Roodekop Project Overview<br />
Key Figures<br />
Ownership Earn in 50% (option to acquire 74%)<br />
Resources<br />
Production<br />
78Mt of in-situ Measured and Indicated<br />
resource – export quality<br />
Targeting 1.5Mtpa ROM with production<br />
development H2 <strong>2011</strong><br />
Railway<br />
Highlights<br />
• Lodged New order Mining Right application<br />
• Currently completing infill drilling campaign<br />
• 26.1Mt of Measured resources - including 16.5Mt in the<br />
open cast area defined at present<br />
• Western area amenable to open pit mining:<br />
• 35Mt of which 27.8Mt Measured and Indicated<br />
• 3.5:1 strip ratio<br />
• Yields 16.2Mt of RBCT and 8Mt of Eskom grade<br />
coal.<br />
• 7km south of New Clydesdale’s RBCT linked railway<br />
siding.<br />
• Toll-treatment / JV potential at nearby Exxaro’s New<br />
Clydesdale colliery.<br />
• Commencement of feasibility H2 <strong>2011</strong><br />