Kangala Project Overview<br />

Key Figures<br />

Ownership 70.5% (BEE 29.5%)<br />

Resources<br />

Costs<br />

Total of 124Mt in situ Measured, Indicated<br />

and Inferred resource<br />

Opex – ZAR 90 / ROM tonne (A$13/t)<br />

Capex – ZAR 85m (A$12.5m)<br />

Railway<br />

Production Commence H1 <strong>2011</strong><br />

Highlights<br />

• Mining Right granted<br />

3.0Mtpa Full production H1 2012<br />

• Full Bankable feasibility underway to allow for full<br />

development to commence in H2 <strong>2011</strong><br />

• Commence ROM production in H1 <strong>2011</strong>, focussing on<br />

Domestic and Eskom grade thermal coal from a 48Mt<br />

Measured Resource<br />

• Entire resource is amenable to low cost open pit<br />

operation averaging less than 2:1 stripping ratio (Phase<br />

1 at 1.6:1)<br />

• Operational synergies being explored with Total (CAC)<br />

and Exxaro ‘s (JSE) Leeuwpan colliery<br />