<strong>4.0</strong> Cumulative Impacts<br />
Table <strong>4.0</strong>-3<br />
Cumulative Water Demand<br />
Development Area<br />
Surface Water<br />
Demand (afy)<br />
City Buildout Demand 54,757<br />
Proposed Action 3,609<br />
Sierra Vista Urban Reserves* 1,096<br />
Creekview Specific Plan 787<br />
Regional University 543<br />
Amoruso Specific Plan 1,210<br />
Placer Ranch Specific Plan 3,956<br />
Total Demand 65,958<br />
Total Water Contracts 66,000<br />
American River Allocation per WFA (Normal/Wet Years) 58,900<br />
American River Shortfall (afy) 7,058<br />
Source: City of Roseville 2010a; Mackay & Somps 2011<br />
*Includes Westbrook and Chan Property<br />
Because the pace and timing of regional developments in Placer County through 2030 is<br />
currently unknown, and because some of the above-referenced pending projects<br />
currently contemplated by the City’s General Plan may never come to fruition, the<br />
specific additional water supplies and the timing for obtaining them to serve potential<br />
future projects are uncertain. In addition to the City’s full use of its Water Forum<br />
Agreement allocation of surface water from the American River, it is likely that future<br />
water supply would come from one or more of the following sources: additional<br />
cooperative agreements between Water Forum Agreement water purveyors for surface<br />
water from the American River, mandatory conservation measures, and new surface<br />
water supplies from the <strong>Sacramento</strong> River.<br />
Furthermore, because the City’s surface water supply under the Water Forum Agreement<br />
is insufficient to meet all demands during drier water years, the City’s cumulative<br />
buildout demand (defined in this context to go beyond the current General Plan<br />
boundary) would require additional groundwater withdrawals in years when the surface<br />
supply is projected to be insufficient to fully meet the demand. Future urban growth<br />
would result in additional demands for surface and groundwater in the project area.<br />
Future water demands, as developed from community General Plan scenarios and other<br />
land use projections, are considered in the water supply operations model used for<br />
Central Valley Project (CVP) and State Water Project (SWP) for planning purposes.<br />
However, there are several large water supply projects that have not been assessed<br />
Impact Sciences, Inc. <strong>4.0</strong>-41 Sierra Vista Specific Plan Draft EIS<br />
USACE #200601050 July 2012