Download 9.3 Mb pdf - IRIS
Download 9.3 Mb pdf - IRIS
Download 9.3 Mb pdf - IRIS
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
Data Processing Support<br />
Prior to, during , and following an experiment, PASSCAL<br />
personnel work with the PI and staff responsible for<br />
archiving the data on the use of essential quality-control and<br />
processing tools (Figure 30). During passive experiments,<br />
PASSCAL personnel receive and verify preliminary SEED<br />
data, working closely with both the PI and DMC personnel<br />
to assure data and metadata completeness, accuracy, and<br />
quality. Verified SEED data sets from passive experiments<br />
are forwarded to the DMC for archiving as soon as possible,<br />
usually during the experiment.<br />
Active-source data are normally collated and verified following<br />
the experiment. A new archival data format, HDF-5, has<br />
recently been adopted so that active-source metadata can be<br />
corrected without having to re-archive the whole data set at<br />
the DMC. Software for archiving and retrieval is currently<br />
being tested. This software will provide the active-source<br />
experimentalists with a data-retrieval model similar to that<br />
for the passive experimentalists—the DMC acquires the data<br />
at an early stage, and maintains the waveform and metadata<br />
independently (see Appendix C).<br />
PASSCAL Experiment<br />
raw data<br />
metadata<br />
PI<br />
Archive<br />
ready<br />
SEED or<br />
SEGY<br />
ftp<br />
orb<br />
media<br />
PASSCAL/AOF<br />
Accept SEED data<br />
Delivery Verification<br />
Check SEED Veracity<br />
Archive<br />
ready<br />
SEED or<br />
SEGY<br />
Flexible Array Experiment<br />
PI<br />
raw data<br />
metadata<br />
ftp media orb<br />
raw data<br />
metadata<br />
Create datasync and<br />
update Sent db<br />
Bundle &<br />
Ship to DMC<br />
Archive<br />
ready<br />
SEED or<br />
SEGY<br />
ftp<br />
orb<br />
DMC<br />
bob<br />
Verify Delivery<br />
and Data Archiving<br />
Figure 30. Flow of data from the PI to the <strong>IRIS</strong> Data Management Center.<br />
33