A S T O R I A<br />

G E N E R A T I N G<br />

Interconnection<br />

Potential interconnection point(s)<br />

The LCEP equipment will be electrically interconnecting to the grid via existing connections<br />

from the existing Astoria Facility Units. The specific proposed Point of Interconnection<br />

(POI) is Con Ed’s Astoria West Substation via the existing Astoria West 138 kV<br />

Substation Unit 3 (A3) feeders 24121/24122.<br />

Respondent’s assessments of why such interconnection point(s) are optimum, from both an economic<br />

and reliability perspective.<br />

LCEP optimizes existing interconnection points and the existing infrastructure in the<br />

Astoria Complex.<br />

Respondent’s assessment of whether the energy and/or capacity is deliverable to the bulk electric<br />

system.<br />

AGC has determined that with a relatively minor amount of system upgrades both the<br />

energy and capacity of the LCEP are deliverable to the electric grid.<br />

Technical<br />

Anticipated life of facility components<br />

The LCEP will be designed for a useful operating life of approximately 30 years.<br />

Quality and duration of original equipment manufacturer warranties<br />

Final manufacturer warranties have not yet been negotiated; however, nothing less<br />

than industry standard warranties will be acceptable.<br />

Construction<br />

Opportunities for New York-based manufacturing and/or assembly of equipment<br />

It is anticipated that construction and equipment will result in an expenditure of $800<br />

million to $1.0 billion, of which it is estimated more than 25% is expected to be spent in<br />

the local New York Metropolitan Area. An effort will be made to identify local competitive<br />

suppliers. The local expenditures are expected to generate tens of millions in additional<br />

secondary, economic activity in the area. A Cornell study estimated additional<br />

economic activity from a project by applying the output multiplier (1.66). While this<br />

multiplier has some limitations, it is reasonable to assume half again as much economic<br />

activity will be created by the project due to the local expenditures and could result in<br />

hundreds of millions of dollars in local economic activity.<br />

Labor expenditures for construction of the LCEP Equipment will be a substantial portion<br />

of the total cost of the project. The majority of this labor cost is expected to be paid<br />

to labor provided from the metropolitan area. An effort will be made to hire locally. In<br />

addition to local temporary jobs, the community will also benefit from additional direct<br />

non-payroll expenditures.<br />

Description of potential contractual arrangement(s) during construction<br />

This project will be conducted under an EPC arrangement.<br />

<strong>THE</strong> <strong>LUYSTER</strong> <strong>CREEK</strong> <strong>ENERGY</strong> <strong>PROJECT</strong> MAY 30, 2012<br />