LPSC (M)/PT/04/2013-14 (sl No 3) - ISRO
LPSC (M)/PT/04/2013-14 (sl No 3) - ISRO
LPSC (M)/PT/04/2013-14 (sl No 3) - ISRO
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
SPECIAL CONDITIONS<br />
Annexure-II<br />
1. Packing:<br />
The gas storage cylinder shall be filled with dry gaseous nitrogen at 0.2MPa<br />
pressure. All the openings in the gas storage and supply systems shall be<br />
suitably plugged to avoid contamination during transportation. The gas<br />
storage cylinders shall be packed to sea-worthy standard to avoid damage or<br />
loss during transportation to a tropical and humid destination. We shall not<br />
arrange for insurance of the consignment. Hence, supplier shall take<br />
adequate precaution to ensure safe transportation of the consignment.<br />
2. Consignment identification:<br />
The following details shall be legibly printed on each package of the<br />
consignments:<br />
• Package serial number<br />
• Package contents<br />
• Gross mass and dimensions of the packages<br />
• Purchase order number and date<br />
• Ultimate consignee<br />
• Port of destination<br />
3. Warranty:<br />
The gas storage cylinders shall be granted for satisfactory performance over<br />
a period of 12 months from the date of commissioning at our site or 18<br />
months from the date of delivery FOB <strong>No</strong>rth sea port, whichever is earlier.<br />
In the event any defect is observed during the aforesaid period due to faulty<br />
design, use of sub-standard material or poor workmanship, etc, supplier<br />
shall replace or rectify the same free of cost within reasonable period.<br />
Necessary warranty certificate shall be submitted.<br />
4. Documentation:<br />
The following documents, in English, in duplicate, shall be furnished at<br />
different stages specified thereupon:<br />
4.1 After placement of order:<br />
The following documents shall be made available within two months<br />
from the date of purchase order for design review and approval by the<br />
Third Party Inspection (TPI) agency and <strong>LPSC</strong> representatives for<br />
compliance with the requirements of the relevant design codes as<br />
specified in the purchase order and statutory regulations. Moreover, it is<br />
the supplier’s responsibility to submit the documents listed in Sections