08.03.2014 Views

LPSC (M)/PT/04/2013-14 (sl No 3) - ISRO

LPSC (M)/PT/04/2013-14 (sl No 3) - ISRO

LPSC (M)/PT/04/2013-14 (sl No 3) - ISRO

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

SPECIAL CONDITIONS<br />

Annexure-II<br />

1. Packing:<br />

The gas storage cylinder shall be filled with dry gaseous nitrogen at 0.2MPa<br />

pressure. All the openings in the gas storage and supply systems shall be<br />

suitably plugged to avoid contamination during transportation. The gas<br />

storage cylinders shall be packed to sea-worthy standard to avoid damage or<br />

loss during transportation to a tropical and humid destination. We shall not<br />

arrange for insurance of the consignment. Hence, supplier shall take<br />

adequate precaution to ensure safe transportation of the consignment.<br />

2. Consignment identification:<br />

The following details shall be legibly printed on each package of the<br />

consignments:<br />

• Package serial number<br />

• Package contents<br />

• Gross mass and dimensions of the packages<br />

• Purchase order number and date<br />

• Ultimate consignee<br />

• Port of destination<br />

3. Warranty:<br />

The gas storage cylinders shall be granted for satisfactory performance over<br />

a period of 12 months from the date of commissioning at our site or 18<br />

months from the date of delivery FOB <strong>No</strong>rth sea port, whichever is earlier.<br />

In the event any defect is observed during the aforesaid period due to faulty<br />

design, use of sub-standard material or poor workmanship, etc, supplier<br />

shall replace or rectify the same free of cost within reasonable period.<br />

Necessary warranty certificate shall be submitted.<br />

4. Documentation:<br />

The following documents, in English, in duplicate, shall be furnished at<br />

different stages specified thereupon:<br />

4.1 After placement of order:<br />

The following documents shall be made available within two months<br />

from the date of purchase order for design review and approval by the<br />

Third Party Inspection (TPI) agency and <strong>LPSC</strong> representatives for<br />

compliance with the requirements of the relevant design codes as<br />

specified in the purchase order and statutory regulations. Moreover, it is<br />

the supplier’s responsibility to submit the documents listed in Sections

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!