18.04.2014 Views

CDP link - JnNURM

CDP link - JnNURM

CDP link - JnNURM

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Preparation of City development Plan (<strong>CDP</strong>) for Meerut<br />

in the state of Uttar Pradesh under JNNURM<br />

City Development Plan<br />

Final Report<br />

also lack in co-ordination among them. These factors are resulting in the falling levels of<br />

service delivery.<br />

The first Master Plan (1971-91) for the city targeted to achieve a balanced growth of the<br />

city, which got expired in 1996. After the expiry of the 1st Plan, a new master plan based<br />

on detailed survey and analysis of the city’s present problem and keeping in view the<br />

targeted population of 2.3 million for the year 2021, has been prepared.<br />

3.3. Significance of Meerut in NCR<br />

Meerut is a major part of NCR on the basis of its industrial and location base. NCR board<br />

is playing a major role in strengthening the financial aspect of the city by proving funds<br />

and loans for the development of the city. The main emphasis by NCR board for Meerut<br />

is on the proposal of Ghaziabad - Meerut Express way for improving the road<br />

connectivity of the city on the basis of importance of NCR. Further consideration of<br />

proposing IRBTS and RRTS for Meerut is under process for improving the connectivity<br />

and accessibility of Meerut city. Location of Meerut in NCR is shown in Figure 2.<br />

Figure 2: Location of Meerut in NCR<br />

6

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!