<strong>4.0</strong> Cumulative Impacts<br />

Table <strong>4.0</strong>-3<br />

Cumulative Water Demand<br />

Development Area<br />

Surface Water<br />

Demand (afy)<br />

City Buildout Demand 54,757<br />

Proposed Action 3,609<br />

Sierra Vista Urban Reserves* 1,096<br />

Creekview Specific Plan 787<br />

Regional University 543<br />

Amoruso Specific Plan 1,210<br />

Placer Ranch Specific Plan 3,956<br />

Total Demand 65,958<br />

Total Water Contracts 66,000<br />

American River Allocation per WFA (Normal/Wet Years) 58,900<br />

American River Shortfall (afy) 7,058<br />

Source: City of Roseville 2010a; Mackay & Somps 2011<br />

*Includes Westbrook and Chan Property<br />

Because the pace and timing of regional developments in Placer County through 2030 is<br />

currently unknown, and because some of the above-referenced pending projects<br />

currently contemplated by the City’s General Plan may never come to fruition, the<br />

specific additional water supplies and the timing for obtaining them to serve potential<br />

future projects are uncertain. In addition to the City’s full use of its Water Forum<br />

Agreement allocation of surface water from the American River, it is likely that future<br />

water supply would come from one or more of the following sources: additional<br />

cooperative agreements between Water Forum Agreement water purveyors for surface<br />

water from the American River, mandatory conservation measures, and new surface<br />

water supplies from the <strong>Sacramento</strong> River.<br />

Furthermore, because the City’s surface water supply under the Water Forum Agreement<br />

is insufficient to meet all demands during drier water years, the City’s cumulative<br />

buildout demand (defined in this context to go beyond the current General Plan<br />

boundary) would require additional groundwater withdrawals in years when the surface<br />

supply is projected to be insufficient to fully meet the demand. Future urban growth<br />

would result in additional demands for surface and groundwater in the project area.<br />

Future water demands, as developed from community General Plan scenarios and other<br />

land use projections, are considered in the water supply operations model used for<br />

Central Valley Project (CVP) and State Water Project (SWP) for planning purposes.<br />

However, there are several large water supply projects that have not been assessed<br />

Impact Sciences, Inc. <strong>4.0</strong>-41 Sierra Vista Specific Plan Draft EIS<br />

USACE #200601050 July 2012