Contents - Geoscience Australia
Contents - Geoscience Australia
Contents - Geoscience Australia
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
10. MINIMUM EQUIPMENT CONFIGURATION<br />
As above.<br />
11. ALTERNATIVE PROJECT DATES & TIMING CONSTRAINTS<br />
Actual timing of survey will be dependent on Access requirements and final funding limitations.<br />
12. NATURE AND SOURCE OF FUNDING<br />
Still being determined - It is anticipated that funding will involve contributions from GA (as part<br />
of the BHEI Project), PIRSA and the pmd*CRC. The local exploration industry will also be<br />
approached for possible involvement.<br />
The Institution proposing a project is responsible for the costs of the project, including mobilisation of<br />
the equipment and the costs of any ANSIR personnel used in support of the project. The Institution is<br />
required to provide a guarantee of Insurance for all equipment used in the project.<br />
13. SIGNATURE OF PRINCIPAL INVESTIGATOR<br />
..................................................... DATE: ..............................<br />
14. CONFIRMATION OF INSTITUTIONAL SUPPORT AND ACCEPTANCE OF<br />
THE STANDARD TERMS FOR ACCESS TO ANSIR EQUIPMENT<br />
..............................................…... DATE: ..............................<br />
POSITION HELD:<br />
12