CONTRACT DOCUMENTS - The Municipality of Lambton Shores
CONTRACT DOCUMENTS - The Municipality of Lambton Shores
CONTRACT DOCUMENTS - The Municipality of Lambton Shores
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
Laboratories (UL), standards for safety. All features must be properly wrapped and<br />
secured in place while in transport to the site. Delivery <strong>of</strong> splash pad equipment shall be<br />
FOB destination, Arkona, ON. <strong>The</strong> <strong>Municipality</strong> <strong>of</strong> <strong>Lambton</strong> <strong>Shores</strong> reserves the right to<br />
reject or refuse and request replacement components if defective in any manner before or<br />
after installation.<br />
2.3 Accessibility<br />
<strong>The</strong> design and layout <strong>of</strong> the Splash Pad area must incorporate the principle <strong>of</strong> “inclusive”<br />
or “play for all”. All children including children with disabilities want to explore their<br />
environments, take risks and interact safely with others – children and adults. Adults with<br />
disabilities should able be able to interact with and assist children using the water play<br />
area. All facets <strong>of</strong> disabilities should be acknowledged in the design so that it provides a<br />
unique accessible water play area without limiting the enjoyment <strong>of</strong> all children.<br />
2.4 Warranty<br />
<strong>The</strong> equipment must include a minimum 2 year warranty for all water play equipment and<br />
a minimum 1 year warranty on all materials and construction performed by the<br />
Contractor. Proponents shall detail all applicable warranties available for the splash pad<br />
specifically outlining any inclusions/exclusions.<br />
2.5 Training<br />
One (1) scheduled on-site training session shall be included to provide municipal<br />
personnel instructions and demonstrations on the operation <strong>of</strong> the electrical system,<br />
controllers, seasonal opening/closing requirements and any site-specific operation<br />
procedures.<br />
2.6 Maintenance Data<br />
<strong>The</strong> successful Proponent shall submit a set <strong>of</strong> maintenance and operating instructions to<br />
the <strong>Municipality</strong>. <strong>The</strong> manuals shall include all equipment literature, parts list, operating<br />
instructions, maintenance instructions and all other pertinent data. <strong>The</strong> data shall provide<br />
enough instruction to permit Municipal staff to operate and maintain the mechanical and<br />
electrical systems.<br />
2.7 Layout and Design<br />
All proposed designs shall be included with your proposal. <strong>The</strong> layout and components<br />
shall ensure that there is no over spray beyond the boundaries <strong>of</strong> the drainage surface.<br />
2.8 Final Design<br />
<strong>The</strong> successful Proponent will be responsible for preparing final design drawings,<br />
obtaining final approvals and the necessary building and plumbing permits. <strong>The</strong><br />
successful Proponent shall provide a complete set <strong>of</strong> “as built” drawings in an acceptable<br />
digital format.<br />
2.9 Project Budget<br />
<strong>The</strong> approved budget for the Splash Pad is $100,000 (HST included). A portion <strong>of</strong><br />
installation the project budget will be completed through donated service. <strong>The</strong> successful<br />
proponent will be responsible to act as the General Contractor for this project, and be