26.04.2014 Views

CONTRACT DOCUMENTS - The Municipality of Lambton Shores

CONTRACT DOCUMENTS - The Municipality of Lambton Shores

CONTRACT DOCUMENTS - The Municipality of Lambton Shores

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Laboratories (UL), standards for safety. All features must be properly wrapped and<br />

secured in place while in transport to the site. Delivery <strong>of</strong> splash pad equipment shall be<br />

FOB destination, Arkona, ON. <strong>The</strong> <strong>Municipality</strong> <strong>of</strong> <strong>Lambton</strong> <strong>Shores</strong> reserves the right to<br />

reject or refuse and request replacement components if defective in any manner before or<br />

after installation.<br />

2.3 Accessibility<br />

<strong>The</strong> design and layout <strong>of</strong> the Splash Pad area must incorporate the principle <strong>of</strong> “inclusive”<br />

or “play for all”. All children including children with disabilities want to explore their<br />

environments, take risks and interact safely with others – children and adults. Adults with<br />

disabilities should able be able to interact with and assist children using the water play<br />

area. All facets <strong>of</strong> disabilities should be acknowledged in the design so that it provides a<br />

unique accessible water play area without limiting the enjoyment <strong>of</strong> all children.<br />

2.4 Warranty<br />

<strong>The</strong> equipment must include a minimum 2 year warranty for all water play equipment and<br />

a minimum 1 year warranty on all materials and construction performed by the<br />

Contractor. Proponents shall detail all applicable warranties available for the splash pad<br />

specifically outlining any inclusions/exclusions.<br />

2.5 Training<br />

One (1) scheduled on-site training session shall be included to provide municipal<br />

personnel instructions and demonstrations on the operation <strong>of</strong> the electrical system,<br />

controllers, seasonal opening/closing requirements and any site-specific operation<br />

procedures.<br />

2.6 Maintenance Data<br />

<strong>The</strong> successful Proponent shall submit a set <strong>of</strong> maintenance and operating instructions to<br />

the <strong>Municipality</strong>. <strong>The</strong> manuals shall include all equipment literature, parts list, operating<br />

instructions, maintenance instructions and all other pertinent data. <strong>The</strong> data shall provide<br />

enough instruction to permit Municipal staff to operate and maintain the mechanical and<br />

electrical systems.<br />

2.7 Layout and Design<br />

All proposed designs shall be included with your proposal. <strong>The</strong> layout and components<br />

shall ensure that there is no over spray beyond the boundaries <strong>of</strong> the drainage surface.<br />

2.8 Final Design<br />

<strong>The</strong> successful Proponent will be responsible for preparing final design drawings,<br />

obtaining final approvals and the necessary building and plumbing permits. <strong>The</strong><br />

successful Proponent shall provide a complete set <strong>of</strong> “as built” drawings in an acceptable<br />

digital format.<br />

2.9 Project Budget<br />

<strong>The</strong> approved budget for the Splash Pad is $100,000 (HST included). A portion <strong>of</strong><br />

installation the project budget will be completed through donated service. <strong>The</strong> successful<br />

proponent will be responsible to act as the General Contractor for this project, and be

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!