5.2 External surface: The external surface shall be subject to extra shot<br />

blasting to achieve surface condition as per “Preparation grade B Sa 2½”<br />

and surface finish to “15µm Ra”. The treatment shall be followed by<br />

painting with 2 coats of anti-corrosion paint of 70µm layer thickness.<br />

Surface finish of vessels after shot blasting shall be measured and details<br />

may be provided. The painting shall be French grey.<br />

6. End connections:<br />

Flanged ends on both sides as given in Drg <strong>No</strong>. S<strong>PT</strong>F/HPC/01/<strong>2013</strong><br />

7. Marking:<br />

The cylinder shall be stamped with permanent and clearly visible<br />

identification marks at an accessible location by steel stamps. The details<br />

such as water capacity, filling pressure at 15 0 C, hydraulic test pressure,<br />

material of construction, manufacturer’s serial number, date of inspection<br />

and inspector’s stamp shall be marked.<br />

8. Tests:<br />

The following tests shall be performed.<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

Material test for physical and chemical properties.<br />

Hardness test.<br />

Magnetic particle examination on the dished ends.<br />

Liquid penetrant examination on the bore of the dished ends.<br />

Internal and external surface examination.<br />

Tare mass measurement.<br />

Water capacity measurement.<br />

Hydraulic stretch test as per DOT 173.34 (the hydraulic test pressure<br />

shall be as per the code but not less than 1.5 times the filling<br />

pressure at 15 0 C)<br />

Ultrasonic test for flaw detection.<br />

Dimensional check.<br />

Wall thickness measurement by ultra sonic probe at identified points<br />

(The location of the measurement points shall be either permanently<br />

marked on the gas cylinders or sketched on a drawing with reference<br />

to a fixed point on the cylinder)<br />

Dye penetrant test at all the weld joints of the flanges.<br />

Hydro test of manifold assembly at 1.5 times of MAWP.