23.03.2014 Views

Customer Services Department - Kahramaa

Customer Services Department - Kahramaa

Customer Services Department - Kahramaa

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

e) 5 th Year: ______________<br />

Month Population Proj.<br />

Incremental<br />

Cumulative<br />

Exec.<br />

Phase<br />

Elect.Power<br />

MW<br />

Elect. Energy<br />

MWHr/Month<br />

Pot. Water<br />

MIGD<br />

Pot. Water<br />

MIG/Month<br />

Distillate<br />

MIGD<br />

Distillate<br />

MIG/Month<br />

Jan<br />

Feb<br />

Mar<br />

Apr<br />

May<br />

Jun<br />

Jul<br />

Aug<br />

Sep<br />

Oct<br />

Nov<br />

Dec<br />

17- Ground Reservoir Proposed:<br />

(a) Location, (Drawing in Soft & Hard Copies)<br />

(b) Capacity (Must be 2 Days Storage Capacity based on Daily Average Demand in MIGD)<br />

(c) Elevation & Height of the Ground Reservoir (Should be under ground or at Ground Level with a Height not exceeding 3Meters<br />

Above Ground Level) with map_____________________<br />

____________________________________________________________________________________<br />

18- Do you wish to apply to KAHRAMAA for services for your internal Network, If Yes Please Identify?<br />

Operations and Maintenance<br />

19- Captive Generation:<br />

Project Management<br />

Agreement to share cost of construction<br />

Do you want to exchange power and/or water with KAHRAMAA? If yes, please fill in the tables shown in items 15 &16<br />

above twice. Once with your demand as part of this application and The 2 nd time your proposed supply to <strong>Kahramaa</strong> and<br />

indicate modes , prices & any terms for each mode of supply and attach to a separate covering letter addressed to<br />

M/CSD and enclose with this form/ Application.<br />

Please provide in the following space information for internal or private generation capabilities if any. Minimum<br />

Information required is:<br />

- Number of generating units.<br />

- Generating unit ratings.<br />

- Type of generation technology (ST-GT-CC etc......).<br />

- Generation voltage/step up voltage.<br />

________________________________________________________________________________________________<br />

________________________________________________________________________________________________<br />

20- Attachments:<br />

Project Location Map (Hard & Electronic digital Auto Cad file Yes NO<br />

Copies) including proposed sub-station location with co-ordinates<br />

For Power. .<br />

Project Master Schedule Yes NO<br />

Annual Maintenance schedule Yes NO<br />

Proposed Location Map of the Ground Reservoir Yes NO<br />

(Hard & Electronic digital Auto Cad file copies)<br />

including proposed internal Reservoirs with Co-ordinates for Water<br />

Yearly Load Demand Curves Yes NO<br />

Building Permit Approval

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!