting Thursday, October 16, 2008 at 2:00 p.m.<br />

250 Frank H. Ogawa Plaza<br />

Broadway Conference Room<br />

Proposals Due<br />

Monday, November 13, 2008 at 2:00 p.m.<br />

250 Frank H. Ogawa Plaza, Suite 3341<br />

Contract Administration Front Desk<br />

Engineer’s Estimate<br />

Number <strong>of</strong> Proposals<br />

Received<br />

Planholders list:<br />

T. Y. Lin International, Dowling Associates, MGE<br />

Engineering, Inc., URS Corp., DKS Associates, Fehr &<br />

Peers, Kimley-Horn, Wood Rodgers, Watry Design, Inc.,<br />

LAN Engineering, BKF Engineers, CHS Consulting Group,<br />

Questa Engineering Corp., Walter P. Moore, Transpedia<br />

Consulting Engineers, KOA Corporation, K.C.Pierce &<br />

Assoc., DMJM Harris/AECOM., Questa Engineering,<br />

Transportation Engineering & Planning<br />

12/31/10


RFP for the Central <strong>City</strong> East Commercial Security Pilot Program and the<br />

Coliseum Commercial Security Pilot Program <strong>Oakland</strong> California<br />

License Required Security<br />

Project Number<br />

N/A<br />

Fees<br />

$Free or $9.05 if mailed<br />

Pre-Proposal Meeting Thursday, September25, 2008 at 10:00 am<br />

In Hearing Room 1 located at 1 Frank Ogawa Plaza<br />

Proposals Due<br />

Thursday, October 2, 2008 AT 2:00 PM.<br />

250 Frank H. Ogawa Plaza, Suite 3341<br />

Contract Administration Front Desk<br />

Engineer’s Estimate<br />

Number <strong>of</strong> Proposals<br />

Received<br />

Planholders list:<br />

12/31/10


RFP for Temporary Employment Services<br />

License Required Employment Services<br />

Project Number<br />

N/A<br />

Fees<br />

$10.00 or $19.05 if mailed<br />

Pre-Proposal Meeting Friday, September12, 2008 at 9:00 am<br />

in classroom 1 located on the 2 nd floor<br />

Lionel Wilson Building<br />

150 Frank Ogawa Plaza,<br />

Proposals Due<br />

Friday, September 26, 2008 AT 2:00 PM.<br />

250 Frank H. Ogawa Plaza, Suite 3341<br />

Contract Administration Front Desk<br />

Engineer’s Estimate<br />

Number <strong>of</strong> Proposals<br />

Received<br />

Planholders list:<br />

Paradigm Staffing Solutions, Dynamic Office & Accounting<br />

Solutions, OUTSOURCE Consulting Services, Inc., RFI,<br />

Quality Staffing, Inc., Maxim Healthcare, Kelly Services,<br />

Bennatt-Pryor, Pr<strong>of</strong>essional Staffing, ACT 1, Apple One<br />

Employment Services, Diversified Personnel, Pr<strong>of</strong>essional<br />

Staffing Resources<br />

12/31/10


RFP for the CEQA Environmental Documents/CEQA Consultanting Service<br />

License Required Environmental Services Consultants<br />

Project Number<br />

N/A<br />

Fees<br />

$FREE or $9.05 if mailed<br />

Pre-Proposal Meeting Tuesday, August 19, 2008 at 2:30pm<br />

<strong>City</strong> Hall Hearing Room 3<br />

1 Frank Ogawa Plaza,<br />

Proposals Due<br />

Wednesday, September 3, 2008 AT 2:00 PM.<br />

250 Frank H. Ogawa Plaza, Suite 3341<br />

Contract Administration Front Desk<br />

Engineer’s Estimate<br />

Number <strong>of</strong> Proposals<br />

Received<br />

Planholders list:<br />

PMC, PBS &J, Lamphier-Gregory, Agilent Consulting<br />

12/31/10


RFQ For Transportation Engineering Services on Intelligent Transportation<br />

Systems (ITS) Projects<br />

License Required Transportation Engineering Firms or Civil Engineering<br />

Project Number<br />

N/A<br />

Fees<br />

$10 or $15 if mailed<br />

Pre-Proposal Meeting Thursday, August 7, 2008<br />

Proposals Due<br />

Thursday, August 28, 2008 @ 2:00 p.m.<br />

250 Frank H. Ogawa Plaza, Suite 3341<br />

Contract Administration Front Desk<br />

Engineer’s Estimate<br />

Number <strong>of</strong> Proposals 3<br />

Received<br />

Planholders list:<br />

DKS Associates, KOA Corporation, TJKM Transportation<br />

Consultants, Kimley-Horn Associates, Inc,, Dowling<br />

Associates, Access Design & Construction, FEHR & Peers<br />

12/31/10


RFP/RFQ For the <strong>Oakland</strong> Police Department<br />

SEXUAL ASSAULT EXAMINATIONS<br />

License Required N/A<br />

Project Number<br />

N/A<br />

Fees<br />

Pre-Proposal Meeting PRE-PROPOSAL MEETING HAS BEEN WAIVED<br />

Proposals Due<br />

Wednesday June 25, 2008 @ 2:00 p.m.<br />

250 Frank H. Ogawa Plaza, Suite 3341<br />

Contract Administration Front Desk<br />

Engineer’s Estimate<br />

Number <strong>of</strong> Proposals 2<br />

Received<br />

Planholders list:<br />

VBS Services, Central Medical Laboratories<br />

12/31/10


RFP/RFQ For the <strong>Oakland</strong> Police Department<br />

PERSONNEL DIVISION/PERSONNEL ASSESSMENT SYSTEM(PAS)<br />

License Required N/A<br />

Project Number<br />

N/A<br />

Fees<br />

Pre-Proposal Meeting PRE-PROPOSAL MEETING HAS BEEN WAIVED<br />

Proposals Due<br />

Wednesday June 25, 2008 @ 2:00 p.m.<br />

250 Frank H. Ogawa Plaza, Suite 3341<br />

Contract Administration Front Desk<br />

Engineer’s Estimate<br />

Number <strong>of</strong> Proposals 1<br />

Received<br />

Planholders list:<br />

Michael Palmertree, MFT<br />

12/31/10


RFP for Special Inspection and Testing Services for the <strong>Oakland</strong> Museum <strong>of</strong><br />

California Renovation Project* THIS IS NOT A CITY OF OAKLAND PROJECT*<br />

License Required N/A<br />

Project Number<br />

N/A<br />

Fees<br />

Pre-Proposal Meeting<br />

Proposals Due<br />

Engineer’s Estimate<br />

Number <strong>of</strong> Proposals<br />

Received<br />

Planholders list:<br />

Monday June 16, 2008 @ 10:00 a.m.<br />

Mr. David Zainer, ProPM, Inc.<br />

3470 Mt. Diablo Blvd. Suite A-310<br />

Lafayette, CA 94549<br />

THIS IS NOT A CITY OF OAKLAND PROJECT<br />

12/31/10


RFP for Contract Auditing Services for the Public Works Agency-REVISED<br />

License Required N/A<br />

Project Number<br />

N/A<br />

Fees FREE- If Mailed $9.05<br />

Pre-Proposal Meeting Monday, March 31, 2008 at 10:00 a.m.<br />

<strong>City</strong> Hall, Hearing Room 3<br />

First Floor<br />

Proposals Due<br />

Tuesday April 11, 2008 @ 2:00 p.m.<br />

250 Frank H. Ogawa Plaza, Suite 3341<br />

Contract Administration Front Desk<br />

Engineer’s Estimate<br />

Number <strong>of</strong> Proposals 4<br />

Received<br />

Planholders list:<br />

MGT <strong>of</strong> America<br />

12/31/10


RFP for Department <strong>of</strong> Human Services Multipurpose Senior Services Programs<br />

and Linkages<br />

License Required Human Services, Medical<br />

Project Number<br />

G307410<br />

Fees FREE- If Mailed $9.05<br />

Pre-Proposal Meeting Thursday March 20, 2008 at 2:30 p.m.<br />

Skyline Conference Room, 3 rd Floor<br />

Proposals Due<br />

Tuesday April 2, 2008 @ 2:00 p.m.<br />

250 Frank H. Ogawa Plaza, Suite 3341<br />

Contract Administration Front Desk<br />

Engineer’s Estimate<br />

Number <strong>of</strong> Proposals 6<br />

Received<br />

Planholders list:<br />

Community Care Services, Alta Bates Summit, Maxm<br />

Healthcare, Right at Home<br />

12/31/10


RFP for Keep <strong>Oakland</strong> Clean and Beautiful Division Team <strong>Oakland</strong> Program 2008-<br />

2009<br />

License Required N/A<br />

Project Number<br />

N/A<br />

Fees FREE- If Mailed $9.05<br />

Pre-Proposal Meeting Thursday March 20, 2008 at 10:30 a.m.<br />

Skyline Conference Room, 3 rd Floor<br />

Proposals Due<br />

Thursday April 10, 2008 @ 2:00 p.m.<br />

250 Frank H. Ogawa Plaza, Suite 3341<br />

Contract Administration Front Desk<br />

Engineer’s Estimate<br />

Number <strong>of</strong> Proposals 2<br />

Received<br />

Planholders list:<br />

LAO Family Community, East Bay Conservation<br />

Corps.(Civiccorps Schools), Emile Durelde<br />

12/31/10


RFP for <strong>Oakland</strong> Green Jobs Corps<br />

License Required N/A<br />

Project Number<br />

N/A<br />

Fees $10.00- If Mailed $15.00<br />

Pre-Proposal Meeting Monday March 10, 2008 at 1:30 p.m.<br />

<strong>City</strong> Hall Hearing Room, 1<br />

Proposals Due<br />

Thursday April 3, 2008 @ 2:00 p.m.<br />

250 Frank H. Ogawa Plaza, Suite 3341<br />

Contract Administration Front Desk<br />

Engineer’s Estimate<br />

Number <strong>of</strong> Proposals 3<br />

Received<br />

Planholders list:<br />

Green Consultants, RTTC, Rising Sun Energy Center, Inter-<br />

<strong>City</strong> Services, Inc., Cypress Mandela Training Center, Inc.,<br />

Green Consulting Service, The Youth Employment<br />

Partnership, Presley & Associates<br />

12/31/10


RFP for Security Guard Services-REBID<br />

License Required N/A<br />

Project Number<br />

N/A<br />

Fees $10.00- If Mailed $15.00<br />

Pre-Proposal Meeting Thursday February 28, 2008 at 10:00 a.m.<br />

Skyline Conference Room 3rd Floor<br />

Proposals Due<br />

Tuesday March 11, 2008 @ 2:00 p.m.<br />

250 Frank H. Ogawa Plaza, Suite 3341<br />

c/o Contract Administration<br />

Engineer’s Estimate<br />

Number <strong>of</strong> Proposals 7<br />

Received<br />

Planholders list:<br />

ANI Private Security & Patrol, Silicon Valley Security &<br />

Patrol, McCoy’s Patrol Service, Arrakis Pr<strong>of</strong>. Svc.,<br />

NCLN20., Inc., ABC Security, Allied Barton, Pride<br />

Security, National Security, International Services, Inc.,<br />

Cypress Security, LLC, McCoy’s Patrol Service,<br />

12/31/10


RFP for Security Guard Services<br />

License Required N/A<br />

Project Number<br />

N/A<br />

Fees $10.00- If Mailed $15.00<br />

Pre-Proposal Meeting Wednesday January 2, 2008 at 10:00 a.m.<br />

Skyline Conference Room 3rd Floor<br />

Proposals Due<br />

Wednesday January 16, 2008 @ 2:00 p.m.<br />

250 Frank H. Ogawa Plaza, Suite 3341<br />

c/o Contract Administration<br />

Engineer’s Estimate<br />

Number <strong>of</strong> Proposals 7<br />

Received<br />

Planholders list:<br />

AMI Private Security & Patrol, Inc., C.I.S.S.,Arrakis Pr<strong>of</strong>.<br />

Serv., American Discount Security, Sidebar Security, Stowe<br />

Security Specialist, Cypress Sercurity, LLC., International<br />

Services, Inc., ABC Security Service, Inc., WSA &<br />

Associates, Inc.<br />

12/31/10


RFP for Graphic Design Services<br />

License Required N/A<br />

Project Number<br />

N/A<br />

Fees $Free- If Mailed $9.05<br />

Pre-Proposal Meeting Thursday December 13, 2007 at 9:00 a.m.<br />

Broadway Conference Room 4 th Floor<br />

Proposals Due<br />

Tuesday January 8, 2008 @ 2:00 p.m.<br />

250 Frank H. Ogawa Plaza, Suite 3341<br />

c/o Contract Administration<br />

Engineer’s Estimate Not to Exceed $100,000<br />

Number <strong>of</strong> Proposals 11<br />

Received<br />

Planholders list:<br />

CED, Inc., Sue Kearny Graphic Craftwoman, O’Rorke, Inc.,<br />

Badali Design, A Media, MMM Design, Circle Point, Liu-<br />

Johnson Design, L & D Printing, Sphinx Graphics,<br />

Schenker Design, Real Time Design, Jung Design, Gigantic<br />

Idea Studio, BE Graphics & Design, Winning Strategies,<br />

Pat Davis Design Group, Arrakis Pr<strong>of</strong>essional Service,<br />

Cowan Communication Arts, Allegra Consulting, Inc.,<br />

12/31/10


RFQ and RFP for Construction Manager at Risk/General Contractor Services for<br />

the <strong>City</strong> <strong>of</strong> Okaland for the Fire Station No.18 Project and or East <strong>Oakland</strong> Sports<br />

Center ProjectDesign Services<br />

License Required B<br />

Project Number<br />

N/A<br />

Fees $10.00- If Mailed $14.50<br />

Pre-Proposal Meeting<br />

Proposals Due<br />

Engineer’s Estimate<br />

Number <strong>of</strong> Proposals<br />

Received<br />

Planholders list:<br />

Mandatory Thursday December 6, 2007 at 9:30 a.m.<br />

Hearing Room 2 <strong>City</strong> Hall<br />

One Frank Ogawa Plaza<br />

Wednesday December 19, 2007 @ 10:00 a.m.<br />

250 Frank H. Ogawa Plaza, Suite 3341<br />

c/o Contract Administration<br />

Fire Station 18-$7 million, East <strong>Oakland</strong> Sports Center-<br />

$11.7 million<br />

Swinerton Builders, Turner Constuction, WE Lyons<br />

Construction, West Bay Builders, CED, Inc., BBI<br />

Construction, Access Design & Construction, K.O.O.<br />

Construction, Inc., Cooper Pugeda Mgmt, Inc., W.A.<br />

Thomas Co., Inc., Acumen Building Enterprises, Inc.,<br />

12/31/10


RFP for OFD Emergency Medical Services Disaster Specialist<br />

License Required Consulting Training Firms<br />

Project Number<br />

G262710<br />

Fees $Free- If Mailed $9.05<br />

Pre-Proposal Meeting Thursday November 29, 2007 at 11:00 a.m.<br />

Skyline Conference Room 3 rd Floor<br />

Proposals Due<br />

Wednesday December 12, 2007 @ 2:00 p.m.<br />

250 Frank H. Ogawa Plaza, Suite 3341<br />

c/o Contract Administration<br />

Engineer’s Estimate N/A<br />

Number <strong>of</strong> Proposals<br />

Received<br />

Planholders list:<br />

12/31/10


RFP for Hazardous and Universal Waste Services REVISED<br />

License Required N/A<br />

Project Number<br />

N/A<br />

Fees $10.00- If Mailed $19.05<br />

Pre-Proposal Meeting Thursday October 25, 2007 at 10:00 p.m.<br />

Fox Conference Room 5 th Floor<br />

Proposals Due<br />

Friday November 16, 2007 @ 2:00 p.m.<br />

250 Frank H. Ogawa Plaza, Suite 3341<br />

c/o Contract Administration<br />

Engineer’s Estimate Not to Exceed $149,000<br />

Number <strong>of</strong> Proposals 2<br />

Received<br />

Planholders list:<br />

Electronic Waste Management, Bayview Environmental,<br />

Morgan Environmental Services, Inc., Clean Harbors<br />

Environmental Services, Filter Recycling Service, Decon<br />

Environmental, General Environmental Management, Inc.,<br />

Universal Waste Management, Inc., Electronic Waste<br />

Management, MSE , ARC International, CED, Inc.,<br />

12/31/10


RFP for Asbestos/ Lead-Based Paint/Mold Consulting Services<br />

License Required N/A<br />

Project Number<br />

N/A<br />

Fees $10.00- If Mailed $19.05<br />

Pre-Proposal Meeting Wednesday October 24, 2007 at 2 p.m.<br />

Fox Conference Room 5 th Floor<br />

Proposals Due<br />

Friday November 16, 2007 @ 2:00 p.m.<br />

250 Frank H. Ogawa Plaza, Suite 3341<br />

c/o Contract Administration<br />

Engineer’s Estimate Not to Exceed $250,000<br />

Number <strong>of</strong> Proposals 9<br />

Received<br />

Planholders list:<br />

IHI Environmental, MACTEC, SCA Environmental RGA<br />

Environmental, ACC Environmental Schutze & Associates,<br />

Bayview Environmental, ATC Associates, Inc., Ninyo &<br />

Moore, Millennium Consulting, AEI Consultants, Winzler<br />

& Kelly, Vista Environmental Consulting, PSI, Inc. MSE,<br />

Kellco Macs, Bureau Veritas North America, Inc.,<br />

12/31/10


RFP for Environmental Consulting Services<br />

License Required N/A<br />

Project Number<br />

N/A<br />

Fees $10.00- If Mailed $19.05<br />

Pre-Proposal Meeting Wednesday October 24, 2007 at 10:00 a.m.<br />

Fox Conference Room 5 th Floor<br />

Proposals Due<br />

Friday November 16, 2007 @ 2:00 p.m.<br />

250 Frank H. Ogawa Plaza, Suite 3341<br />

c/o Contract Administration<br />

Engineer’s Estimate Not to Exceed $750,000<br />

Number <strong>of</strong> Proposals 19<br />

Received<br />

Planholders list:<br />

OTG Enviroengineering Solutions, Inc., LFR, Inc.,<br />

Kleinfelder, Inc., Strategic Engineering,& Science, Inc.,<br />

MACTEC, Geomatrix Consultants, Weiss Associates, SCA<br />

Environmental, TRC, ACC, Treadwell & Rollo, Schutze &<br />

Associates, Bayview Environmental, Ninyo & Moore, The<br />

Source Group, Morgan Environmental Services, Inc., ENSR<br />

Millennium Consulting, Erler & Kalinonski, Inc., Nichols<br />

Consulting Engineering, Kennedy/Jenks Consultants,<br />

Winzler & Kelly, Terrasearch, Inc., ATC Associates, Inc.,<br />

Baseline , R&M Environmental, PSI, Inc. MSE, Burns &<br />

McDonnell, Hygienetics Environmental Services, 4 Leaf ,<br />

Inc., AEI Consultants, Northgate Environmental,SOMA<br />

Environmental, Weston Solutions, CED, Inc., Aliquot<br />

Associates<br />

12/31/10


RFP Civil Engineering Design Services for 7 th St. West <strong>Oakland</strong> Transit Village in<br />

<strong>Oakland</strong>, California<br />

License Required N/A<br />

Project Number<br />

G313120<br />

Fees $Free- If Mailed $9. 05<br />

Pre-Proposal Meeting Thursday October 25, 2007 at 9:00 a.m.<br />

Skyline Conference Room 3 rd Floor<br />

Proposals Due<br />

Friday November 9, 2007 @ 2:00 p.m.<br />

250 Frank H. Ogawa Plaza, Suite 3341<br />

c/o Contract Administration<br />

Engineer’s Estimate $2,600.000<br />

Number <strong>of</strong> Proposals 6<br />

Received<br />

Planholders list:<br />

Kimley- Horn & Associates, BKF Engineers, Sandis,<br />

Amphion, TransSystems Corp., Bayview Environmental,<br />

Bruce Jett Associates, KOA Corporation, Robert La Rocca<br />

& Associates, MSE, M<strong>of</strong>fatt& Nichol, RBF Consulting,<br />

Keller Mitchell, ESI Engineers, Golden Associates, , BMB<br />

Construction Properties, Gates & Associates, WRT, Harris<br />

& Associates, Terrasearch, Inc., Winzler & Kelly, Sasaki<br />

Associates, Inc., Adrienne Wong Associates, CED, Inc.,<br />

12/31/10


RFP /RFQ for the <strong>Oakland</strong> Police Department Counseling Program for Sworn<br />

Members/Dependents<br />

License Required N/A<br />

Project Number<br />

N/A<br />

Fees $Free- If Mailed $9.05<br />

Pre-Proposal Meeting Wednesday October 17, 2007 at 10:00 a.m.<br />

Skyline Conference Room 3 rd Floor<br />

Proposals Due<br />

Wednesday October 24, 2007 @ 2:00 p.m.<br />

250 Frank H. Ogawa Plaza, Suite 3341<br />

c/o Contract Administration<br />

Engineer’s Estimate $108,000.00<br />

Number <strong>of</strong> Proposals 2<br />

Received<br />

Planholders list:<br />

Magellan Health Services, Managed Health Network,<br />

Concern EAP<br />

12/31/10


RFP for the Municipal Swimming Pools REVISED<br />

License Required N/A<br />

Project Number<br />

N/A<br />

Fees $10.00- If Mailed $19.05<br />

Pre-Proposal Meeting Wednesday September 12, 2007 at 9:00 a.m.<br />

Skyline Conference Room 3 rd Floor<br />

Proposals Due<br />

Tuesday October 30, 2007 @ 2:00 p.m.<br />

250 Frank H. Ogawa Plaza, Suite 3341<br />

c/o Contract Administration<br />

Engineer’s Estimate $250,000.00<br />

Number <strong>of</strong> Proposals 0<br />

Received<br />

Planholders list:<br />

Salas O’Brien Engineering, EMCOR Energy Services, MSE<br />

Group, Gutierrez Assoc., Rockridge Builders, Weiss<br />

Associates, Versar, Inc.<br />

12/31/10


RFP for Civil Engineering Design Services for Adeline Street Overhead in <strong>Oakland</strong><br />

California<br />

License Required N/A<br />

Project Number<br />

N/A<br />

Fees $FREE– If Mailed $19.05<br />

Pre-Proposal Meeting Wednesday July 11, 2007 at 2:00 p.m.<br />

Skyline Conference Room 3 rd Floor<br />

Proposals Due<br />

Friday August 10, 2007 @ 2:00 p.m.<br />

250 Frank H. Ogawa Plaza, Suite 3341<br />

c/o Contract Administration<br />

Engineer’s Estimate $160,000.00 to $170,000.00<br />

Number <strong>of</strong> Proposals 3<br />

Received<br />

Planholders list:<br />

Biggs Cardosa, M<strong>of</strong>fatt & Nichol, KPFF Consulting<br />

Engineers, ESI, MGE, Inc.Jacobs Engineering, Winzler &<br />

Kelly, URS Corporation<br />

12/31/10


RFP for As Needed Civil Engineering Services for Various <strong>City</strong> <strong>of</strong> <strong>Oakland</strong> Projects<br />

License Required N/A<br />

Project Number<br />

N/A<br />

Fees $FREE– If Mailed $19.05<br />

Pre-Proposal Meeting Thursday May 17, 2007 at 2:00 p.m.<br />

<strong>City</strong> Hall, Hearing Room No.1<br />

Proposals Due<br />

Friday June 8, 2007 @ 2:00 p.m.<br />

250 Frank H. Ogawa Plaza, Suite 3341<br />

c/o Contract Administration<br />

Engineer’s Estimate $200,000.00 to $350,000.00<br />

Number <strong>of</strong> Proposals 17<br />

Received<br />

Planholders list:<br />

Greenwood & Moore, Inc., Biggs Cardosa Associates,<br />

Rajappan & Meyer, Wallace Group, Aliquot Associates,<br />

Inc., James Wong & Associates, Earthquake & Structures,<br />

Bay Construction Co.,Oberkamper & Associates, Winzler &<br />

Kelly Consulting Engineers, HHTEC, KCA Engineers,<br />

MACTEC , Van Maren & Associates, TRC, Eagle<br />

Engineering Construction , Inc., Triad/Holmes Associates,<br />

Testing Engineers, Rajappan & Meyer, Testing Engineers,<br />

Chaudhary & Associates, Phillip Williams & Associates<br />

Ltd., Cal Engineering & Geology, Luk and Associate,<br />

Harris & Associates, Katz, Okitsu & Associates, URS<br />

Corporation, Nichols Consulting Engineers MSE<br />

12/31/10


RFP and RFQ for Construction Manager At Risk/General Contractor Services for<br />

the <strong>City</strong> <strong>of</strong> <strong>Oakland</strong> and <strong>Oakland</strong> Museum <strong>of</strong> California – <strong>Oakland</strong> Museum<br />

Renovation Project<br />

License Required N/A<br />

Project Number<br />

C239611<br />

Fees $10.00– If Mailed $14.50<br />

Pre-Proposal Meeting<br />

Proposals Due<br />

Engineer’s Estimate<br />

Number <strong>of</strong> Proposals<br />

Received<br />

Planholders list:<br />

Thursday May 10, 2007 at 10:00 a.m.<br />

Restaurant/Cafeteria <strong>of</strong> the <strong>Oakland</strong> Museum<br />

1000 Oak Street, Second Floor<br />

<strong>Oakland</strong>, CA MANDATORY<br />

Thursday May 22, 2007 @ 2:00 p.m.<br />

250 Frank H. Ogawa Plaza, Suite 3341<br />

c/o Contract Administration<br />

10.8+ million (estimated)<br />

3<br />

Oliver & Co., BBI Construction, PROPM, Inc., Swinerton<br />

Builders, Museum, NBC General Contractors Corp., Vance<br />

Brown, Inc., MCA, Cahill Contractors, Inc., W.E. Lyons<br />

Construction MSE MWA , HQE, Inc.,<br />

RFP for Lake Merritt Clean Lake Contract<br />

License Required N/A<br />

Project Number<br />

N/A<br />

Fees $FREE – If Mailed $9.05<br />

Pre-Proposal Meeting Monday April 30, 2007 at 2:30p.m.<br />

Fox Conference Room 5 th Floor<br />

250 Frank H. Ogawa Plaza<br />

Proposals Due<br />

Thursday May 10, 2007 @ 2:00 p.m.<br />

250 Frank H. Ogawa Plaza, Suite 3341<br />

c/o Contract Administration<br />

Engineer’s Estimate Not to exceed $300,000<br />

Number <strong>of</strong> Proposals 1<br />

Received<br />

Planholders list:<br />

Mike Farmer Janitorial, The Lake Merritt Institute, Drake &<br />

Drakes Pipeline Construction<br />

12/31/10


RFP for As- Needed Civil Engineering<br />

License Required N/A<br />

Project Number<br />

N/A<br />

Fees $10.00 – If Mailed $19.05<br />

Pre-Proposal Meeting Wednesday January 24, 2007 at 10:00 a.m.<br />

Hearing Room 1, <strong>City</strong> Hall<br />

1 Frank H. Ogawa Plaza<br />

Proposals Due<br />

Friday February 16, 2007 @ 2:00 p.m.<br />

250 Frank H. Ogawa Plaza, Suite 3341<br />

c/o Contract Administration<br />

Engineer’s Estimate $150,000-$350,000<br />

Number <strong>of</strong> Proposals 11<br />

Received<br />

Planholders list:<br />

Korve/DMJM Harris, MacTec, M<strong>of</strong>fatt & Nichol, Ty Lin<br />

International, DTN Engineers, Inc., Willdan, Kimley Horn<br />

& Assoc., Bellecci & Assoc., Winzler & Kelly, Rail<br />

Surveyors & Engineers, Inc., Sikaroudi & Assoc.,<br />

Waterworks Engineers, Allquot Assoc.,BKF Engineers,<br />

WoodRodgers, DKS Assoc., TRC, Magdave Assoc. Inc.,<br />

F.E., Jordan Assoc., Inc.,Kennedy Jenks, MSE Group, URS<br />

Corp.,<br />

12/31/10


RFP for Work Management System<br />

License Required N/A<br />

Project Number<br />

N/A<br />

Fees Free – If Mailed $9.05<br />

Pre-Proposal Meeting Monday November 13, 2006 at 10:00 a.m.<br />

Skyline Conference Room,<br />

250 Frank H. Ogawa Plaza, 3rd Floor<br />

Proposals Due<br />

Tuesday December 12, 2006 @ 2:00 p.m.<br />

250 Frank H. Ogawa Plaza, Suite 3341<br />

c/o Contract Administration<br />

Engineer’s Estimate N/A<br />

Number <strong>of</strong> Proposals 6<br />

Received<br />

Planholders list:<br />

Symbol, MSA Systems, Inc., True Point Solutions, Accela<br />

Govt. S<strong>of</strong>tware, SPL WorldGroup, Inc., Hansen ,<br />

Interlocsolutions, Walsh Wireless Solutions,Westib<br />

Solutions, Inc., Vestra Resources, Inc., Motorola, Inc.,<br />

Farallon Geographics, Inc., AEKO Consulting,<br />

Environmental Systems Research Institute, Inc., Carter<br />

Burgess, Corrigo, Infor, Cingular Wireless, Westin<br />

Solutions Through Technology, Wenns<strong>of</strong>t, Woolpert,<br />

Inc.,Hansen Informations Technologies, God So Loved You<br />

Min, Inc., Azteca Systems, Inc.,AFKO Consulting, Drake&<br />

Drake Pipeline Consulting, Interloc Solutions, Inc., RJN<br />

Group, Inc.,<br />

12/31/10


RFP for The Operation and Management <strong>of</strong> Thirteen <strong>City</strong> <strong>of</strong> <strong>Oakland</strong> Off-Street<br />

Parking Facilities<br />

License Required Qualified Parking Contractors<br />

Project Number<br />

N/A<br />

Fees $10.00 – If Mailed $19.05<br />

Pre-Proposal Meeting Thursday, October 5, 2006 at 2:00 p.m.<br />

Broadway Conference Room,<br />

250 Frank H. Ogawa Plaza, 4 th Floor<br />

Proposals Due<br />

Tuesday October 24, 2006 @ 2:00 p.m.<br />

250 Frank H. Ogawa Plaza, Suite 3341<br />

c/o Contract Administration<br />

Engineer’s Estimate N/A<br />

Number <strong>of</strong> Proposals 6<br />

Received<br />

Planholders List:<br />

Parking Concepts, Express Parking Management, Bay Area<br />

Parking Douglas Parking Co., Pacific Park Management,<br />

Imperial Parking., NM Parking, Central Parking System,<br />

Standard Parking, Five Star Parking<br />

RFP for As Needed Architectural Services for Various Capital Improvement<br />

Projects<br />

License Required Architectural Firms<br />

Project Number<br />

N/A<br />

Fees $10.00 – If Mailed $19.05<br />

Pre-Bid Meeting<br />

Tuesday, September 5, 2006 at 2:00 p.m.<br />

<strong>City</strong> Hall Hearing Room 1,<br />

One <strong>City</strong> Hall Plaza<br />

Proposals Due<br />

Friday September 29, 2006 @ 2:00 p.m.<br />

250 Frank H. Ogawa Plaza, Suite 3341<br />

c/o Contract Administration<br />

Engineer’s Estimate $150,000 to $350,000<br />

Number <strong>of</strong> Proposals 21<br />

Received<br />

Planholders list:<br />

Kirk Peterson & Associates, Guiterrez/Associates, Noll & Tam, Shah<br />

Kawasaki, Ratcliff, Komorous-Towney Architects, Kava Massih<br />

Architects, FMG Architects, Frank Architects, Byrens Associates,<br />

Jeffrey E. Wong Architects, KPA, RPR Architects, Colland Jang<br />

Architecture, VBN Architects, MacDonald Architects, Kenney and<br />

Associates, Don Dommer Associates, YHLA Architects, Famous<br />

Designs Architects, Inc., Claudia Falconer Architects, Salas O’brien<br />

Engineers, Greenbank Associates, Lowney Architecure, MWM<br />

Architects, Inc., Murakami/Nelson, SJ Engineers, Michael Willis<br />

Architects, Muller Caufield Architects,<br />

12/31/10


RFP for As Needed Geotechnical Consultants<br />

License Required Geotechnical Engineering Firms<br />

Project Number<br />

N/A<br />

Fees $10.00 – If Mailed $15.00<br />

Pre-Bid Meeting<br />

Wednesday, June 14, 2006 at 10:00 a.m.<br />

<strong>City</strong> Hall Hearing Room 1,<br />

One <strong>City</strong> Hall Plaza<br />

Proposals Due<br />

Thursday July 06, 2006 @ 2:00 p.m.<br />

250 Frank H. Ogawa Plaza, Suite 3341<br />

c/o Contract Administration<br />

Engineer’s Estimate<br />

Number <strong>of</strong> Proposals<br />

Received<br />

Planholders List<br />

RFP for As Needed Landscape Architects<br />

License Required Landscape Architectural Firms<br />

Project Number<br />

N/A<br />

Fees $10.00 – If Mailed $14.50<br />

Pre-Bid Meeting<br />

Wednesday, June 21, 2006 at 10:00 a.m.<br />

<strong>City</strong> Hall Hearing Room 1,<br />

One <strong>City</strong> Hall Plaza<br />

Proposals Due<br />

Wednesday, July 12, 2006 @ 2:00 p.m.<br />

250 Frank H. Ogawa Plaza, Suite 3341<br />

c/o Contract Administration<br />

Engineer’s Estimate<br />

Number <strong>of</strong> Proposals<br />

Received<br />

Planholders List<br />

12/31/10


RFP for Team <strong>Oakland</strong> Program<br />

License Required Youth Serving Organizations or Closely Related<br />

Pr<strong>of</strong>essionals<br />

Project Number<br />

P35510<br />

Fees $10.00 – If Mailed $15.00<br />

Pre-Bid Meeting<br />

Wednesday, February 22, 2006 at 10:00 a.m.<br />

250 Frank H. Ogawa Plaza, 3 rd Floor<br />

Skyline Conference Room<br />

Proposals Due<br />

Thursday, March 23, 2006 @ 2:00 p.m.<br />

250 Frank H. Ogawa Plaza, Suite 3341<br />

c/o Contract Administration<br />

Engineer’s Estimate Not to exceed $498,000.00<br />

Number <strong>of</strong> Proposals<br />

Received<br />

Planholders List<br />

RFP for The Business Recycling Technical Assistance Program<br />

License Required Environmental, Solid Waste Consultants<br />

Project Number<br />

N/A<br />

Fees $10.00 – If Mailed $15.00<br />

Pre-Bid Meeting<br />

Tuesday, January 31, 2006 at 9:00 a.m.<br />

250 Frank H. Ogawa Plaza, 5 th Floor<br />

Fox Conference Room<br />

Proposals Due<br />

Tuesday, February 14, 2006 @ 2:00 p.m.<br />

250 Frank H. Ogawa Plaza, Suite 3341<br />

c/o Contract Administration<br />

Engineer’s Estimate $50,000.00<br />

Number <strong>of</strong> Proposals 3<br />

Received<br />

Planholders List<br />

12/31/10


RFP for Time Clock Based Time and Attendance System<br />

License Required Time Clock System, Computers, Computer S<strong>of</strong>tware<br />

Project Number<br />

N/A<br />

Fees Pick-up Free – If Mailed $9.00<br />

Pre-Bid Meeting<br />

Tuesday, November 1, 2005 at 10:00 a.m.<br />

250 Frank H. Ogawa Plaza, Suite 3341<br />

Skyline Conference Room<br />

Proposals Due<br />

Tuesday, November 22, 2005 @ 2:00 a.m.<br />

250 Frank H. Ogawa Plaza, Suite 3341<br />

c/o Contract Administration<br />

Engineer’s Estimate $50,000.00<br />

Number <strong>of</strong> Proposals<br />

Received<br />

Planholders List<br />

Studio One Art Center Asbestos and Lead-Base Materials Abatement Project and<br />

Municipal Boathouse Rehabilitation and Lakeside Park Improvement Project<br />

License Required B<br />

Project Number<br />

C244710 and C241910<br />

Fees Pick-up $10.00 – If Mailed $15.00<br />

Pre-Bid Meeting<br />

N/A<br />

Proposals Due<br />

Tuesday, June 7, 2005 @ 4:00pm<br />

250 Frank H. Ogawa Plaza, Suite 3341<br />

c/o Contract Administration<br />

Engineer’s Estimate $6,100,000.00 - $6,500,000.00 and<br />

$7,000,000.00 - $7,500,000.00<br />

Number <strong>of</strong> Proposals<br />

Received<br />

Planholders List<br />

Arnz Builders, BBI Construction, Thompson Pacific<br />

Construction, Inc., Vance Brown, Inc., West Bay Builder’s,<br />

Inc.<br />

12/31/10


RFP Revive Chinatown Pedestrian-Oriented Improvements Project<br />

License Required Civil Engineering, Landscape Architectural<br />

Project Number<br />

N/A<br />

Fees Pick-up $10.00 – If Mailed $15.00<br />

Pre-Bid Meeting<br />

Monday, May 10, 2005 @ 10:00 am<br />

250 Frank H. Ogawa Plaza, Suite 3341<br />

Skyline Conference Room<br />

Proposals Due<br />

Tuesday, May 31, 2005 @ 2:00pm<br />

<strong>City</strong> Clerk’s Office, One Frank Ogawa Plaza, First Floor<br />

Engineer’s Estimate N/A<br />

Number <strong>of</strong> Proposals<br />

Received<br />

Planholders List<br />

Lake Merritt Channel Improvement Project at the 7 th Street Flood Control Station<br />

License Required Environmental Consultants<br />

Project Number<br />

N/A<br />

Fees Pick-up $10.00 – If Mailed $15.00<br />

Pre-Bid Meeting<br />

Wednesday, April 6, 2005 @ 3:00 pm<br />

One <strong>City</strong> Hall Plaza, <strong>City</strong> Hall<br />

Hearing Room 2<br />

Qualifications Due Thursday, April 21, 2005 @ 2:00pm<br />

250 Frank H. Ogawa Plaza, Suite 3341<br />

c/o Contract Administration<br />

Engineer’s Estimate $7,500,000.00<br />

Number <strong>of</strong> Proposals<br />

Received<br />

Planholders List<br />

12/31/10


10 th Street Bridge Project at the Lake Merritt Channel<br />

License Required Civil Engineering<br />

Project Number<br />

N/A<br />

Fees Pick-up $10.00 – If Mailed $14.50<br />

Pre-Bid Meeting<br />

Wednesday, April 6, 2005 @ 3:00 pm<br />

One <strong>City</strong> Hall Plaza, <strong>City</strong> Hall<br />

Hearing Room 2<br />

Qualifications Due Wednesday, April 20, 2005 @ 2:00pm<br />

250 Frank H. Ogawa Plaza, Suite 3341<br />

c/o Contract Administration<br />

Engineer’s Estimate $6,000,000.00<br />

Number <strong>of</strong> Proposals<br />

Received<br />

Planholders List<br />

Lake Merritt Clean Lake Services<br />

License Required N/A<br />

Project Number<br />

N/A<br />

Fees Pick-up $10.00 – If Mailed $14.50<br />

Pre-Bid Meeting<br />

Tuesday, March 8, 2005 @ 1:00 pm<br />

250 Frank H. Ogawa Plaza, Suite 5357<br />

Fox Conference Room<br />

Qualifications Due Wednesday, March 23, 2005 @ 2:00pm<br />

250 Frank H. Ogawa Plaza, Suite 3341<br />

c/o Contract Administration<br />

Engineer’s Estimate $300,000.00<br />

Number <strong>of</strong> Proposals<br />

Received<br />

Planholders List<br />

12/31/10


<strong>City</strong>wide Street Survey and Pavement Management System Update<br />

License Required N/A<br />

Project Number<br />

N/A<br />

Fees Pick-up $10.00 – If Mailed $14.50<br />

Pre-Proposal Meeting Thursday, January 27, 2005 at 10:00 am<br />

250 Frank H. Ogawa Plaza, Suite 4304<br />

Broadway Conference Room<br />

Proposals Due<br />

Engineer’s Estimate $ 300,000.00<br />

Number <strong>of</strong> Proposals<br />

Received<br />

Planholders List<br />

Wednesday, February 16, 2005 @ 2:00pm<br />

PWA-Contract Administration, 250 Frank H. Ogawa Plaza,<br />

3 rd Fl, Suite 3341<br />

Inspection and Condition Assessment <strong>of</strong> the Existing Sanitary Sewers in West<br />

Grand Avenue From San Pablo to Wood Street<br />

License Required N/A<br />

Project Number<br />

N/A<br />

Fees Pick-up $10.00 – If Mailed $15.00<br />

Pre-Proposal Meeting Thursday, December 16, 2004 at 10:00 am<br />

250 Frank H. Ogawa Plaza<br />

Skyline Conference Room<br />

Proposals Due<br />

Tuesday, January 18, 2005 @ 2:00pm<br />

PWA-Contract Administration, 250 Frank H. Ogawa Plaza,<br />

3 rd Fl, Suite 3341<br />

Engineer’s Estimate $ N/A<br />

Number <strong>of</strong> Proposals<br />

Received<br />

Planholders List<br />

12/31/10


Request For Qualifications (RFQ) for As-Needed Transportation Engineering<br />

Services<br />

License Required N/A<br />

Project Number<br />

N/A<br />

Fees Pick-up $10.00 – If Mailed $14.50<br />

Pre-Proposal Meeting Wednesday, November 24, 2004 at 10:00 am<br />

250 Frank H. Ogawa Plaza, 4 th Floor<br />

Broadway Conference Room<br />

Proposals Due<br />

Wednesday, December 15, 2004 @ 2:00pm<br />

PWA-Contract Administration, 250 Frank H. Ogawa Plaza,<br />

3 rd Fl, Suite 3341<br />

Engineer’s Estimate $250,000.00 to $350,000.00<br />

Number <strong>of</strong> Proposals<br />

Received<br />

Planholders List<br />

Asbestos/Lead-Based Paint/Mold Consulting Services<br />

License Required A or C-42<br />

Project Number<br />

N/A<br />

Fees Pick-up $10.00 – If Mailed $15.00<br />

Pre-Proposal Meeting Wednesday, November 17, 2004 at 2:00 pm<br />

250 Frank H. Ogawa Plaza<br />

Fox Conference Room<br />

Proposals Due<br />

Engineer’s Estimate $200,000.00<br />

Number <strong>of</strong> Proposals<br />

Received<br />

Planholders List<br />

Wednesday, December 8, 2004 @ 2:00pm<br />

PWA-Contract Administration, 250 Frank H. Ogawa Plaza,<br />

3 rd Fl, Suite 3341<br />

12/31/10


Architectural Services for The Lake Merritt Sailboat House Renovation and the<br />

Related Retaining Walls Repairs, 568 Bellevue Avenue<br />

License Required Architectural and Engineering Design Services<br />

Project Number<br />

C242010<br />

Fees Pick-up $10.00 – If Mailed $14.00<br />

Pre-Proposal Meeting Thursday, September 30, 2004 @ 3:00pm<br />

Hearing Room 2, <strong>City</strong> Hall<br />

Proposals Due<br />

Friday, October 22, 2004 @ 2:00pm<br />

PWA-Contract Administration, 3 rd Fl, Suite 3341<br />

Engineer’s Estimate $3,100,000.00<br />

Number <strong>of</strong> Proposals<br />

Received<br />

Planholders List<br />

Environmental Consulting Services<br />

License Required Environmental Consulting Firms<br />

Project Number<br />

N/A<br />

Fees Pick-up $10.00 – If Mailed $14.00<br />

Pre-Proposal Meeting Monday, October 4, 2004 @ 10:00am<br />

Skyline Conference Room, 3 rd FL, Suite 3341<br />

Proposals Due<br />

Monday, November 1, 2004 @ 2:00pm<br />

PWA-Contract Administration, 3 rd Fl, Suite 3341<br />

Engineer’s Estimate $350,000.00<br />

Number <strong>of</strong> Proposals<br />

Received<br />

Planholders List<br />

12/31/10

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!