Sr.<br />
<strong>No</strong>.<br />
Commercial terms<br />
free of cost.<br />
23. Supply and installation is subject to<br />
Purchaser’s acceptance.<br />
24. LC extension charges to your account, in case<br />
of delay from your side.<br />
25. Items from latest production batch only are to<br />
be supplied.<br />
26. Wherever Export Licence required, payment<br />
will be made after getting export licence and<br />
after confirmation by the supplier, with a copy<br />
of Export Licence.<br />
27.<br />
27.1<br />
27.2<br />
27.2.1<br />
Bank Guarantees (from Nationalised/<br />
Scheduled Bank/ Bank approved by Purchaser.<br />
Advance payment for the equal value valid till<br />
the completion of contract/acceptance, is to be<br />
provide by you.<br />
Towards issue of “Free Issue Material” by<br />
Purchaser for the value of the material issued,<br />
is to be provided.<br />
The Bill of material for the material used for the<br />
Fabrication work and available balance to be<br />
prepared by you and countersigned by the<br />
User Department is to be sent along with the<br />
final bill for arranging the balance/payment.<br />
Compliance<br />
27.3<br />
Towards Performance of the Contract and<br />
Product for 10% value valid till the expiry of<br />
warranty period.<br />
28. Security Deposit is to be submitted to <strong>LPSC</strong> by<br />
the successful bidder (wherever applicable )on<br />
awarding the contract<br />
29. Training – free of cost – to be imparted at<br />
Purchaser’s site.<br />
30. Bank charges wherever applicable shall be paid<br />
by Purchaser/Contractor to their respective<br />
Bankers.<br />
31. Arbitration proceedings –<br />
1. Within India as per provisions of<br />
Arbitration and Conciliation Act 1996.<br />
2. Outside India – as per ICC Rules.<br />
32. Liquidated Damages - @ 0.5% per week for the<br />
delayed portion – maximum 10% of the<br />
contract value.<br />
33. Force Majeure conditions applicable?<br />
34. Acceptance of Fall clause.<br />
“The rates as per the charges of the Contract