EXECUTIVE SUMMARY<br />

The Electricity Generation Customer Choice and Competition Act<br />

mandates that the <strong>Pennsylvania</strong> <strong>Public</strong> <strong>Utility</strong> <strong>Commission</strong> (<strong>Commission</strong>) ensure<br />

that levels of reliability that existed prior to the restructuring of the electric utility<br />

industry continue in the new competitive markets. Act of December 3, 1996, P.L.<br />

802, No. 138, 66 Pa.C.S. Sec. 2801 et. seq.<br />

In response to this mandate, the <strong>Commission</strong> adopted reporting<br />

requirements designed to ensure the continuing safety, adequacy and reliability<br />

of the generation, transmission and distribution of electricity in the<br />

Commonwealth. 1 The <strong>Commission</strong> also established reliability benchmarks and<br />

standards to measure the performance of each electric distribution company<br />

(EDC). 2 Given the uncertainty of weather and other events that can affect reliability<br />

performance, the <strong>Commission</strong> has stated that EDCs should set goals to achieve<br />

benchmark performance in order to prepare for those times when unforeseen<br />

circumstances push the indices above the benchmark. 3 In recognition of these<br />

unforeseen circumstances, the <strong>Commission</strong> set the performance standard as the<br />

minimum level of EDC reliability performance. The standard is the level of<br />

performance beyond which the company must either justify its poor performance<br />

or provide information on the corrective measures it will take to improve<br />

performance. Performance that does not meet the standard for any reliability<br />

measure may be the threshold for triggering additional scrutiny and potential<br />

compliance enforcement actions.<br />

In 2005, two of the 11 EDCs failed to meet their rolling 12-month<br />

performance standards for the average duration of service outages per affected<br />

customer, while six EDCs performed better than the benchmark. Four EDCs<br />

failed to meet their rolling 12-month performance standards for the average<br />

frequency of service outages per customer, while five EDCs performed better<br />

than the benchmark. Five EDCs petitioned the <strong>Commission</strong> to amend their<br />

performance benchmarks and standards. The <strong>Commission</strong> adjusted<br />

benchmarks and standards for four of these EDCs. 4 As of the release of this<br />

document, the <strong>Commission</strong> has not yet issued a final decision on the remaining<br />

petition. 5<br />

1 Docket No. L-00970120; 52 Pa. Code §§ 57.191-57.197.<br />

2 Docket No. M-00991220.<br />

3 Docket No. M-00991220, page 25.<br />

4 Docket No. M-00991220F0003 and P-00042115.<br />

5 Docket No. M-00991220F0002.