Customer Services Department - Kahramaa
Customer Services Department - Kahramaa
Customer Services Department - Kahramaa
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
e) 5 th Year: ______________<br />
Month Population Proj.<br />
Incremental<br />
Cumulative<br />
Exec.<br />
Phase<br />
Elect.Power<br />
MW<br />
Elect. Energy<br />
MWHr/Month<br />
Pot. Water<br />
MIGD<br />
Pot. Water<br />
MIG/Month<br />
Distillate<br />
MIGD<br />
Distillate<br />
MIG/Month<br />
Jan<br />
Feb<br />
Mar<br />
Apr<br />
May<br />
Jun<br />
Jul<br />
Aug<br />
Sep<br />
Oct<br />
Nov<br />
Dec<br />
17- Ground Reservoir Proposed:<br />
(a) Location, (Drawing in Soft & Hard Copies)<br />
(b) Capacity (Must be 2 Days Storage Capacity based on Daily Average Demand in MIGD)<br />
(c) Elevation & Height of the Ground Reservoir (Should be under ground or at Ground Level with a Height not exceeding 3Meters<br />
Above Ground Level) with map_____________________<br />
____________________________________________________________________________________<br />
18- Do you wish to apply to KAHRAMAA for services for your internal Network, If Yes Please Identify?<br />
Operations and Maintenance<br />
19- Captive Generation:<br />
Project Management<br />
Agreement to share cost of construction<br />
Do you want to exchange power and/or water with KAHRAMAA? If yes, please fill in the tables shown in items 15 &16<br />
above twice. Once with your demand as part of this application and The 2 nd time your proposed supply to <strong>Kahramaa</strong> and<br />
indicate modes , prices & any terms for each mode of supply and attach to a separate covering letter addressed to<br />
M/CSD and enclose with this form/ Application.<br />
Please provide in the following space information for internal or private generation capabilities if any. Minimum<br />
Information required is:<br />
- Number of generating units.<br />
- Generating unit ratings.<br />
- Type of generation technology (ST-GT-CC etc......).<br />
- Generation voltage/step up voltage.<br />
________________________________________________________________________________________________<br />
________________________________________________________________________________________________<br />
20- Attachments:<br />
Project Location Map (Hard & Electronic digital Auto Cad file Yes NO<br />
Copies) including proposed sub-station location with co-ordinates<br />
For Power. .<br />
Project Master Schedule Yes NO<br />
Annual Maintenance schedule Yes NO<br />
Proposed Location Map of the Ground Reservoir Yes NO<br />
(Hard & Electronic digital Auto Cad file copies)<br />
including proposed internal Reservoirs with Co-ordinates for Water<br />
Yearly Load Demand Curves Yes NO<br />
Building Permit Approval