Download - City of Oakland
Download - City of Oakland
Download - City of Oakland
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
CITY OF OAKLAND<br />
DEPARTMENT OF CONTRACTING AND PURCHASING<br />
CONTRACT ADMINISTRATION DIVISION<br />
CURRENT REQUEST FOR QUALIFICATIONS OPPORTUNITIES<br />
RFP for the Strategic Plan for the <strong>City</strong> <strong>of</strong> <strong>Oakland</strong>’s Workforce Investment Board<br />
License Required N/A<br />
Project Number<br />
N/A<br />
Fees Fee: $10.00 Mailed $19.05<br />
Pre-Proposal Meeting Thursday, December 09, 2010 @ 10:00am<br />
One Frank H. Ogawa Plaza,<br />
Hearing Room 3<br />
Submittals Due<br />
Monday, January 3, 2011 @2PM<br />
250 Frank Ogawa Plaza, Suite 3341<br />
Contract Administration Front Desk<br />
Engineer’s Estimate<br />
Number <strong>of</strong> Bids Received<br />
Bidders and Bid Amounts<br />
Apparent Low Bid<br />
Awarded To<br />
Plan Holders<br />
12/31/10
RFP for On Call Construction Services for Various <strong>City</strong> <strong>of</strong> <strong>Oakland</strong> Projects<br />
License Required A or C8 or C42<br />
Project Number<br />
N/A<br />
Fees Fee: $10.00 Mailed $19.05<br />
Pre-Proposal Meeting Friday, August 20, 2010 @ 10:00am<br />
One Frank H. Ogawa Plaza,<br />
Hearing Room 1<br />
Submittals Due<br />
Friday September 3, 2010@2PM<br />
250 Frank Ogawa Plaza, Suite 3341<br />
Contract Administration Front Desk<br />
Engineer’s Estimate<br />
Number <strong>of</strong> Bids Received 5<br />
Bidders and Bid Amounts<br />
Apparent Low Bid<br />
Awarded To<br />
Plan Holders<br />
AJW Construction, Beliveau Engineering, Dan Peters Construction,<br />
Magdave Associates, McGuire and Hester, New Growth Landscape,<br />
12/31/10
RFP Preparation <strong>of</strong> Blight Studies and Preliminary Reports for Proposed Amendments to<br />
the Central District and Broadway/MacArthur/San Pablo Redevelopment Project Area<br />
Plans<br />
License Required N/A<br />
Project Number<br />
N/A<br />
Fees Free Mailed $19.05<br />
Pre-Proposal Meeting<br />
Friday, August 11, 2010 @ 10:00am<br />
One Frank H. Ogawa Plaza,<br />
Hearing Room 2<br />
Submittals Due<br />
Friday September 2, 2010@2PM<br />
250 Frank Ogawa Plaza, Suite 3341<br />
Contract Administration Front Desk<br />
Engineer’s Estimate<br />
Number <strong>of</strong> Bids Received 2<br />
Bidders and Bid Amounts<br />
Apparent Low Bid<br />
Awarded To<br />
Plan Holders<br />
Byrens Kim Design Works, Dowling Associates, Inc., Lumenworks<br />
Lighting Design, Inc., Magdave Associates, Inc.<br />
12/31/10
RFP for the Preparation <strong>of</strong> Environmental Impact Reports Broadway/MacArthur/ San<br />
Pablo Redevelopment Project Area Plans<br />
License Required N/A<br />
Project Number<br />
N/A<br />
Fees Fee: No Fee Mailed $19.05<br />
Pre-Proposal Meeting Wednesday, August 11, 2010 @ 11:00am<br />
One Frank H. Ogawa Plaza,<br />
Hearing Room 2<br />
Submittals Due<br />
Friday September 3, 2010 @2PM<br />
250 Frank H. Ogawa Plaza, Suite 3341<br />
Contract Administration Front Desk<br />
Engineer’s Estimate<br />
Number <strong>of</strong> Bids Received 4<br />
Bidders and Bid Amounts<br />
Apparent Low Bid<br />
Awarded To<br />
Plan Holders<br />
Fugro West, Inc., Dowling Associates, Inc., Byrens Kim Design<br />
Works<br />
12/31/10
RFP-to Perform a Performance Audit <strong>of</strong> the Fox Theater<br />
License Required N/A<br />
Project Number<br />
N/A<br />
Fees No Fee Mailed $19.05<br />
Pre-Proposal Meeting Thursday, June 17, 2010 @ 10:00am<br />
<strong>City</strong> Hall, Hearing Room 1<br />
One Frank Ogawa Plaza<br />
Submittals Due<br />
Friday, July 9,2010@2PM<br />
250 Frank Ogawa Plaza, Suite 3341<br />
Contract Administration Front Desk<br />
Engineer’s Estimate<br />
Number <strong>of</strong> Bids Received<br />
Bidders and Bid Amounts<br />
Apparent Low Bid<br />
Awarded To<br />
Plan Holders<br />
URS, Beyond Compliance, Peter Cooke/Associates, MARSH, Yano<br />
Accountancy Corp., Macias Gini Oconnell, Muller & Caufield<br />
Architects,<br />
12/31/10
RFP-for Security Guard Services THIS PROJECT HAS 1 ADDENDUM<br />
License Required N/A<br />
Project Number<br />
N/A<br />
Fees No Fee Mailed $9.05<br />
Pre-Proposal Meeting Wednesday, June 16, 2010 @ 10:00am<br />
250 Frank H. Ogawa Plaza, Suite 4304<br />
Broadway Conference Room<br />
Submittals Due<br />
Engineer’s Estimate<br />
Number <strong>of</strong> Bids Received<br />
Bidders and Bid Amounts<br />
Apparent Low Bid<br />
Awarded To<br />
Plan Holders<br />
Wednesday June 30, 2010@2PM<br />
250 Frank Ogawa Plaza, Suite 3341<br />
Contract Administration Front Desk<br />
Every Second Count, St. Moritz, U.S. Security Assoc., Inc., Cypress<br />
Security, G45 Secure Solutions USA, ABC Security Service,<br />
ARCLIGHT Systems Security, Inc., A&K Security, Inc.,<br />
Alliedbarton , Security Code 3, VAL Security, Inc., Securetrans ,<br />
Fisher Executive Protection & Training, WSB, Marina Securities<br />
12/31/10
RFP-for Education and Outreach for Implementation <strong>of</strong> Instant Run-<strong>of</strong>f, Also known as,<br />
ranked-Choice Voting, in the <strong>City</strong> <strong>of</strong> <strong>Oakland</strong>’s November 2010 Election<br />
THIS PROJECT HAS 2 ADDENDUMS<br />
License Required N/A<br />
Project Number<br />
N/A<br />
Fees Fee: $10.00 Mailed $9.05<br />
Pre-Proposal Meeting<br />
Thursday, June 2, 2010 @ 10:00am<br />
One Frank H. Ogawa Plaza,<br />
Hearing Room 2<br />
Submittals Due<br />
Engineer’s Estimate<br />
Number <strong>of</strong> Bids Received<br />
Bidders and Bid Amounts<br />
Apparent Low Bid<br />
Awarded To<br />
Plan Holders<br />
Friday June 18, 2010 @2PM<br />
250 Frank Ogawa Plaza, Suite 3341<br />
Contract Administration Front Desk<br />
Central Legal De La Raza<br />
12/31/10
RFP-for As- Needed Economic Consultants Services<br />
License Required N/A<br />
Project Number<br />
N/A<br />
Fees $10.00 Mailed $9.05<br />
Pre-Proposal Meeting Friday, May 7, 2010 @ 10:30am<br />
One Frank H. Ogawa Plaza,<br />
Hearing Room 4<br />
Submittals Due<br />
Engineer’s Estimate<br />
Number <strong>of</strong> Bids Received<br />
Bidders and Bid Amounts<br />
Apparent Low Bid<br />
Awarded To<br />
Plan Holders<br />
Friday May 21, 2010@2PM<br />
250 Frank Ogawa Plaza, Suite 3341<br />
Contract Administration Front Desk<br />
ATTEVO INC, ELEVATA INCORPORATED, FUGRO WEST INC, GJT<br />
LIMITED, GOLDEN ASSOCIATES, HKIT Architects, Harris & Associates, JM<br />
MOORE, JUNGLE COMMUNICATIONS INC, KILOWATT ENGINEERING<br />
INC DBA KW Engineering Inc., KLEINFELEDER WEST INC, LILIEN, LLC,<br />
OLIVE CONSTRUCTION MANAGEMENT, R3 CONSULTING GROUP INC,<br />
REGINA M BLUS, TRANSYSTEMS CORPORATION, U.S. BANK<br />
NATIONAL ASSOCIATION, VARGAS GREENAN ARCHITECTURE-CIVIC<br />
DESIGN, WILLDAN GROUP INC, WILLIAMS ADLEY & COMPANY LLP,<br />
HAUSRATH ECONOMICS GROUP, VERNAZZA WOLFE ASSOCIATES<br />
INC, KEYSER MARSTON ASSOCIATES, PUBLIC FINANCIAL<br />
MANAGEMENT INC., UDA STUDIO, DAVID PAUL ROSEN &<br />
ASSOCIATES, ECONOMIC AND PLANNING SYSTEMS, STRATEGIC<br />
ECONOMIC, PACIFIC MUNICIPAL CONSULTANTSJACK FAUCETT<br />
ASSOCIATES INC, GRUEN GRUEN & ASSOCIATES, PURPLE LYNX,<br />
BEDROCK MEDIA, APPLIED DEVELOPMENT ECONOMICS, SASAKI<br />
ASSOCIATES INC, URBAN TRANSFORMATION, JSA Consulting Services,<br />
BAY AREA ECONOMICS (B.A.E.), CSG ADVISORS, INC., WAHLSTROM &<br />
ASSOCIATES, DENISE E. CONLEY, Brion & Associates, METROVATION<br />
BROKERAGE INC, MANEX, CGR MANAGEMENT CONSULTANTS,<br />
URBAN ANALYTICS LLC, OLIVA GLOBAL COMMUNICATIONS, SEIFEL<br />
CONSULTING, INC., BBP & Associates, LLC<br />
12/31/10
RFP-for Civic Center HVAC and Air Flow Improvements-<br />
STIMULUS PROJECT ONLINE ONLY- THIS PROJECT HAS 1 ADDENDUM<br />
License Required N/A<br />
Project Number<br />
C389010<br />
Fees<br />
N/A<br />
Pre-Proposal Meeting Thursday, April 29, 2010 @ 11:00am<br />
250 Frank H. Ogawa Plaza, Suite 4304<br />
Submittals Due<br />
Friday May 14, 2010@2PM<br />
250 Frank Ogawa Plaza, Suite 3341<br />
Contract Administration Front Desk<br />
Engineer’s Estimate<br />
Number <strong>of</strong> Bids Received 2<br />
Bidders and Bid Amounts<br />
Apparent Low Bid<br />
Awarded To<br />
Plan Holders Broadway Mechanical, IC Engineering, Salas O’Brien, McGraw –<br />
Hill Construction Dodge, Sacramento Regional Builders Exchange,<br />
Airway Air Conditioning & Heating, Inc. IC Engineering<br />
Comments: Requests for Proposals are available for download free <strong>of</strong> cost: send an<br />
email to EnergyGroup@oaklandnet.com with “Civic Center HVAC and Air Flow<br />
Improvements” as the subject and a reply email with further instructions will be<br />
sent.<br />
12/31/10
RFP-for Municipal Lighting Energy Efficiency Retr<strong>of</strong>its Phase 8- STIMULUS PROJECT<br />
ONLINE ONLY-THIS PROJECT HAS 3 ADDENDUMS<br />
License Required N/A<br />
Project Number<br />
C388710,C389110,C389210<br />
Fees<br />
N/A<br />
Pre-Proposal Meeting MANDATORY-Friday, April 23, 2010 @ 3:00pm<br />
One Frank H. Ogawa Plaza,<br />
Hearing Room 3<br />
Submittals Due<br />
Friday May 12, 2010@2PM<br />
250 Frank Ogawa Plaza, Suite 3341<br />
Contract Administration Front Desk<br />
Engineer’s Estimate<br />
Number <strong>of</strong> Bids Received 2<br />
Bidders and Bid Amounts<br />
Apparent Low Bid<br />
Awarded To<br />
Plan Holders<br />
Controlled Energy, DKS Associates, Ultra Systems Enviornmental,<br />
Sun Industries, Sustainable Technologies, Kitchell, Sacramento<br />
Regional Builders Exchange, Salas O’Brien, Airway Air<br />
Conditioning & Heating, Inc., IC Engineering<br />
Comments: Requests for Proposals are available for download free <strong>of</strong> cost: send an<br />
email to EnergyGroup@oaklandnet.com with “Municipal Lighting Phase 8” as the<br />
subject and a reply email with further instructions will be sent.<br />
12/31/10
RFP-for The Streetscape Design for Martin Luther King Jr. Way & Peralta Street in the<br />
West <strong>Oakland</strong> Redevelopment Project Area<br />
License Required N/A<br />
Project Number<br />
N/A<br />
Fees $10.00 Mailed $19.05<br />
Pre-Proposal Meeting Wednesday, April 7, 2010 @ 10:00am<br />
250 Frank H. Ogawa Plaza, Suite 4304<br />
Skyline Conference Room<br />
Submittals Due<br />
Engineer’s Estimate<br />
Number <strong>of</strong> Bids Received<br />
Bidders and Bid Amounts<br />
Apparent Low Bid<br />
Awarded To<br />
Plan Holders<br />
Friday April 30, 2010@2PM<br />
250 Frank Ogawa Plaza, Suite 3341<br />
Contract Administration Front Desk<br />
BKF Engineers Surveyors & Planners, Bionic, Jetaanc, Bruce Jett &<br />
Associates, Inc., Harris & Associates, Golden Associates, WRT,<br />
Glates, Bottomley Design & Planning, RBF Consulting,<br />
Community Design & Architechture, Sasaki Associates, Moore<br />
Zacufano , Goutsman, Inc.<br />
12/31/10
RFQ-Request for Qualifications for Civic Center HVAC and Air Flow Improvements<br />
License Required N/A<br />
Project Number<br />
C389010<br />
Fees<br />
$:Free<br />
Pre-Proposal Meeting -2 MANDATORY<br />
Wednesday ,March 24, 2010 @11:00am and<br />
Thursday, March 25, 2010 @ 11:00am<br />
250 Frank H. Ogawa Plaza, Suite 4304<br />
Broadway Conference Room<br />
Submittals Due<br />
Thursday , April 8, 2010 @ 2:00pm<br />
250 Frank Ogawa Plaza, Suite 3341<br />
Contract Administration Front Desk<br />
Engineer’s Estimate<br />
Number <strong>of</strong> Bids Received 0<br />
Bidders and Bid Amounts<br />
Apparent Low Bid<br />
Awarded To<br />
Plan Holders<br />
Comments: Requests for Qualifications are available for download free <strong>of</strong> cost: send<br />
an email to EnergyGroup@oaklandnet.com with “Civic Center HVAC and Air Flow<br />
Improvements” as the subject and a reply email with further instructions will be<br />
sent.<br />
12/31/10
RFP-Security Guard Services<br />
License Required N/A<br />
Project Number<br />
C389310<br />
Fees $32.00 If Mailed $36.05<br />
Pre-Proposal Meeting 2 Monday ,March 22, 2010 @10:00am<br />
250 Frank H. Ogawa Plaza, Suite 4304<br />
Broadway Conference Room<br />
Submittals Due<br />
Engineer’s Estimate<br />
Number <strong>of</strong> Bids Received<br />
Bidders and Bid Amounts<br />
Apparent Low Bid<br />
Awarded To<br />
Plan Holders<br />
Friday , April 2, 2010 @ 2:00pm<br />
250 Frank Ogawa Plaza, Suite 3341<br />
Contract Administration Front Desk<br />
ANI Private Security, Cypress Security, Pr<strong>of</strong>essional Security<br />
Consultants, Star Protection Agency, ABC Security Service, A&K<br />
Security Services, WSB & Associates, McCoys Patrol Service, A-1<br />
Protective Services, WSB & Associates, Inc., Integral Protection,<br />
Highcom Security Services<br />
12/31/10
RFQ-Request for Qualifications for Hall <strong>of</strong> Justice HVAC Improvements<br />
License Required N/A<br />
Project Number<br />
C389310<br />
Fees $24.00 If Mailed $34.00<br />
Pre-Proposal Meeting 2 Monday ,March 1, 2010 @3:00pm<br />
250 Frank H. Ogawa Plaza, Suite 4304<br />
Wednesday March 3, 2010 @ 3:00pm<br />
One Frank Ogawa Plaza, Hearing Room 3<br />
Submittals Due<br />
Friday , March 19, 2010 @ 2:00pm<br />
250 Frank Ogawa Plaza, Suite 3341<br />
Contract Administration Front Desk<br />
Engineer’s Estimate<br />
Number <strong>of</strong> Bids Received 2<br />
Bidders and Bid Amounts<br />
Apparent Low Bid<br />
Awarded To<br />
Plan Holders<br />
12/31/10
RFP for ReCreate Art Contest and Exhibition- THIS RFP IS ONLINE<br />
License Required N/A<br />
Project Number<br />
N/A<br />
Fees $20.00 If Mailed $24.05<br />
Pre-Proposal Meeting Wednesday, February 24, 2010 at 3PM<br />
Skyline Conference Room 3 rd Floor<br />
250 Frank Ogawa Plaza<br />
Submittals Due<br />
Wednesday, March 12, 2010 @ 2:00pm<br />
250 Frank Ogawa Plaza, Suite 3341<br />
Contract Administration Front Desk<br />
Engineer’s Estimate $30,000.00($15,000.00 annual aggregate)<br />
Number <strong>of</strong> Bids Received 1<br />
Bidders and Bid Amounts<br />
Apparent Low Bid<br />
Awarded To<br />
Plan Holders<br />
Comments: Electronic (pdf) RFP’s may be downloaded by sending an email to:<br />
ZeroWaste@oaklandnet.com with “ReCreate ” as the subject and a reply email with<br />
further instructions will be sent.<br />
12/31/10
RFP- On-Call Appraisal Services<br />
License Required N/A<br />
Project Number<br />
N/A<br />
Fees $20.00 If Mailed $24.05<br />
Pre-Proposal Meeting Wednesday, February 17, 2010 at 2PM<br />
Broadway Conference Room 4 th Floor<br />
250 Frank Ogawa Plaza<br />
Submittals Due<br />
Wednesday, March 3, 2010 @ 2:00pm<br />
250 Frank Ogawa Plaza, Suite 3341<br />
Contract Administration Front Desk<br />
Engineer’s Estimate<br />
Number <strong>of</strong> Bids Received 12<br />
Bidders and Bid Amounts<br />
Apparent Low Bid<br />
Awarded To<br />
Plan Holders<br />
Up to $600,000 over 2yr period<br />
Yovino & Young, Inc., Alfred L. Watts & Associates,<br />
Burchard/Rinehat, J.W. Tomard Associates, Donna Desmond, Sanli<br />
Pastore & Hill<br />
12/31/10
<strong>Oakland</strong> Municipal Identification/Stored Value Card<br />
License Required N/A<br />
Project Number N/A<br />
Fees $10.00 If Mailed $19.05<br />
Pre-Submittal Monday, February 8, 2010 at 10:00am<br />
Meeting<br />
Hearing Room 2 , <strong>City</strong> Hall<br />
One Frank Ogawa Plaza<br />
Submittals Due Wednesday, March 17, 2010 @ 2:00pm<br />
250 Frank Ogawa Plaza, Suite 3341<br />
Contract Administration Front Desk<br />
Engineer’s Estimate<br />
Number <strong>of</strong> Bids<br />
Received<br />
Bidders and Bid<br />
Amounts<br />
Apparent Low Bid<br />
Awarded To<br />
Plan Holders<br />
HID Global<br />
Capture Technologies<br />
DatacardGroup<br />
SafeCardID.Com<br />
Rock West Technology Group<br />
Photo ID Systems & Supplies<br />
VTFS, Inc<br />
Image Sales, Inc<br />
SF Gloval Group<br />
California Bank and Trust<br />
California Government Banking Bank <strong>of</strong> America<br />
US Bank<br />
Far East National Bank<br />
Metropolitan Bank<br />
Community Bank <strong>of</strong> the Bay<br />
Bank <strong>of</strong> the West<br />
HSBC Bank USA, NA<br />
Citibank<br />
Washingron Mutual<br />
Cathay Bank<br />
Union Bank <strong>of</strong> California<br />
Wells Fargo-MAC 0193-120<br />
Alta Alliance Bank<br />
Comerica Bank<br />
United Commerical Bank<br />
Intercede<br />
12/31/10
U.S. Bank National Association Governments and Non-Pr<strong>of</strong>its Banking<br />
Hoobe Identification Solutions, Inc.<br />
ALINC Consulting, Inc<br />
Comments: Electronic (pdf) RFQs may be downloaded for free by sending an email to:<br />
dcpca@oaklandnet.com with “RFQ for <strong>Oakland</strong> ID Card” as the subject and a reply<br />
email with further instructions will be sent.<br />
12/31/10
RFP for the Parking Access and Revenue Control System (PARCS) THIS PROJECT HAS<br />
ONE ADDENDUM<br />
License Required N/A<br />
Project Number<br />
N/A<br />
Fees FREE If Mailed $9.05<br />
Pre-Submittal Meeting Wednesday, January 06, 2009 at 10:30am<br />
Personnel Conference Room, 3 rd Floor1<br />
150 Frank Ogawa Plaza<br />
Submittals Due<br />
Thursday, February 11, 2010 @ 2:00pm<br />
250 Frank Ogawa Plaza, Suite 3341<br />
Contract Administration Front Desk<br />
Engineer’s Estimate<br />
Number <strong>of</strong> Bids Received<br />
Bidders and Bid Amounts<br />
Apparent Low Bid<br />
Awarded To<br />
Plan Holders<br />
N/A<br />
DataPark, InterTechnomics, (CMTI, MVP, Clancy Systems), Paylock, Bay<br />
Cities Automatic Gates, T2 Systems, Scheint & Bazhman, S&B, ACS,<br />
AEKO, Federal APD, GMG Systems, Inc., WM.D.White Co., Inc., SECOM<br />
Int.<br />
12/31/10
RFP for General Liability Third Party (TPA) Services<br />
License Required N/A<br />
Project Number<br />
N/A<br />
Fees FREE If Mailed $9.05<br />
Pre-Submittal Meeting Wednesday , December 09, 2009 at 10:00am<br />
Skyline Conference Room, Suite 3341<br />
250 Frank Ogawa Plaza<br />
Submittals Due<br />
Wednesday, January 22, 2010 @ 2:00pm<br />
250 Frank Ogawa Plaza, Suite 3341<br />
Contract Administration Front Desk<br />
Engineer’s Estimate<br />
Number <strong>of</strong> Bids Received<br />
Bidders and Bid Amounts<br />
Apparent Low Bid<br />
Awarded To<br />
Plan Holders<br />
N/A<br />
George Hills Co., Carl Warren Company, Cannon Cochran<br />
Management Services, Inc., Keenan & Associates, John Glenn<br />
Adjusters, AIMS, York Ins. Services JT2, Builder Unlimited<br />
12/31/10
RFP for 2010-2011 Team <strong>Oakland</strong><br />
License Required N/A<br />
Project Number<br />
P35510<br />
Fees Pick-up $20.00 If Mailed $29.05<br />
Pre-Submittal Meeting Tuesday , December 01, 2009 at 9:30am<br />
<strong>City</strong> Hall Hearing Room 3<br />
One Frank Ogawa Plaza<br />
Submittals Due<br />
Wednesday, January 6, 2010 @ 2:00pm<br />
250 Frank Ogawa Plaza, Suite 3341<br />
Contract Administration Front Desk<br />
Engineer’s Estimate $249,000.00<br />
Number <strong>of</strong> Bids Received<br />
Bidders and Bid Amounts<br />
Apparent Low Bid<br />
Awarded To<br />
Plan Holders<br />
YEP, Peralta Svcs., Corp, <strong>Oakland</strong> Venue Management, Latino<br />
Commission, Spanish Speaking Citizens’ Foundation, The Unity<br />
Council<br />
12/31/10
Request for Design / Build Proposals Hall <strong>of</strong> Justice HVAC Improvements (STIMULUS<br />
PROJECT)<br />
License Required B<br />
Project Number<br />
C389310<br />
Fees Pick-up $30.00 If Mailed $39.05<br />
Pre-Submittal Meeting Tuesday , December 01, 2009 at 3:00pm<br />
<strong>City</strong> Hall Hearing Room 3<br />
One Frank Ogawa Plaza<br />
Submittals Due<br />
Friday, December 18, 2009 @ 2:00pm<br />
250 Frank Ogawa Plaza, Suite 3341<br />
Contract Administration Front Desk<br />
Engineer’s Estimate $552,059.00<br />
Number <strong>of</strong> Bids Received<br />
Bidders and Bid Amounts<br />
Apparent Low Bid<br />
Awarded To<br />
Plan Holders<br />
Legacy Mechanical, Carrier Corporation, EMCOR Mesa, America<br />
Air, Acco, Monterey Mechanical Co., Roberts Electric<br />
12/31/10
RFP for Green Business Program Technical Assistance<br />
License Required Recycling and Solid Waste Consultants<br />
Project Number<br />
H63640<br />
Fees Pick-up $20.00 If Mailed $29.05<br />
Pre-Submittal Meeting Thursday, November 05, 2009 at 9:30am<br />
<strong>City</strong> Hall Hearing Room 1<br />
One Frank Ogawa Plaza<br />
Submittals Due<br />
Monday, November 30, 2009 @ 2:00pm<br />
250 Frank Ogawa Plaza, Suite 3341<br />
Contract Administration Front Desk<br />
Engineer’s Estimate<br />
Number <strong>of</strong> Bids Received<br />
Bidders and Bid Amounts<br />
Apparent Low Bid<br />
Awarded To<br />
Plan Holders<br />
Kies Strategies, Sustainable Concepts Studio, URS Corporation,<br />
Environmental Science Associates, EnviroSystems Group, C2<br />
Alternative Services, R3 Consulting Group, Environmental Planning<br />
Consultants,<br />
12/31/10
RFP Creation <strong>of</strong> Development Impact Fees<br />
*Note: If you would like a copy <strong>of</strong> the RFP emailed to you, please email your request<br />
to: Istarr@oaklandnet.com<br />
License Required N/A<br />
Project Number<br />
N/A<br />
Fees<br />
Pre-Proposal Meeting<br />
Proposals Due<br />
Engineer’s Estimate<br />
Number <strong>of</strong> Proposals<br />
Received<br />
Planholders list:<br />
Free or $9.05 if mailed<br />
Thursday, October 29, 2009 at 2:00 p.m.<br />
Broadway Conference Room , Suite 4304<br />
250 Frank Ogawa Plaza<br />
Friday, November 20, 2009 at 2:00 p.m.<br />
250 Frank H. Ogawa Plaza, Suite 3341<br />
Contract Administration Front Desk<br />
Seifel Consulting ,PBS&J, Fehr & Peers. Urban Economics,<br />
Wilbur Smith Associates, Dowling Associates,<br />
Environmental Science Associates, Duncan Associates,<br />
Revenue Cost, Kimley-Horn, Willdan Financial, CHS<br />
Consulting, Circle Point, PMC. Economic & Planning<br />
Systems, Inc., Transportation Analytics, AECOM, Conley<br />
Group, Brion & Associates, Hausrath Economics Group,<br />
DKS Associates, Bay Area Economics, Cox Castle<br />
Nicholson<br />
12/31/10
RFQ- 2009-2012 – As Needed Engineering Services<br />
License Required Civil, Structural, Geotechnical Engineering Services<br />
Project Number<br />
N/A<br />
Fees<br />
Free $10.00 or $15.00 if mailed<br />
Pre-Proposal Meeting Wednesday, September 30, 2009 at 2:00 p.m.<br />
1 Frank H. Ogawa Plaza,<br />
Hearing Room 1<br />
Proposals Due<br />
Friday, October 9, 2009 at 2:00 p.m.<br />
250 Frank H. Ogawa Plaza, Suite 3341<br />
Contract Administration Front Desk<br />
Engineer’s Estimate<br />
Number <strong>of</strong> Proposals 38<br />
Received<br />
Planholders list:<br />
MGE Engineering, Inc., Rajappan & Meyer, Fugro West,<br />
Inc., Questa, Cal Engineering & Geology, Biggs Cardosa<br />
Assoc., Kimley- Horn Assoc., Treadwell, Rollo, Inc.,<br />
M<strong>of</strong>fatt & Nichol, Applied Materials & Engineering,<br />
OLMM Consulting Engineers, URS, Carollo Engineers.<br />
Restoration Design Group(RDG),BKF Engineers,<br />
Cornerstone Earth Group, TRC, Urban Design Consulting<br />
Engineers, ENGEO Inc., Earthquake & Structures, Inc.,<br />
Kleinfelder, Degenkolb Engineers, SMW & Associates,<br />
MACTEC, Jacob Associates, Avila Project Mgmt., HTK<br />
Structural Engineers, Humann Co., Geosphere Consultants,<br />
Creegan & D’Angelo, Chow Engineering, AGS, Inc., TRS<br />
Consultants, Inc., WRECO, Mark Thomas & Co., Wood<br />
Rodgers, AT Merovich & Associates Structural Engineers,<br />
RES Engineers, Lai & Associates, Summit Eng., Jacobs,<br />
Ninyo & Moore, S.Kwok Engineers, Inc., DC&E, AMC<br />
Consulting Eng., Inc., Interactive Reasurers, Fratessa Forbes<br />
Wong, Miller Pacific Engineering Group, Aliquot Assoc.,<br />
Inc., Ireland Engineering, Ware Malcomb, AE3 Partners<br />
Engineering, Beyaz & Patel, Inc., RBF Consulting, Sandis,<br />
DKS Associates, The KPA Group, KC Pierce & Assoc.,<br />
Fehr & Peers<br />
12/31/10
RFP-Chemical Dependency Treatment Programs Provider List REVISED<br />
License Required N/A<br />
Project Number<br />
N/A<br />
Fees<br />
Free or $9.05 if mailed<br />
Pre-Proposal Meeting Wednesday, October 14, 2009 at 11:00 a.m.<br />
1 Frank H. Ogawa Plaza,<br />
Hearing Room 1<br />
Proposals Due<br />
Friday, November 13, 2009 at 2:00 p.m.<br />
250 Frank H. Ogawa Plaza, Suite 3341<br />
Contract Administration Front Desk<br />
Engineer’s Estimate<br />
Number <strong>of</strong> Proposals<br />
Received<br />
Planholders list:<br />
The Camp Recovery Center, Recovery Management<br />
Svc.Inc., Azure Acres Recovery, New Bridge Foundation<br />
12/31/10
SOQ – As Needed Landscape Architectural Services<br />
License Required Landscape Architects<br />
Project Number<br />
N/A<br />
Fees<br />
Free 10.00 or $15.00 if mailed<br />
Pre-Proposal Meeting Thursday, September 17, 2009 at 10:00 a.m.<br />
1 Frank H. Ogawa Plaza,<br />
Hearing Room 1<br />
Proposals Due<br />
Thursday, October 8, 2009 at 2:00 p.m.<br />
250 Frank H. Ogawa Plaza, Suite 3341<br />
Contract Administration Front Desk<br />
Engineer’s Estimate Approximately $150,000.00 per consultant<br />
Approximately $500,000.00 per consultant<br />
Number <strong>of</strong> Proposals 18<br />
Received<br />
Planholders list:<br />
Peter Wolfe Landscape Architecture, Stevens Associates,<br />
Bottomley Design & Planning, Wallace Roberts & Todd,<br />
Bruce Jett Associates, Sasaki Associates, Golden Associates<br />
Landscape Architects, Inside Out Designs, PGA Design,<br />
Dillingham Associates, Keller Mitchell, Merrill Morris,<br />
Adrienne Wong Assoc., CMG Landscape Architectural,<br />
Questa Engineering, Cliff Lowe Associates, Stantec,<br />
Restoration Design Group, Design, Community &<br />
Environment, Harris Design, UDS<br />
12/31/10
RFP –Citation Administration and Revenue Reconciliation Systems(CARRS)THIS<br />
PROJECT HAS 2ADDENDUM<br />
License Required Qualified Medical Service Provider Consultants<br />
Project Number<br />
N/A<br />
Fees<br />
Free or $9.05 if mailed<br />
Pre-Proposal Meeting Mandatory Thursday, August 13, 2009 at 10:30 a.m.<br />
150 Frank H. Ogawa Plaza,<br />
Finance Conference Room<br />
Proposals Due<br />
Friday, September 25, 2009 at 2:00 p.m.<br />
250 Frank H. Ogawa Plaza, Suite 3341<br />
Contract Administration Front Desk<br />
Engineer’s Estimate N/A<br />
Number <strong>of</strong> Proposals<br />
Received<br />
Planholders list:<br />
ACS, JCMS, <strong>City</strong> <strong>of</strong> Inglewood ITC Department, Duncan<br />
Solutions, Inc., Streetline, Inc., Paylock IPT LLC, Street<br />
Smart Technology, Duncan Solutions,<br />
12/31/10
RFP for <strong>Oakland</strong> Fire Department Annual Physical Examinations<br />
License Required Qualified Medical Service Provider Consultants<br />
Project Number<br />
N/A<br />
Fees<br />
Free or $9.05 if mailed<br />
Pre-Proposal Meeting Wednesday, August 21, 2009 at 11:30 a.m.<br />
250 Frank H. Ogawa Plaza, Suite 3341<br />
Skyline Conference Room<br />
Proposals Due<br />
Friday, August 21, 2009 at 2:00 p.m.<br />
250 Frank H. Ogawa Plaza, Suite 3341<br />
Contract Administration Front Desk<br />
Engineer’s Estimate N/A<br />
Number <strong>of</strong> Proposals<br />
Received<br />
Planholders list:<br />
Concentra<br />
12/31/10
RFP for <strong>Oakland</strong> Fire Department Personality Trait Assessments<br />
License Required Medical Service Provider Consultants<br />
Project Number<br />
N/A<br />
Fees<br />
Free or $9.05 if mailed<br />
Pre-Proposal Meeting Wednesday, August 5, 2009 at 11:30 a.m.<br />
250 Frank H. Ogawa Plaza, Suite 3341<br />
Skyline Conference Room<br />
Proposals Due<br />
Friday, August 28, 2009 at 2:00 p.m.<br />
250 Frank H. Ogawa Plaza, Suite 3341<br />
Contract Administration Front Desk<br />
Engineer’s Estimate N/A<br />
Number <strong>of</strong> Proposals<br />
Received<br />
Planholders list:<br />
12/31/10
RFP for <strong>Oakland</strong> Fire Department Pre-Employment Background Investigations<br />
License Required Qualified Investigations Consultant<br />
Project Number<br />
N/A<br />
Fees<br />
Free or $9.05 if mailed<br />
Pre-Proposal Meeting Wednesday, August 5, 2009 at 11:30 a.m.<br />
250 Frank H. Ogawa Plaza, Suite 3341<br />
Skyline Conference Room<br />
Proposals Due<br />
Friday, August 28, 2009 at 2:00 p.m.<br />
250 Frank H. Ogawa Plaza, Suite 3341<br />
Contract Administration Front Desk<br />
Engineer’s Estimate N/A<br />
Number <strong>of</strong> Proposals<br />
Received<br />
Planholders list:<br />
Castle Branch, All Clear Screening Services, Inc.,<br />
12/31/10
RFP for <strong>Oakland</strong> Fire Department Employee Assistance Program<br />
License Required Qualified Medical Service Provider Consultants<br />
Project Number<br />
N/A<br />
Fees<br />
Free or $9.05 if mailed<br />
Pre-Proposal Meeting Wednesday, August 5, 2009 at 11:30 a.m.<br />
250 Frank H. Ogawa Plaza, Suite 3341<br />
Skyline Conference Room<br />
Proposals Due<br />
Friday, August 21, 2009 at 2:00 p.m.<br />
250 Frank H. Ogawa Plaza, Suite 3341<br />
Contract Administration Front Desk<br />
Engineer’s Estimate N/A<br />
Number <strong>of</strong> Proposals<br />
Received<br />
Planholders list:<br />
Claremont EAP, Psych Solutions, Inc.<br />
12/31/10
RFP for the Administration <strong>of</strong> the <strong>Oakland</strong> Police Department False Alarm<br />
Reduction Unit THIS PROJECT HAS 1 ADDENDUM<br />
License Required<br />
Project Number<br />
N/A<br />
Fees<br />
Pre-Proposal Meeting<br />
Free or $9.05 if mailed<br />
Wednesday, July 29, 2009 at 10:30 a.m.<br />
250 Frank H. Ogawa Plaza, Suite 3341<br />
Skyline Conference Room<br />
Proposals Due<br />
Thursday, August 17, 2009 at 2:00 p.m.<br />
250 Frank H. Ogawa Plaza, Suite 3341<br />
Contract Administration Front Desk<br />
Engineer’s Estimate $246,750.00<br />
Number <strong>of</strong> Proposals<br />
Received<br />
Planholders list:<br />
Janitorial Pr<strong>of</strong>essionals, Enable Point, Inc., Kidd<br />
International, ATB Services,<br />
12/31/10
RFP for Audit Services for Sales, Use and Property Taxes<br />
License Required<br />
Project Number<br />
H63640<br />
Fees<br />
$30.00 or $39.05 if mailed<br />
Pre-Proposal Meeting Wednesday, July 1, 2009 at 10:00 a.m.<br />
250 Frank H. Ogawa Plaza, Suite 4304<br />
Broadway Conference Room<br />
Proposals Due<br />
Thursday, July 16, 2009 at 2:00 p.m.<br />
250 Frank H. Ogawa Plaza, Suite 3341<br />
Contract Administration Front Desk<br />
Engineer’s Estimate $300,000.00<br />
Number <strong>of</strong> Proposals 2<br />
Received<br />
Planholders list:<br />
MuniServices, LLC, HDL Companies<br />
12/31/10
RFP for Zero Waste System Design Modeling/Testing and Procurement Technical<br />
Assistance<br />
License Required<br />
Project Number<br />
H63640<br />
Fees<br />
Pre-Proposal Meeting<br />
$Free or $9.05 if mailed<br />
Thursday, April 30, 2009 at 10:00 a.m.<br />
One Frank H. Ogawa Plaza,<br />
Hearing Room 1<br />
Proposals Due<br />
Wednesday, May 13, 2009 at 2:00 p.m.<br />
250 Frank H. Ogawa Plaza, Suite 3341<br />
Contract Administration Front Desk<br />
Engineer’s Estimate Not to Exceed $300,000.00<br />
Number <strong>of</strong> Proposals<br />
Received<br />
Planholders list:<br />
RB Consulting Group, Inc., WIH Resource Group, Cascada<br />
Consulting Group, SERA, Inc., HF&H Consultants, Inc.,<br />
R&M Environmental, Herrera Environmental Consultants,<br />
Economics, Inc., RJ Proto Consulting, Integrated Waste<br />
Mgmt., Alternate Resources, Sound Resource Mgmt Grp.,<br />
Circle Point, Waste Sleuth, Environmental Innovations<br />
Corp., Cal Recovery, Inc., Synergis, Gershman, Brickner &<br />
Brohon, Inc., HDR Engineering, Environmental Planning<br />
Consultants, URS Corp., Sustainable Concepts Studio, Gary<br />
Liss & Assoc., ESA, AECOM, Pacific Waste Consulting<br />
Grp., MSE Grp., Brian Strrat & Assoc.,<br />
12/31/10
2009-2012 As-Needed Transportation Planning Services<br />
License Required Employment Services/ Recreation<br />
Project Number<br />
N/A<br />
Fees<br />
$10.00 or $15.00 if mailed<br />
Pre-Proposal Meeting Thursday, March 19, 2009 at 2:00 p.m.<br />
250 Frank H. Ogawa Plaza,<br />
Broadway Conference Room 4 th Floor<br />
Proposals Due<br />
Thursday, April 2, 2009 at 2:00 p.m.<br />
250 Frank H. Ogawa Plaza, Suite 3341<br />
Contract Administration Front Desk<br />
Engineer’s Estimate $500,000 (Type A SOQ)<br />
$150,000 (Type B SOQ)<br />
Number <strong>of</strong> Proposals<br />
Received<br />
Planholders list:<br />
KOA Corporation, DKS Associates, JRDV Architects,<br />
Reconnection America, Arthulia, EMC Research, Inc.,<br />
Hausrath Economics Group, CHS Consulting Group,<br />
Community Design & Architecture, Bottomley Design &<br />
Planning, HNTB, Alta Planning & Design, Watry Design,<br />
AECOM, EnviroTrans Solutions, MIG, Inc., Eisen/Letunic,<br />
Nelson/Nygaard, M<strong>of</strong>fatt & Nichol, Dowling Associates,<br />
Ecorp Consulting, Inc., DC&E, Strategic Economics, AE3<br />
Partners, Fehr & Peers, Circle Point, Wilbur Smith<br />
Associates, Kimley Horn Associates, Woodrodgers, Questa<br />
Engineering, IPA Planning Solutions<br />
12/31/10
RFP Keep <strong>Oakland</strong> Clean and Beautiful Division<br />
Team <strong>Oakland</strong> Program 2009-2010<br />
PROJECT CANCELLED<br />
License Required Employment Services/ Recreation<br />
Project Number<br />
N/A<br />
Fees<br />
Pre-Proposal Meeting<br />
Free or $9.05 if mailed<br />
Friday, February 6, 2009 at 1:00 p.m.<br />
250 Frank H. Ogawa Plaza, Suite 3341<br />
Contract Administration<br />
Skyline Conference Room 3 rd Floor<br />
Proposals Due<br />
Friday, February 20, 2009 at 2:00 p.m.<br />
250 Frank H. Ogawa Plaza, Suite 3341<br />
Contract Administration Front Desk<br />
Engineer’s Estimate $249, 000.00<br />
Number <strong>of</strong> Proposals<br />
Received<br />
Planholders list:<br />
KC Pierce & Associates, C&C Const. Delu<br />
12/31/10
RFP Camera Surveillance Project<br />
License Required N/A<br />
Project Number<br />
N/A<br />
Fees<br />
$10.00 or $15.00 if mailed<br />
Pre-Proposal Meeting Thursday, October 23, 2008 at 10:00 a.m.<br />
4 th Floor Broadway Conference Room<br />
Proposals Due<br />
Friday, October 31, 2008 at 2:00 p.m.<br />
250 Frank H. Ogawa Plaza, Suite 3341<br />
Contract Administration Front Desk<br />
Engineer’s Estimate<br />
Number <strong>of</strong> Proposals 5<br />
Received<br />
Planholders list:<br />
12/31/10
RFP to Provide Engineering Services for Assessment Districts<br />
License Required Engineering Services<br />
Project Number<br />
N/A<br />
Fees<br />
$10.00 or $15.00 if mailed<br />
Pre-Proposal Meeting Thursday, October 23, 2008 at 10:00 a.m.<br />
6 th Floor Large Conference Room<br />
Proposals Due<br />
Friday, October 31, 2008 at 2:00 p.m.<br />
250 Frank H. Ogawa Plaza, Suite 3341<br />
Contract Administration Front Desk<br />
Engineer’s Estimate<br />
Number <strong>of</strong> Proposals 3<br />
Received<br />
Planholders list:<br />
MMS Design Assoc., Nolte Associates, Inc.<br />
12/31/10
RFP for State Lobbyist<br />
License Required<br />
Project Number<br />
Fees<br />
Pre-Proposal Meeting<br />
Proposals Due<br />
Engineer’s Estimate<br />
Number <strong>of</strong> Proposals<br />
Received<br />
Planholders list:<br />
Legislative Services<br />
N/A<br />
$10.00 or $15.00 if mailed<br />
Monday, October 6, 2008 at 10:00 a.m.<br />
1 Frank H. Ogawa Plaza<br />
1 st Floor Hearing Room 3<br />
Monday, October 13, 2008 at 2:00 p.m.<br />
250 Frank H. Ogawa Plaza, Suite 3341<br />
Contract Administration Front Desk<br />
3<br />
Townsend Public Affairs, Strategic Counsel PLC<br />
12/31/10
RFQ-2008-2011 As Needed Transportation Engineering Services<br />
License Required Transportation and Engineering Services<br />
Project Number<br />
N/A<br />
Fees<br />
$10.00 or $15.00 if mailed<br />
Pre-Proposal Meeting Thursday, October 16, 2008 at 2:00 p.m.<br />
250 Frank H. Ogawa Plaza<br />
Broadway Conference Room<br />
Proposals Due<br />
Monday, November 13, 2008 at 2:00 p.m.<br />
250 Frank H. Ogawa Plaza, Suite 3341<br />
Contract Administration Front Desk<br />
Engineer’s Estimate<br />
Number <strong>of</strong> Proposals<br />
Received<br />
Planholders list:<br />
T. Y. Lin International, Dowling Associates, MGE<br />
Engineering, Inc., URS Corp., DKS Associates, Fehr &<br />
Peers, Kimley-Horn, Wood Rodgers, Watry Design, Inc.,<br />
LAN Engineering, BKF Engineers, CHS Consulting Group,<br />
Questa Engineering Corp., Walter P. Moore, Transpedia<br />
Consulting Engineers, KOA Corporation, K.C.Pierce &<br />
Assoc., DMJM Harris/AECOM., Questa Engineering,<br />
Transportation Engineering & Planning<br />
12/31/10
RFP for the Central <strong>City</strong> East Commercial Security Pilot Program and the<br />
Coliseum Commercial Security Pilot Program <strong>Oakland</strong> California<br />
License Required Security<br />
Project Number<br />
N/A<br />
Fees<br />
$Free or $9.05 if mailed<br />
Pre-Proposal Meeting Thursday, September25, 2008 at 10:00 am<br />
In Hearing Room 1 located at 1 Frank Ogawa Plaza<br />
Proposals Due<br />
Thursday, October 2, 2008 AT 2:00 PM.<br />
250 Frank H. Ogawa Plaza, Suite 3341<br />
Contract Administration Front Desk<br />
Engineer’s Estimate<br />
Number <strong>of</strong> Proposals<br />
Received<br />
Planholders list:<br />
12/31/10
RFP for Temporary Employment Services<br />
License Required Employment Services<br />
Project Number<br />
N/A<br />
Fees<br />
$10.00 or $19.05 if mailed<br />
Pre-Proposal Meeting Friday, September12, 2008 at 9:00 am<br />
in classroom 1 located on the 2 nd floor<br />
Lionel Wilson Building<br />
150 Frank Ogawa Plaza,<br />
Proposals Due<br />
Friday, September 26, 2008 AT 2:00 PM.<br />
250 Frank H. Ogawa Plaza, Suite 3341<br />
Contract Administration Front Desk<br />
Engineer’s Estimate<br />
Number <strong>of</strong> Proposals<br />
Received<br />
Planholders list:<br />
Paradigm Staffing Solutions, Dynamic Office & Accounting<br />
Solutions, OUTSOURCE Consulting Services, Inc., RFI,<br />
Quality Staffing, Inc., Maxim Healthcare, Kelly Services,<br />
Bennatt-Pryor, Pr<strong>of</strong>essional Staffing, ACT 1, Apple One<br />
Employment Services, Diversified Personnel, Pr<strong>of</strong>essional<br />
Staffing Resources<br />
12/31/10
RFP for the CEQA Environmental Documents/CEQA Consultanting Service<br />
License Required Environmental Services Consultants<br />
Project Number<br />
N/A<br />
Fees<br />
$FREE or $9.05 if mailed<br />
Pre-Proposal Meeting Tuesday, August 19, 2008 at 2:30pm<br />
<strong>City</strong> Hall Hearing Room 3<br />
1 Frank Ogawa Plaza,<br />
Proposals Due<br />
Wednesday, September 3, 2008 AT 2:00 PM.<br />
250 Frank H. Ogawa Plaza, Suite 3341<br />
Contract Administration Front Desk<br />
Engineer’s Estimate<br />
Number <strong>of</strong> Proposals<br />
Received<br />
Planholders list:<br />
PMC, PBS &J, Lamphier-Gregory, Agilent Consulting<br />
12/31/10
RFQ For Transportation Engineering Services on Intelligent Transportation<br />
Systems (ITS) Projects<br />
License Required Transportation Engineering Firms or Civil Engineering<br />
Project Number<br />
N/A<br />
Fees<br />
$10 or $15 if mailed<br />
Pre-Proposal Meeting Thursday, August 7, 2008<br />
Proposals Due<br />
Thursday, August 28, 2008 @ 2:00 p.m.<br />
250 Frank H. Ogawa Plaza, Suite 3341<br />
Contract Administration Front Desk<br />
Engineer’s Estimate<br />
Number <strong>of</strong> Proposals 3<br />
Received<br />
Planholders list:<br />
DKS Associates, KOA Corporation, TJKM Transportation<br />
Consultants, Kimley-Horn Associates, Inc,, Dowling<br />
Associates, Access Design & Construction, FEHR & Peers<br />
12/31/10
RFP/RFQ For the <strong>Oakland</strong> Police Department<br />
SEXUAL ASSAULT EXAMINATIONS<br />
License Required N/A<br />
Project Number<br />
N/A<br />
Fees<br />
Pre-Proposal Meeting PRE-PROPOSAL MEETING HAS BEEN WAIVED<br />
Proposals Due<br />
Wednesday June 25, 2008 @ 2:00 p.m.<br />
250 Frank H. Ogawa Plaza, Suite 3341<br />
Contract Administration Front Desk<br />
Engineer’s Estimate<br />
Number <strong>of</strong> Proposals 2<br />
Received<br />
Planholders list:<br />
VBS Services, Central Medical Laboratories<br />
12/31/10
RFP/RFQ For the <strong>Oakland</strong> Police Department<br />
PERSONNEL DIVISION/PERSONNEL ASSESSMENT SYSTEM(PAS)<br />
License Required N/A<br />
Project Number<br />
N/A<br />
Fees<br />
Pre-Proposal Meeting PRE-PROPOSAL MEETING HAS BEEN WAIVED<br />
Proposals Due<br />
Wednesday June 25, 2008 @ 2:00 p.m.<br />
250 Frank H. Ogawa Plaza, Suite 3341<br />
Contract Administration Front Desk<br />
Engineer’s Estimate<br />
Number <strong>of</strong> Proposals 1<br />
Received<br />
Planholders list:<br />
Michael Palmertree, MFT<br />
12/31/10
RFP for Special Inspection and Testing Services for the <strong>Oakland</strong> Museum <strong>of</strong><br />
California Renovation Project* THIS IS NOT A CITY OF OAKLAND PROJECT*<br />
License Required N/A<br />
Project Number<br />
N/A<br />
Fees<br />
Pre-Proposal Meeting<br />
Proposals Due<br />
Engineer’s Estimate<br />
Number <strong>of</strong> Proposals<br />
Received<br />
Planholders list:<br />
Monday June 16, 2008 @ 10:00 a.m.<br />
Mr. David Zainer, ProPM, Inc.<br />
3470 Mt. Diablo Blvd. Suite A-310<br />
Lafayette, CA 94549<br />
THIS IS NOT A CITY OF OAKLAND PROJECT<br />
12/31/10
RFP for Contract Auditing Services for the Public Works Agency-REVISED<br />
License Required N/A<br />
Project Number<br />
N/A<br />
Fees FREE- If Mailed $9.05<br />
Pre-Proposal Meeting Monday, March 31, 2008 at 10:00 a.m.<br />
<strong>City</strong> Hall, Hearing Room 3<br />
First Floor<br />
Proposals Due<br />
Tuesday April 11, 2008 @ 2:00 p.m.<br />
250 Frank H. Ogawa Plaza, Suite 3341<br />
Contract Administration Front Desk<br />
Engineer’s Estimate<br />
Number <strong>of</strong> Proposals 4<br />
Received<br />
Planholders list:<br />
MGT <strong>of</strong> America<br />
12/31/10
RFP for Department <strong>of</strong> Human Services Multipurpose Senior Services Programs<br />
and Linkages<br />
License Required Human Services, Medical<br />
Project Number<br />
G307410<br />
Fees FREE- If Mailed $9.05<br />
Pre-Proposal Meeting Thursday March 20, 2008 at 2:30 p.m.<br />
Skyline Conference Room, 3 rd Floor<br />
Proposals Due<br />
Tuesday April 2, 2008 @ 2:00 p.m.<br />
250 Frank H. Ogawa Plaza, Suite 3341<br />
Contract Administration Front Desk<br />
Engineer’s Estimate<br />
Number <strong>of</strong> Proposals 6<br />
Received<br />
Planholders list:<br />
Community Care Services, Alta Bates Summit, Maxm<br />
Healthcare, Right at Home<br />
12/31/10
RFP for Keep <strong>Oakland</strong> Clean and Beautiful Division Team <strong>Oakland</strong> Program 2008-<br />
2009<br />
License Required N/A<br />
Project Number<br />
N/A<br />
Fees FREE- If Mailed $9.05<br />
Pre-Proposal Meeting Thursday March 20, 2008 at 10:30 a.m.<br />
Skyline Conference Room, 3 rd Floor<br />
Proposals Due<br />
Thursday April 10, 2008 @ 2:00 p.m.<br />
250 Frank H. Ogawa Plaza, Suite 3341<br />
Contract Administration Front Desk<br />
Engineer’s Estimate<br />
Number <strong>of</strong> Proposals 2<br />
Received<br />
Planholders list:<br />
LAO Family Community, East Bay Conservation<br />
Corps.(Civiccorps Schools), Emile Durelde<br />
12/31/10
RFP for <strong>Oakland</strong> Green Jobs Corps<br />
License Required N/A<br />
Project Number<br />
N/A<br />
Fees $10.00- If Mailed $15.00<br />
Pre-Proposal Meeting Monday March 10, 2008 at 1:30 p.m.<br />
<strong>City</strong> Hall Hearing Room, 1<br />
Proposals Due<br />
Thursday April 3, 2008 @ 2:00 p.m.<br />
250 Frank H. Ogawa Plaza, Suite 3341<br />
Contract Administration Front Desk<br />
Engineer’s Estimate<br />
Number <strong>of</strong> Proposals 3<br />
Received<br />
Planholders list:<br />
Green Consultants, RTTC, Rising Sun Energy Center, Inter-<br />
<strong>City</strong> Services, Inc., Cypress Mandela Training Center, Inc.,<br />
Green Consulting Service, The Youth Employment<br />
Partnership, Presley & Associates<br />
12/31/10
RFP for Security Guard Services-REBID<br />
License Required N/A<br />
Project Number<br />
N/A<br />
Fees $10.00- If Mailed $15.00<br />
Pre-Proposal Meeting Thursday February 28, 2008 at 10:00 a.m.<br />
Skyline Conference Room 3rd Floor<br />
Proposals Due<br />
Tuesday March 11, 2008 @ 2:00 p.m.<br />
250 Frank H. Ogawa Plaza, Suite 3341<br />
c/o Contract Administration<br />
Engineer’s Estimate<br />
Number <strong>of</strong> Proposals 7<br />
Received<br />
Planholders list:<br />
ANI Private Security & Patrol, Silicon Valley Security &<br />
Patrol, McCoy’s Patrol Service, Arrakis Pr<strong>of</strong>. Svc.,<br />
NCLN20., Inc., ABC Security, Allied Barton, Pride<br />
Security, National Security, International Services, Inc.,<br />
Cypress Security, LLC, McCoy’s Patrol Service,<br />
12/31/10
RFP for Security Guard Services<br />
License Required N/A<br />
Project Number<br />
N/A<br />
Fees $10.00- If Mailed $15.00<br />
Pre-Proposal Meeting Wednesday January 2, 2008 at 10:00 a.m.<br />
Skyline Conference Room 3rd Floor<br />
Proposals Due<br />
Wednesday January 16, 2008 @ 2:00 p.m.<br />
250 Frank H. Ogawa Plaza, Suite 3341<br />
c/o Contract Administration<br />
Engineer’s Estimate<br />
Number <strong>of</strong> Proposals 7<br />
Received<br />
Planholders list:<br />
AMI Private Security & Patrol, Inc., C.I.S.S.,Arrakis Pr<strong>of</strong>.<br />
Serv., American Discount Security, Sidebar Security, Stowe<br />
Security Specialist, Cypress Sercurity, LLC., International<br />
Services, Inc., ABC Security Service, Inc., WSA &<br />
Associates, Inc.<br />
12/31/10
RFP for Graphic Design Services<br />
License Required N/A<br />
Project Number<br />
N/A<br />
Fees $Free- If Mailed $9.05<br />
Pre-Proposal Meeting Thursday December 13, 2007 at 9:00 a.m.<br />
Broadway Conference Room 4 th Floor<br />
Proposals Due<br />
Tuesday January 8, 2008 @ 2:00 p.m.<br />
250 Frank H. Ogawa Plaza, Suite 3341<br />
c/o Contract Administration<br />
Engineer’s Estimate Not to Exceed $100,000<br />
Number <strong>of</strong> Proposals 11<br />
Received<br />
Planholders list:<br />
CED, Inc., Sue Kearny Graphic Craftwoman, O’Rorke, Inc.,<br />
Badali Design, A Media, MMM Design, Circle Point, Liu-<br />
Johnson Design, L & D Printing, Sphinx Graphics,<br />
Schenker Design, Real Time Design, Jung Design, Gigantic<br />
Idea Studio, BE Graphics & Design, Winning Strategies,<br />
Pat Davis Design Group, Arrakis Pr<strong>of</strong>essional Service,<br />
Cowan Communication Arts, Allegra Consulting, Inc.,<br />
12/31/10
RFQ and RFP for Construction Manager at Risk/General Contractor Services for<br />
the <strong>City</strong> <strong>of</strong> Okaland for the Fire Station No.18 Project and or East <strong>Oakland</strong> Sports<br />
Center ProjectDesign Services<br />
License Required B<br />
Project Number<br />
N/A<br />
Fees $10.00- If Mailed $14.50<br />
Pre-Proposal Meeting<br />
Proposals Due<br />
Engineer’s Estimate<br />
Number <strong>of</strong> Proposals<br />
Received<br />
Planholders list:<br />
Mandatory Thursday December 6, 2007 at 9:30 a.m.<br />
Hearing Room 2 <strong>City</strong> Hall<br />
One Frank Ogawa Plaza<br />
Wednesday December 19, 2007 @ 10:00 a.m.<br />
250 Frank H. Ogawa Plaza, Suite 3341<br />
c/o Contract Administration<br />
Fire Station 18-$7 million, East <strong>Oakland</strong> Sports Center-<br />
$11.7 million<br />
Swinerton Builders, Turner Constuction, WE Lyons<br />
Construction, West Bay Builders, CED, Inc., BBI<br />
Construction, Access Design & Construction, K.O.O.<br />
Construction, Inc., Cooper Pugeda Mgmt, Inc., W.A.<br />
Thomas Co., Inc., Acumen Building Enterprises, Inc.,<br />
12/31/10
RFP for OFD Emergency Medical Services Disaster Specialist<br />
License Required Consulting Training Firms<br />
Project Number<br />
G262710<br />
Fees $Free- If Mailed $9.05<br />
Pre-Proposal Meeting Thursday November 29, 2007 at 11:00 a.m.<br />
Skyline Conference Room 3 rd Floor<br />
Proposals Due<br />
Wednesday December 12, 2007 @ 2:00 p.m.<br />
250 Frank H. Ogawa Plaza, Suite 3341<br />
c/o Contract Administration<br />
Engineer’s Estimate N/A<br />
Number <strong>of</strong> Proposals<br />
Received<br />
Planholders list:<br />
12/31/10
RFP for Hazardous and Universal Waste Services REVISED<br />
License Required N/A<br />
Project Number<br />
N/A<br />
Fees $10.00- If Mailed $19.05<br />
Pre-Proposal Meeting Thursday October 25, 2007 at 10:00 p.m.<br />
Fox Conference Room 5 th Floor<br />
Proposals Due<br />
Friday November 16, 2007 @ 2:00 p.m.<br />
250 Frank H. Ogawa Plaza, Suite 3341<br />
c/o Contract Administration<br />
Engineer’s Estimate Not to Exceed $149,000<br />
Number <strong>of</strong> Proposals 2<br />
Received<br />
Planholders list:<br />
Electronic Waste Management, Bayview Environmental,<br />
Morgan Environmental Services, Inc., Clean Harbors<br />
Environmental Services, Filter Recycling Service, Decon<br />
Environmental, General Environmental Management, Inc.,<br />
Universal Waste Management, Inc., Electronic Waste<br />
Management, MSE , ARC International, CED, Inc.,<br />
12/31/10
RFP for Asbestos/ Lead-Based Paint/Mold Consulting Services<br />
License Required N/A<br />
Project Number<br />
N/A<br />
Fees $10.00- If Mailed $19.05<br />
Pre-Proposal Meeting Wednesday October 24, 2007 at 2 p.m.<br />
Fox Conference Room 5 th Floor<br />
Proposals Due<br />
Friday November 16, 2007 @ 2:00 p.m.<br />
250 Frank H. Ogawa Plaza, Suite 3341<br />
c/o Contract Administration<br />
Engineer’s Estimate Not to Exceed $250,000<br />
Number <strong>of</strong> Proposals 9<br />
Received<br />
Planholders list:<br />
IHI Environmental, MACTEC, SCA Environmental RGA<br />
Environmental, ACC Environmental Schutze & Associates,<br />
Bayview Environmental, ATC Associates, Inc., Ninyo &<br />
Moore, Millennium Consulting, AEI Consultants, Winzler<br />
& Kelly, Vista Environmental Consulting, PSI, Inc. MSE,<br />
Kellco Macs, Bureau Veritas North America, Inc.,<br />
12/31/10
RFP for Environmental Consulting Services<br />
License Required N/A<br />
Project Number<br />
N/A<br />
Fees $10.00- If Mailed $19.05<br />
Pre-Proposal Meeting Wednesday October 24, 2007 at 10:00 a.m.<br />
Fox Conference Room 5 th Floor<br />
Proposals Due<br />
Friday November 16, 2007 @ 2:00 p.m.<br />
250 Frank H. Ogawa Plaza, Suite 3341<br />
c/o Contract Administration<br />
Engineer’s Estimate Not to Exceed $750,000<br />
Number <strong>of</strong> Proposals 19<br />
Received<br />
Planholders list:<br />
OTG Enviroengineering Solutions, Inc., LFR, Inc.,<br />
Kleinfelder, Inc., Strategic Engineering,& Science, Inc.,<br />
MACTEC, Geomatrix Consultants, Weiss Associates, SCA<br />
Environmental, TRC, ACC, Treadwell & Rollo, Schutze &<br />
Associates, Bayview Environmental, Ninyo & Moore, The<br />
Source Group, Morgan Environmental Services, Inc., ENSR<br />
Millennium Consulting, Erler & Kalinonski, Inc., Nichols<br />
Consulting Engineering, Kennedy/Jenks Consultants,<br />
Winzler & Kelly, Terrasearch, Inc., ATC Associates, Inc.,<br />
Baseline , R&M Environmental, PSI, Inc. MSE, Burns &<br />
McDonnell, Hygienetics Environmental Services, 4 Leaf ,<br />
Inc., AEI Consultants, Northgate Environmental,SOMA<br />
Environmental, Weston Solutions, CED, Inc., Aliquot<br />
Associates<br />
12/31/10
RFP Civil Engineering Design Services for 7 th St. West <strong>Oakland</strong> Transit Village in<br />
<strong>Oakland</strong>, California<br />
License Required N/A<br />
Project Number<br />
G313120<br />
Fees $Free- If Mailed $9. 05<br />
Pre-Proposal Meeting Thursday October 25, 2007 at 9:00 a.m.<br />
Skyline Conference Room 3 rd Floor<br />
Proposals Due<br />
Friday November 9, 2007 @ 2:00 p.m.<br />
250 Frank H. Ogawa Plaza, Suite 3341<br />
c/o Contract Administration<br />
Engineer’s Estimate $2,600.000<br />
Number <strong>of</strong> Proposals 6<br />
Received<br />
Planholders list:<br />
Kimley- Horn & Associates, BKF Engineers, Sandis,<br />
Amphion, TransSystems Corp., Bayview Environmental,<br />
Bruce Jett Associates, KOA Corporation, Robert La Rocca<br />
& Associates, MSE, M<strong>of</strong>fatt& Nichol, RBF Consulting,<br />
Keller Mitchell, ESI Engineers, Golden Associates, , BMB<br />
Construction Properties, Gates & Associates, WRT, Harris<br />
& Associates, Terrasearch, Inc., Winzler & Kelly, Sasaki<br />
Associates, Inc., Adrienne Wong Associates, CED, Inc.,<br />
12/31/10
RFP /RFQ for the <strong>Oakland</strong> Police Department Counseling Program for Sworn<br />
Members/Dependents<br />
License Required N/A<br />
Project Number<br />
N/A<br />
Fees $Free- If Mailed $9.05<br />
Pre-Proposal Meeting Wednesday October 17, 2007 at 10:00 a.m.<br />
Skyline Conference Room 3 rd Floor<br />
Proposals Due<br />
Wednesday October 24, 2007 @ 2:00 p.m.<br />
250 Frank H. Ogawa Plaza, Suite 3341<br />
c/o Contract Administration<br />
Engineer’s Estimate $108,000.00<br />
Number <strong>of</strong> Proposals 2<br />
Received<br />
Planholders list:<br />
Magellan Health Services, Managed Health Network,<br />
Concern EAP<br />
12/31/10
RFP for the Municipal Swimming Pools REVISED<br />
License Required N/A<br />
Project Number<br />
N/A<br />
Fees $10.00- If Mailed $19.05<br />
Pre-Proposal Meeting Wednesday September 12, 2007 at 9:00 a.m.<br />
Skyline Conference Room 3 rd Floor<br />
Proposals Due<br />
Tuesday October 30, 2007 @ 2:00 p.m.<br />
250 Frank H. Ogawa Plaza, Suite 3341<br />
c/o Contract Administration<br />
Engineer’s Estimate $250,000.00<br />
Number <strong>of</strong> Proposals 0<br />
Received<br />
Planholders list:<br />
Salas O’Brien Engineering, EMCOR Energy Services, MSE<br />
Group, Gutierrez Assoc., Rockridge Builders, Weiss<br />
Associates, Versar, Inc.<br />
12/31/10
RFP for Civil Engineering Design Services for Adeline Street Overhead in <strong>Oakland</strong><br />
California<br />
License Required N/A<br />
Project Number<br />
N/A<br />
Fees $FREE– If Mailed $19.05<br />
Pre-Proposal Meeting Wednesday July 11, 2007 at 2:00 p.m.<br />
Skyline Conference Room 3 rd Floor<br />
Proposals Due<br />
Friday August 10, 2007 @ 2:00 p.m.<br />
250 Frank H. Ogawa Plaza, Suite 3341<br />
c/o Contract Administration<br />
Engineer’s Estimate $160,000.00 to $170,000.00<br />
Number <strong>of</strong> Proposals 3<br />
Received<br />
Planholders list:<br />
Biggs Cardosa, M<strong>of</strong>fatt & Nichol, KPFF Consulting<br />
Engineers, ESI, MGE, Inc.Jacobs Engineering, Winzler &<br />
Kelly, URS Corporation<br />
12/31/10
RFP for As Needed Civil Engineering Services for Various <strong>City</strong> <strong>of</strong> <strong>Oakland</strong> Projects<br />
License Required N/A<br />
Project Number<br />
N/A<br />
Fees $FREE– If Mailed $19.05<br />
Pre-Proposal Meeting Thursday May 17, 2007 at 2:00 p.m.<br />
<strong>City</strong> Hall, Hearing Room No.1<br />
Proposals Due<br />
Friday June 8, 2007 @ 2:00 p.m.<br />
250 Frank H. Ogawa Plaza, Suite 3341<br />
c/o Contract Administration<br />
Engineer’s Estimate $200,000.00 to $350,000.00<br />
Number <strong>of</strong> Proposals 17<br />
Received<br />
Planholders list:<br />
Greenwood & Moore, Inc., Biggs Cardosa Associates,<br />
Rajappan & Meyer, Wallace Group, Aliquot Associates,<br />
Inc., James Wong & Associates, Earthquake & Structures,<br />
Bay Construction Co.,Oberkamper & Associates, Winzler &<br />
Kelly Consulting Engineers, HHTEC, KCA Engineers,<br />
MACTEC , Van Maren & Associates, TRC, Eagle<br />
Engineering Construction , Inc., Triad/Holmes Associates,<br />
Testing Engineers, Rajappan & Meyer, Testing Engineers,<br />
Chaudhary & Associates, Phillip Williams & Associates<br />
Ltd., Cal Engineering & Geology, Luk and Associate,<br />
Harris & Associates, Katz, Okitsu & Associates, URS<br />
Corporation, Nichols Consulting Engineers MSE<br />
12/31/10
RFP and RFQ for Construction Manager At Risk/General Contractor Services for<br />
the <strong>City</strong> <strong>of</strong> <strong>Oakland</strong> and <strong>Oakland</strong> Museum <strong>of</strong> California – <strong>Oakland</strong> Museum<br />
Renovation Project<br />
License Required N/A<br />
Project Number<br />
C239611<br />
Fees $10.00– If Mailed $14.50<br />
Pre-Proposal Meeting<br />
Proposals Due<br />
Engineer’s Estimate<br />
Number <strong>of</strong> Proposals<br />
Received<br />
Planholders list:<br />
Thursday May 10, 2007 at 10:00 a.m.<br />
Restaurant/Cafeteria <strong>of</strong> the <strong>Oakland</strong> Museum<br />
1000 Oak Street, Second Floor<br />
<strong>Oakland</strong>, CA MANDATORY<br />
Thursday May 22, 2007 @ 2:00 p.m.<br />
250 Frank H. Ogawa Plaza, Suite 3341<br />
c/o Contract Administration<br />
10.8+ million (estimated)<br />
3<br />
Oliver & Co., BBI Construction, PROPM, Inc., Swinerton<br />
Builders, Museum, NBC General Contractors Corp., Vance<br />
Brown, Inc., MCA, Cahill Contractors, Inc., W.E. Lyons<br />
Construction MSE MWA , HQE, Inc.,<br />
RFP for Lake Merritt Clean Lake Contract<br />
License Required N/A<br />
Project Number<br />
N/A<br />
Fees $FREE – If Mailed $9.05<br />
Pre-Proposal Meeting Monday April 30, 2007 at 2:30p.m.<br />
Fox Conference Room 5 th Floor<br />
250 Frank H. Ogawa Plaza<br />
Proposals Due<br />
Thursday May 10, 2007 @ 2:00 p.m.<br />
250 Frank H. Ogawa Plaza, Suite 3341<br />
c/o Contract Administration<br />
Engineer’s Estimate Not to exceed $300,000<br />
Number <strong>of</strong> Proposals 1<br />
Received<br />
Planholders list:<br />
Mike Farmer Janitorial, The Lake Merritt Institute, Drake &<br />
Drakes Pipeline Construction<br />
12/31/10
RFP for As- Needed Civil Engineering<br />
License Required N/A<br />
Project Number<br />
N/A<br />
Fees $10.00 – If Mailed $19.05<br />
Pre-Proposal Meeting Wednesday January 24, 2007 at 10:00 a.m.<br />
Hearing Room 1, <strong>City</strong> Hall<br />
1 Frank H. Ogawa Plaza<br />
Proposals Due<br />
Friday February 16, 2007 @ 2:00 p.m.<br />
250 Frank H. Ogawa Plaza, Suite 3341<br />
c/o Contract Administration<br />
Engineer’s Estimate $150,000-$350,000<br />
Number <strong>of</strong> Proposals 11<br />
Received<br />
Planholders list:<br />
Korve/DMJM Harris, MacTec, M<strong>of</strong>fatt & Nichol, Ty Lin<br />
International, DTN Engineers, Inc., Willdan, Kimley Horn<br />
& Assoc., Bellecci & Assoc., Winzler & Kelly, Rail<br />
Surveyors & Engineers, Inc., Sikaroudi & Assoc.,<br />
Waterworks Engineers, Allquot Assoc.,BKF Engineers,<br />
WoodRodgers, DKS Assoc., TRC, Magdave Assoc. Inc.,<br />
F.E., Jordan Assoc., Inc.,Kennedy Jenks, MSE Group, URS<br />
Corp.,<br />
12/31/10
RFP for Work Management System<br />
License Required N/A<br />
Project Number<br />
N/A<br />
Fees Free – If Mailed $9.05<br />
Pre-Proposal Meeting Monday November 13, 2006 at 10:00 a.m.<br />
Skyline Conference Room,<br />
250 Frank H. Ogawa Plaza, 3rd Floor<br />
Proposals Due<br />
Tuesday December 12, 2006 @ 2:00 p.m.<br />
250 Frank H. Ogawa Plaza, Suite 3341<br />
c/o Contract Administration<br />
Engineer’s Estimate N/A<br />
Number <strong>of</strong> Proposals 6<br />
Received<br />
Planholders list:<br />
Symbol, MSA Systems, Inc., True Point Solutions, Accela<br />
Govt. S<strong>of</strong>tware, SPL WorldGroup, Inc., Hansen ,<br />
Interlocsolutions, Walsh Wireless Solutions,Westib<br />
Solutions, Inc., Vestra Resources, Inc., Motorola, Inc.,<br />
Farallon Geographics, Inc., AEKO Consulting,<br />
Environmental Systems Research Institute, Inc., Carter<br />
Burgess, Corrigo, Infor, Cingular Wireless, Westin<br />
Solutions Through Technology, Wenns<strong>of</strong>t, Woolpert,<br />
Inc.,Hansen Informations Technologies, God So Loved You<br />
Min, Inc., Azteca Systems, Inc.,AFKO Consulting, Drake&<br />
Drake Pipeline Consulting, Interloc Solutions, Inc., RJN<br />
Group, Inc.,<br />
12/31/10
RFP for The Operation and Management <strong>of</strong> Thirteen <strong>City</strong> <strong>of</strong> <strong>Oakland</strong> Off-Street<br />
Parking Facilities<br />
License Required Qualified Parking Contractors<br />
Project Number<br />
N/A<br />
Fees $10.00 – If Mailed $19.05<br />
Pre-Proposal Meeting Thursday, October 5, 2006 at 2:00 p.m.<br />
Broadway Conference Room,<br />
250 Frank H. Ogawa Plaza, 4 th Floor<br />
Proposals Due<br />
Tuesday October 24, 2006 @ 2:00 p.m.<br />
250 Frank H. Ogawa Plaza, Suite 3341<br />
c/o Contract Administration<br />
Engineer’s Estimate N/A<br />
Number <strong>of</strong> Proposals 6<br />
Received<br />
Planholders List:<br />
Parking Concepts, Express Parking Management, Bay Area<br />
Parking Douglas Parking Co., Pacific Park Management,<br />
Imperial Parking., NM Parking, Central Parking System,<br />
Standard Parking, Five Star Parking<br />
RFP for As Needed Architectural Services for Various Capital Improvement<br />
Projects<br />
License Required Architectural Firms<br />
Project Number<br />
N/A<br />
Fees $10.00 – If Mailed $19.05<br />
Pre-Bid Meeting<br />
Tuesday, September 5, 2006 at 2:00 p.m.<br />
<strong>City</strong> Hall Hearing Room 1,<br />
One <strong>City</strong> Hall Plaza<br />
Proposals Due<br />
Friday September 29, 2006 @ 2:00 p.m.<br />
250 Frank H. Ogawa Plaza, Suite 3341<br />
c/o Contract Administration<br />
Engineer’s Estimate $150,000 to $350,000<br />
Number <strong>of</strong> Proposals 21<br />
Received<br />
Planholders list:<br />
Kirk Peterson & Associates, Guiterrez/Associates, Noll & Tam, Shah<br />
Kawasaki, Ratcliff, Komorous-Towney Architects, Kava Massih<br />
Architects, FMG Architects, Frank Architects, Byrens Associates,<br />
Jeffrey E. Wong Architects, KPA, RPR Architects, Colland Jang<br />
Architecture, VBN Architects, MacDonald Architects, Kenney and<br />
Associates, Don Dommer Associates, YHLA Architects, Famous<br />
Designs Architects, Inc., Claudia Falconer Architects, Salas O’brien<br />
Engineers, Greenbank Associates, Lowney Architecure, MWM<br />
Architects, Inc., Murakami/Nelson, SJ Engineers, Michael Willis<br />
Architects, Muller Caufield Architects,<br />
12/31/10
RFP for As Needed Geotechnical Consultants<br />
License Required Geotechnical Engineering Firms<br />
Project Number<br />
N/A<br />
Fees $10.00 – If Mailed $15.00<br />
Pre-Bid Meeting<br />
Wednesday, June 14, 2006 at 10:00 a.m.<br />
<strong>City</strong> Hall Hearing Room 1,<br />
One <strong>City</strong> Hall Plaza<br />
Proposals Due<br />
Thursday July 06, 2006 @ 2:00 p.m.<br />
250 Frank H. Ogawa Plaza, Suite 3341<br />
c/o Contract Administration<br />
Engineer’s Estimate<br />
Number <strong>of</strong> Proposals<br />
Received<br />
Planholders List<br />
RFP for As Needed Landscape Architects<br />
License Required Landscape Architectural Firms<br />
Project Number<br />
N/A<br />
Fees $10.00 – If Mailed $14.50<br />
Pre-Bid Meeting<br />
Wednesday, June 21, 2006 at 10:00 a.m.<br />
<strong>City</strong> Hall Hearing Room 1,<br />
One <strong>City</strong> Hall Plaza<br />
Proposals Due<br />
Wednesday, July 12, 2006 @ 2:00 p.m.<br />
250 Frank H. Ogawa Plaza, Suite 3341<br />
c/o Contract Administration<br />
Engineer’s Estimate<br />
Number <strong>of</strong> Proposals<br />
Received<br />
Planholders List<br />
12/31/10
RFP for Team <strong>Oakland</strong> Program<br />
License Required Youth Serving Organizations or Closely Related<br />
Pr<strong>of</strong>essionals<br />
Project Number<br />
P35510<br />
Fees $10.00 – If Mailed $15.00<br />
Pre-Bid Meeting<br />
Wednesday, February 22, 2006 at 10:00 a.m.<br />
250 Frank H. Ogawa Plaza, 3 rd Floor<br />
Skyline Conference Room<br />
Proposals Due<br />
Thursday, March 23, 2006 @ 2:00 p.m.<br />
250 Frank H. Ogawa Plaza, Suite 3341<br />
c/o Contract Administration<br />
Engineer’s Estimate Not to exceed $498,000.00<br />
Number <strong>of</strong> Proposals<br />
Received<br />
Planholders List<br />
RFP for The Business Recycling Technical Assistance Program<br />
License Required Environmental, Solid Waste Consultants<br />
Project Number<br />
N/A<br />
Fees $10.00 – If Mailed $15.00<br />
Pre-Bid Meeting<br />
Tuesday, January 31, 2006 at 9:00 a.m.<br />
250 Frank H. Ogawa Plaza, 5 th Floor<br />
Fox Conference Room<br />
Proposals Due<br />
Tuesday, February 14, 2006 @ 2:00 p.m.<br />
250 Frank H. Ogawa Plaza, Suite 3341<br />
c/o Contract Administration<br />
Engineer’s Estimate $50,000.00<br />
Number <strong>of</strong> Proposals 3<br />
Received<br />
Planholders List<br />
12/31/10
RFP for Time Clock Based Time and Attendance System<br />
License Required Time Clock System, Computers, Computer S<strong>of</strong>tware<br />
Project Number<br />
N/A<br />
Fees Pick-up Free – If Mailed $9.00<br />
Pre-Bid Meeting<br />
Tuesday, November 1, 2005 at 10:00 a.m.<br />
250 Frank H. Ogawa Plaza, Suite 3341<br />
Skyline Conference Room<br />
Proposals Due<br />
Tuesday, November 22, 2005 @ 2:00 a.m.<br />
250 Frank H. Ogawa Plaza, Suite 3341<br />
c/o Contract Administration<br />
Engineer’s Estimate $50,000.00<br />
Number <strong>of</strong> Proposals<br />
Received<br />
Planholders List<br />
Studio One Art Center Asbestos and Lead-Base Materials Abatement Project and<br />
Municipal Boathouse Rehabilitation and Lakeside Park Improvement Project<br />
License Required B<br />
Project Number<br />
C244710 and C241910<br />
Fees Pick-up $10.00 – If Mailed $15.00<br />
Pre-Bid Meeting<br />
N/A<br />
Proposals Due<br />
Tuesday, June 7, 2005 @ 4:00pm<br />
250 Frank H. Ogawa Plaza, Suite 3341<br />
c/o Contract Administration<br />
Engineer’s Estimate $6,100,000.00 - $6,500,000.00 and<br />
$7,000,000.00 - $7,500,000.00<br />
Number <strong>of</strong> Proposals<br />
Received<br />
Planholders List<br />
Arnz Builders, BBI Construction, Thompson Pacific<br />
Construction, Inc., Vance Brown, Inc., West Bay Builder’s,<br />
Inc.<br />
12/31/10
RFP Revive Chinatown Pedestrian-Oriented Improvements Project<br />
License Required Civil Engineering, Landscape Architectural<br />
Project Number<br />
N/A<br />
Fees Pick-up $10.00 – If Mailed $15.00<br />
Pre-Bid Meeting<br />
Monday, May 10, 2005 @ 10:00 am<br />
250 Frank H. Ogawa Plaza, Suite 3341<br />
Skyline Conference Room<br />
Proposals Due<br />
Tuesday, May 31, 2005 @ 2:00pm<br />
<strong>City</strong> Clerk’s Office, One Frank Ogawa Plaza, First Floor<br />
Engineer’s Estimate N/A<br />
Number <strong>of</strong> Proposals<br />
Received<br />
Planholders List<br />
Lake Merritt Channel Improvement Project at the 7 th Street Flood Control Station<br />
License Required Environmental Consultants<br />
Project Number<br />
N/A<br />
Fees Pick-up $10.00 – If Mailed $15.00<br />
Pre-Bid Meeting<br />
Wednesday, April 6, 2005 @ 3:00 pm<br />
One <strong>City</strong> Hall Plaza, <strong>City</strong> Hall<br />
Hearing Room 2<br />
Qualifications Due Thursday, April 21, 2005 @ 2:00pm<br />
250 Frank H. Ogawa Plaza, Suite 3341<br />
c/o Contract Administration<br />
Engineer’s Estimate $7,500,000.00<br />
Number <strong>of</strong> Proposals<br />
Received<br />
Planholders List<br />
12/31/10
10 th Street Bridge Project at the Lake Merritt Channel<br />
License Required Civil Engineering<br />
Project Number<br />
N/A<br />
Fees Pick-up $10.00 – If Mailed $14.50<br />
Pre-Bid Meeting<br />
Wednesday, April 6, 2005 @ 3:00 pm<br />
One <strong>City</strong> Hall Plaza, <strong>City</strong> Hall<br />
Hearing Room 2<br />
Qualifications Due Wednesday, April 20, 2005 @ 2:00pm<br />
250 Frank H. Ogawa Plaza, Suite 3341<br />
c/o Contract Administration<br />
Engineer’s Estimate $6,000,000.00<br />
Number <strong>of</strong> Proposals<br />
Received<br />
Planholders List<br />
Lake Merritt Clean Lake Services<br />
License Required N/A<br />
Project Number<br />
N/A<br />
Fees Pick-up $10.00 – If Mailed $14.50<br />
Pre-Bid Meeting<br />
Tuesday, March 8, 2005 @ 1:00 pm<br />
250 Frank H. Ogawa Plaza, Suite 5357<br />
Fox Conference Room<br />
Qualifications Due Wednesday, March 23, 2005 @ 2:00pm<br />
250 Frank H. Ogawa Plaza, Suite 3341<br />
c/o Contract Administration<br />
Engineer’s Estimate $300,000.00<br />
Number <strong>of</strong> Proposals<br />
Received<br />
Planholders List<br />
12/31/10
<strong>City</strong>wide Street Survey and Pavement Management System Update<br />
License Required N/A<br />
Project Number<br />
N/A<br />
Fees Pick-up $10.00 – If Mailed $14.50<br />
Pre-Proposal Meeting Thursday, January 27, 2005 at 10:00 am<br />
250 Frank H. Ogawa Plaza, Suite 4304<br />
Broadway Conference Room<br />
Proposals Due<br />
Engineer’s Estimate $ 300,000.00<br />
Number <strong>of</strong> Proposals<br />
Received<br />
Planholders List<br />
Wednesday, February 16, 2005 @ 2:00pm<br />
PWA-Contract Administration, 250 Frank H. Ogawa Plaza,<br />
3 rd Fl, Suite 3341<br />
Inspection and Condition Assessment <strong>of</strong> the Existing Sanitary Sewers in West<br />
Grand Avenue From San Pablo to Wood Street<br />
License Required N/A<br />
Project Number<br />
N/A<br />
Fees Pick-up $10.00 – If Mailed $15.00<br />
Pre-Proposal Meeting Thursday, December 16, 2004 at 10:00 am<br />
250 Frank H. Ogawa Plaza<br />
Skyline Conference Room<br />
Proposals Due<br />
Tuesday, January 18, 2005 @ 2:00pm<br />
PWA-Contract Administration, 250 Frank H. Ogawa Plaza,<br />
3 rd Fl, Suite 3341<br />
Engineer’s Estimate $ N/A<br />
Number <strong>of</strong> Proposals<br />
Received<br />
Planholders List<br />
12/31/10
Request For Qualifications (RFQ) for As-Needed Transportation Engineering<br />
Services<br />
License Required N/A<br />
Project Number<br />
N/A<br />
Fees Pick-up $10.00 – If Mailed $14.50<br />
Pre-Proposal Meeting Wednesday, November 24, 2004 at 10:00 am<br />
250 Frank H. Ogawa Plaza, 4 th Floor<br />
Broadway Conference Room<br />
Proposals Due<br />
Wednesday, December 15, 2004 @ 2:00pm<br />
PWA-Contract Administration, 250 Frank H. Ogawa Plaza,<br />
3 rd Fl, Suite 3341<br />
Engineer’s Estimate $250,000.00 to $350,000.00<br />
Number <strong>of</strong> Proposals<br />
Received<br />
Planholders List<br />
Asbestos/Lead-Based Paint/Mold Consulting Services<br />
License Required A or C-42<br />
Project Number<br />
N/A<br />
Fees Pick-up $10.00 – If Mailed $15.00<br />
Pre-Proposal Meeting Wednesday, November 17, 2004 at 2:00 pm<br />
250 Frank H. Ogawa Plaza<br />
Fox Conference Room<br />
Proposals Due<br />
Engineer’s Estimate $200,000.00<br />
Number <strong>of</strong> Proposals<br />
Received<br />
Planholders List<br />
Wednesday, December 8, 2004 @ 2:00pm<br />
PWA-Contract Administration, 250 Frank H. Ogawa Plaza,<br />
3 rd Fl, Suite 3341<br />
12/31/10
Architectural Services for The Lake Merritt Sailboat House Renovation and the<br />
Related Retaining Walls Repairs, 568 Bellevue Avenue<br />
License Required Architectural and Engineering Design Services<br />
Project Number<br />
C242010<br />
Fees Pick-up $10.00 – If Mailed $14.00<br />
Pre-Proposal Meeting Thursday, September 30, 2004 @ 3:00pm<br />
Hearing Room 2, <strong>City</strong> Hall<br />
Proposals Due<br />
Friday, October 22, 2004 @ 2:00pm<br />
PWA-Contract Administration, 3 rd Fl, Suite 3341<br />
Engineer’s Estimate $3,100,000.00<br />
Number <strong>of</strong> Proposals<br />
Received<br />
Planholders List<br />
Environmental Consulting Services<br />
License Required Environmental Consulting Firms<br />
Project Number<br />
N/A<br />
Fees Pick-up $10.00 – If Mailed $14.00<br />
Pre-Proposal Meeting Monday, October 4, 2004 @ 10:00am<br />
Skyline Conference Room, 3 rd FL, Suite 3341<br />
Proposals Due<br />
Monday, November 1, 2004 @ 2:00pm<br />
PWA-Contract Administration, 3 rd Fl, Suite 3341<br />
Engineer’s Estimate $350,000.00<br />
Number <strong>of</strong> Proposals<br />
Received<br />
Planholders List<br />
12/31/10