Reliability Report -- 1999 - Pennsylvania Public Utility Commission
Reliability Report -- 1999 - Pennsylvania Public Utility Commission
Reliability Report -- 1999 - Pennsylvania Public Utility Commission
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
14.0% of total incidents, 18.5% of customers affected and 28.5% of interruption<br />
minutes.<br />
<strong>Pennsylvania</strong> Electric Company<br />
2005 Outage Causes<br />
Wind<br />
Vehicle<br />
Vandalism<br />
Unknown<br />
UG Dig-Up<br />
Trees - Preventable<br />
Trees - Not Preventable<br />
Switching Error<br />
Previous Lightning<br />
Overload<br />
Other <strong>Utility</strong> - Non-Electric<br />
Other Electric <strong>Utility</strong><br />
Object Contact With Line<br />
Line Failure<br />
Lightning<br />
Ice<br />
Human Error - Non-Company<br />
Human Error - Company<br />
Forced Outage<br />
Fire<br />
Equipment Failure<br />
Customer Equipment<br />
Contamination<br />
Bird<br />
Animal<br />
Customer Minutes Interrupted<br />
Customers Affected<br />
Number of Incidents<br />
0% 5% 10% 15% 20% 25% 30% 35%<br />
Percent of Outages<br />
<strong>Pennsylvania</strong> Power Company<br />
Penn Power’s reliability performance summary was filed as a joint report<br />
submitted on behalf of the three <strong>Pennsylvania</strong> operating companies of<br />
FirstEnergy: Met-Ed, Penelec and Penn Power.<br />
On May 26, 2004, FirstEnergy filed a Petition for the Amendment of<br />
Benchmarks. 25 On February 17, 2006, the <strong>Commission</strong> entered an Order<br />
modifying the benchmarks and standards for the three FirstEnergy companies.<br />
Penn Power’s CAIDI benchmark was increased from 92 minutes to 101 minutes;<br />
the SAIFI benchmark was increased from 1.02 interruptions to 1.12 interruptions;<br />
and the SAIDI benchmark was increased from 94 minutes to 113 minutes.<br />
25 Docket No. P-00042115.<br />
26<br />
<strong>Pennsylvania</strong> <strong>Public</strong> <strong>Utility</strong> <strong>Commission</strong>