06.03.2014 Views

Download 9.3 Mb pdf - IRIS

Download 9.3 Mb pdf - IRIS

Download 9.3 Mb pdf - IRIS

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Appendix D<br />

PI Acknowledgement<br />

PI ACKNOWLEDGMENT<br />

May 12, 2003<br />

The undersigned (User) acknowledges that User will be receiving Government-owned equipment from<br />

Incorporated Research Institutions for Seismology (<strong>IRIS</strong>) pursuant to the PASSCAL Program:<br />

This equipment is being made available to User, free of charge, as a scientific resource. The equipment<br />

will be treated with care and returned in an undamaged condition at the specified return date, to the<br />

appropriate Instrument Center. User will be solely responsible for the use and care of the equipment<br />

until its return, including all shipping and handling costs and fees. User has read and agrees to abide by<br />

the conditions of the Data Delivery Policy and the Instrument Use Policy including proper<br />

acknowledgement of support in all publications.<br />

PASSCAL Instrument Centers will upon request provide advice, documentation and other support, and<br />

at User’s expense will send personnel to the field to insure that the equipment is functioning properly.<br />

Date:<br />

Principal Investigator (Printed)<br />

Signed<br />

Relevant policies:<br />

Instrument Use Policy (5/12/03)<br />

Data Delivery Policy (5/12/03)<br />

Return to:<br />

Jim Fowler<br />

<strong>IRIS</strong>/PASSCAL – NMT<br />

100 East Road<br />

Socorro, NM 87801<br />

(505) 835 5072 ph<br />

(505) 835 5079 fx<br />

Institution<br />

59

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!