Electrode Management – Investigation into Soft Breaks At 48MVA FeCr Closed Furnace 749<br />
Apr'05<br />
23-04-<br />
05<br />
24-04-<br />
05<br />
25-04-<br />
05<br />
26-04-<br />
05<br />
El.<br />
No<br />
E<br />
-1<br />
Paste Level (Mtr.) Charging Temperature<br />
(Deg. C)<br />
Before<br />
Filling<br />
After<br />
Filling<br />
Cylinder<br />
No.<br />
Broken<br />
Paste (Kg)<br />
Cyl Height In<br />
Mtr.<br />
Fins Cyl. Top Mw Ka<br />
Load Current. Remarks<br />
2.8 3.1 - 750 3.3 55 47 37.5 78 Normal<br />
E-2 3.0 3.1 - 250 5.2 55 46 37.5 75 Normal<br />
E-3 3.0 3.1 - 250 - 56 50 37.5 63 Normal<br />
E<br />
-1<br />
3.0 3.1 - 250 - 55 - 37.5 78 Normal<br />
E-2 2.8 3.1 - 750 4.6 57 48 37.5 81 Normal<br />
E-3 2.7 3.0 6 750 8.4 60 32 37.5 68 Normal<br />
E<br />
-1<br />
3.0 3.1 - 250 - 57 - 28 70 Normal<br />
E-2 2.9 3.1 - 500 4.2 57 50 28 74 Normal<br />
E-3 3.1 3.2 3 250 8.4 60 35 28 30 Slightly<br />
liquid<br />
E<br />
-1<br />
2.9 3.1 5 500 7.7 58 32 37.5 72 Normal<br />
E-2 2.9 3.1 2 500 5.5 57 50 37.5 78 Normal<br />
E-3 3.3 3.3 - - 6.6 57 36 37.5 70 Normal<br />
3.3 Presentation of above data (in fig – 9 & 10)<br />
Figure 9