11.04.2014 Views

Advance Terminal Planning Study Program Criteria Document

Advance Terminal Planning Study Program Criteria Document

Advance Terminal Planning Study Program Criteria Document

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

KANSAS CITY INTERNATIONAL AIRPORT<br />

ADVANCE TERMINAL PLANNING STUDY<br />

PROGRAM CRITERIA DOCUMENT<br />

DRAFT<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

Plan facilities that meet a minimum Level of Service (LOS) C during peak<br />

hours<br />

Plan for flexibility to expand as demand changes<br />

Develop facilities that can adapt to a rigorous and changing security<br />

environment<br />

Design passenger-friendly flows and way-finding<br />

Minimize walking distances<br />

Develop operationally efficient gates for the airlines<br />

Provide efficient baggage handling and delivery<br />

Improve international facilities and their connection to domestic service<br />

Minimize the complexity of construction phasing<br />

Airside Goals:<br />

<br />

<br />

<br />

<br />

Maximize the uses of the new terminal site and airfield efficiencies<br />

Plan facilities that meet or exceed FAA design standards<br />

Accommodate aircraft that utilize the Airport, both now and in the future<br />

Provide efficient operational requirements such as vehicle service roads and<br />

uncongested ramp areas<br />

Regional and Landside Access Goals:<br />

<br />

<br />

<br />

<br />

<br />

<br />

Financial:<br />

<br />

<br />

<br />

<br />

<br />

Integrate the New <strong>Terminal</strong> into the existing roadway and regional<br />

transportation system with minimal interruption to on-going operations<br />

DRAFT<br />

Maximize on-airport parking<br />

Provide for convenient passenger access and transfers<br />

Minimize walking distances to the New <strong>Terminal</strong><br />

Provide a high LOS for rental car patrons<br />

Provide a high LOS at Arrivals and Departures curbsides<br />

Periodically evaluate a Rough Order of Magnitude to ensure the New <strong>Terminal</strong><br />

is a financially feasible plan<br />

Develop a cost-effective and realistically affordable plan<br />

Utilize common-use systems to minimize capital and operating costs<br />

Maximize non-aviation revenue opportunities including concessions and<br />

parking<br />

Maximize eligibility for FAA funding of proposed improvements<br />

Landrum & Brown Page 3<br />

April 2013

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!