09.04.2014 Views

Contents - Geoscience Australia

Contents - Geoscience Australia

Contents - Geoscience Australia

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

10. MINIMUM EQUIPMENT CONFIGURATION<br />

As above.<br />

11. ALTERNATIVE PROJECT DATES & TIMING CONSTRAINTS<br />

Actual timing of survey will be dependent on Access requirements and final funding limitations.<br />

12. NATURE AND SOURCE OF FUNDING<br />

Still being determined - It is anticipated that funding will involve contributions from GA (as part<br />

of the BHEI Project), PIRSA and the pmd*CRC. The local exploration industry will also be<br />

approached for possible involvement.<br />

The Institution proposing a project is responsible for the costs of the project, including mobilisation of<br />

the equipment and the costs of any ANSIR personnel used in support of the project. The Institution is<br />

required to provide a guarantee of Insurance for all equipment used in the project.<br />

13. SIGNATURE OF PRINCIPAL INVESTIGATOR<br />

..................................................... DATE: ..............................<br />

14. CONFIRMATION OF INSTITUTIONAL SUPPORT AND ACCEPTANCE OF<br />

THE STANDARD TERMS FOR ACCESS TO ANSIR EQUIPMENT<br />

..............................................…... DATE: ..............................<br />

POSITION HELD:<br />

12

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!