Roodekop Project Overview<br />

Key Figures<br />

Ownership Earn in 50% (option to acquire 74%)<br />

Resources<br />

Production<br />

78Mt of in-situ Measured and Indicated<br />

resource – export quality<br />

Targeting 1.5Mtpa ROM with production<br />

development H2 <strong>2011</strong><br />

Railway<br />

Highlights<br />

• Lodged New order Mining Right application<br />

• Currently completing infill drilling campaign<br />

• 26.1Mt of Measured resources - including 16.5Mt in the<br />

open cast area defined at present<br />

• Western area amenable to open pit mining:<br />

• 35Mt of which 27.8Mt Measured and Indicated<br />

• 3.5:1 strip ratio<br />

• Yields 16.2Mt of RBCT and 8Mt of Eskom grade<br />

coal.<br />

• 7km south of New Clydesdale’s RBCT linked railway<br />

siding.<br />

• Toll-treatment / JV potential at nearby Exxaro’s New<br />

Clydesdale colliery.<br />

• Commencement of feasibility H2 <strong>2011</strong><br />

11