1<br />

REPUBLIC OF RWANDA<br />

MINISTRY OF INFRASTRUCTURE<br />

WITH THE SUPPORT OF THE<br />

MINISTRY OF FINANCE AND ECONOMIC PLANNING<br />

(MINECOFIN)<br />

P.O. BOX 158 KIGALI<br />

Tel: (250) 577994; Fax (250) 574785<br />

AND<br />

HUMAN INSTITUTIONAL DEVELOPMENT AGENCY (HIDA)<br />

Credit No: 3955-RW<br />

CONSULTANCY SERVICES TO SUPPORT MINECOFIN IN TO GENERATE A<br />

FULLY COSTED NEEDS ASSESSMENT OF THE INFRASTRUCTURE SECTOR<br />

FOR THE DESIGN AND IMPLEMENTATION OF AN INTEGRATED M&E<br />

FRAMEWORK ACROSS SECTORS IN LINE WITH THE ECONOMIC<br />

DEVELOPMENT AND POVERTY REDUCTION STRATEGY (EDPRS).<br />

END OF MISSION REPORT<br />

VOLUME II: LOGFRAME FOR MININFRA INTERVENTIONS IN LINE WITH<br />

EDPRS <strong>2007</strong>-2011<br />

by Prof. Dr. Ir. Pascal-Firmin NDIMIRA<br />

International Monitoring/Evaluation Consultant<br />

Kigali, 14 April <strong>2007</strong>


2<br />

TABLE OF CONTENTS<br />

TABLE OF CONTENTS ---------------------------------------------------------------------------------------------------------------- 2<br />

TABLE 0: ANALYSIS OF THE STRUCTURE OF MININFRA EDPRS LOGFRAME -------------------------------------- 3<br />

TABLE 0 – CONTINUED: SUB-SECTOR COMPONENTS --------------------------------------------------------------------- 4<br />

TABLE 1: GLOBAL LOGFRAME FOR MININFRA INTERVENTIONS OVER EDPRS PERIOD <strong>2007</strong>-2011 –<br />

GLOBAL OBJECTIVE------------------------------------------------------------------------------------------------------------------- 5<br />

TABLE 2: GLOBAL LOGFRAME FOR MININFRA INTERVENTIONS OVER EDPRS PERIOD <strong>2007</strong>-2011<br />

DEVELOPMENT OBJECTIVES ------------------------------------------------------------------------------------------------------ 6<br />

TABLE 3: LOGFRAME FOR TRANSPORT SUB-SECTOR OVER EDPRS PERIOD <strong>2007</strong>-2011 ---------------------- 7<br />

TABLE 4: LOGFRAME FOR ENERGY SUB-SECTOR OVER EDPRS PERIOD <strong>2007</strong>- 2011 ------------------------- 19<br />

TABLE 5: LOGFRAME FOR HOUSING AND URBANISM SUB-SECTOR OVER EDPRS PERIOD <strong>2007</strong>-2011 -- 27<br />

TABLE 6: LOGFRAME FOR <strong>ICT</strong> SUB-SECTOR OVER EDPRS PERIOD <strong>2007</strong>-2011 --------------------------------- 34<br />

TABLE 7: LOGFRAME FOR METEOROLOGY SUB-SECTOR OVER EDPRS PERIOD <strong>2007</strong>-2011 --------------- 38<br />

APPENDIX 8: REACTION TO THE COMMENTS FROM MINECOFIN ---------------------------------------------------- 41<br />

APPENDIX 9: REACTION FROM MININFRA TO THE COMMENTS FROM EU ON TRANSPORT LOGFRAME 43<br />

APPENDIX 10: FIRST DRAFT OF THE PROVISIONAL VERSION OF THE <strong>ICT</strong> LOGFRAME– INTEGRATING<br />

THE TEN 2010-NICI PILLARS - ---------------------------------------------------------------------------------------------------- 44<br />

A. THE FIRST PART OF INITIAL VERSION WHICH REMAINS UNCHANGED ----------------------------------------- 45<br />

B. THE LAST PART OF <strong>ICT</strong> INITIAL LOGFRAME WHICH CHANGED --------------------------------------------------- 46


Table 0: ANALYSIS OF THE STRUCTURE OF MININFRA EDPRS LOGFRAME<br />

3<br />

Global objective in line with EDPRS<br />

CONTRIBUTE TO SUSTAINABLE ECONOMIC DEVELOPMENT<br />

AND POVERTY REDUCTION THROUGH THE DEVELOPMENT<br />

OF INFRASTRUCTURE AND PROMOTION OF RELATED<br />

SERVICES IN RWANDA<br />

Global objective / Devpt in relation<br />

With MININFRA Sector<br />

ENSURE DEVELOPMENT AND PERFORMANCE OF<br />

INFRASTRUCTURE AND RELATED SERVICES IN RWANDA<br />

Specific objectives<br />

and sector strategies<br />

Ensure legal and<br />

regulatory institutional<br />

framework<br />

Increase the volume<br />

of infrastructure and<br />

equipment<br />

Provide<br />

quality<br />

services<br />

Reduce/co<br />

ntrol cost<br />

Increase<br />

accessibility<br />

Ensure<br />

infrastructure<br />

sustainability<br />

Ensure the security<br />

of infrastructure<br />

users<br />

TRANSPORT<br />

<strong>ICT</strong><br />

ENERGY<br />

HOUSING AND CITY<br />

PLANNING<br />

METEOROLOGY


4<br />

TABLE 0 – CONTINUED: SUB-SECTOR COMPONENTS<br />

Sub-sector specific objectives according to<br />

which the outputs were defined<br />

TRANSPORT<br />

Capacity building<br />

Opening up<br />

Dvpt and maintenance of<br />

Inland Road Network<br />

Regulation and security<br />

apparatuses<br />

<strong>ICT</strong><br />

In Education<br />

Human Capacity Dvt<br />

Infrastr, Equipt&content<br />

Economic Dvt<br />

Social Development<br />

ENERGY<br />

Infrastructure<br />

Capacity<br />

Security and quality of<br />

supplies<br />

Diversification of<br />

sources of energy<br />

HOUSING AND<br />

CITY<br />

PLANNING<br />

Property Development<br />

Plot Production<br />

Financing System<br />

METEO<br />

Development<br />

and Equipment<br />

Planning<br />

D&E<br />

Infrastructure<br />

processing and<br />

planning<br />

Formation<br />

Transport cost.<br />

Cross-cutting issues: AIDS/<br />

Environment<br />

e-Govt and e-Governance<br />

Private Sector Development<br />

Rural and Community access<br />

Cost control<br />

Urban and rural access<br />

to energy<br />

Sustainability and<br />

maintenance<br />

MDP and SDP<br />

(See NB in the footnote)<br />

Imidugudu<br />

Improvement of<br />

informal areas<br />

Rehabilitation of<br />

150 meteo<br />

stations<br />

Promotion meteo<br />

services<br />

Legal, Regulatory, Institutional<br />

Provisions and Standards<br />

Cross-cutting issues:<br />

AIDS/HIV Environment<br />

Maintenance<br />

National Security, Law and Order<br />

NB.MDP: Master Development Plan – SDP: Simplified Development Plan


5<br />

TABLE 1: GLOBAL LOGFRAME FOR MININFRA INTERVENTIONS OVER EDPRS PERIOD <strong>2007</strong>-2011 – Global objective<br />

Logic of intervention Objectively Verifiable Indicator Source of verification Assumptions (Risks)<br />

Global objective compared to<br />

EDPRS objectives: The<br />

infrastructure sector has<br />

contributed to sustainable<br />

economic development and<br />

poverty reduction in Rwanda<br />

over the period <strong>2007</strong>-2001 1.<br />

GO : 5 OVI<br />

• GO1. Infrastructure development has contributed at least at<br />

the rate of 20 % 1 to the average annual growth of GDP fixed at<br />

least at 7% over the period <strong>2007</strong> and 2011 (7 % between 2001<br />

and 2006)<br />

• GO2. Private operators’ access to infrastructure and<br />

associated services has enabled the private sector to<br />

increase its contribution to GDP from X% to 10% between<br />

<strong>2007</strong> and 2011 (forecast of 3.4% to 7% over the period 2001 to<br />

2006)<br />

BNR<br />

NIS<br />

FRSP<br />

RIEPA<br />

MININFRA<br />

• GO3. Infrastructure development enabled to address the<br />

growth of non-traditional exportations which have increased<br />

by 20% per year (forecast of at least 20% per year over the<br />

period 2001 to 2006).<br />

MINICOM<br />

MININFRA<br />

• GO4. Infrastructure development has contributed 20% to the<br />

increase in employment over the period 2001 to 2006 2<br />

MINIFOTRA<br />

MININFRA<br />

• GO5. Infrastructure development has contributed by 20% to<br />

the decrease in the percentage of the populations living<br />

below the poverty line over the period <strong>2007</strong> to 2011 3<br />

NIS<br />

MININFRA<br />

1 The projected contribution of each of the sub-sectors to GDP, on the basis of the data from BNR of 2004, is at least 10 % for Transport and <strong>ICT</strong> (8.1% in 2004); 1% for Energy and<br />

water (0.25% in 2004); 10.5% for Housing and City Planning (10.5% for construction and public works in 2004) and X% for Me<br />

teo (not specified for 2004).<br />

2 For MININFRA contribution to job creation, the same rate as the contribution to GDP (20%).<br />

3 For MININFRA contribution to the increase in the poverty level, the same rate as the contribution to GDP (20%).


TABLE 2: GLOBAL LOGFRAME FOR MININFRA INTERVENTIONS OVER EDPRS PERIOD <strong>2007</strong>-2011 Development objectives<br />

6<br />

Logic of intervention Objectively Verifiable Indicator Source of verification Assumptions (Risks)<br />

MININFRA Development<br />

Objective: The volume and<br />

performance of the infrastructure<br />

sector services in Rwanda have<br />

improved over the period <strong>2007</strong> to<br />

2011.<br />

(N.B. Values associated to these OVI<br />

are from the latest version of EDPRS<br />

Log-Frame for the Transport sector,<br />

Mininfra, Dec 2006, p.1)<br />

DO : 6 IOV<br />

• DO1. Infrastructure capacity has increased at least<br />

by 50% over the period <strong>2007</strong> to 2011 (including) 4 .<br />

• DO2. The volume of infrastructure sector services<br />

in Rwanda has increased at least by 50% over the<br />

period <strong>2007</strong> to 2011 on all segments of transport<br />

MININFRA<br />

MININFRA<br />

• DO3. The number of new infrastructure sector MININFRA<br />

service beneficiaries/users in Rwanda over the<br />

period 2006 to 2011 has reached at least 50% of<br />

• DO4. The cost of infrastructure services in<br />

Rwanda measured through its part in the<br />

consumption cost index has decreased at least by<br />

10% over the period <strong>2007</strong> to 2011<br />

• DO5. The percentage of beneficiaries who are<br />

satisfied with the improvement of the quality of<br />

infrastructure sector services is at least 80% 6<br />

over the period <strong>2007</strong> to 2011.<br />

• OD6. The number of accidents resulting from the<br />

use of infrastructure in Rwanda has decreased by<br />

half (50%) over the period <strong>2007</strong> to 2011.<br />

MININFRA<br />

MININFRA<br />

MININFRA<br />

4 At least 10 % for Transport; 5% for Energy; 10.5% for Housing and City Planning; 16% for <strong>ICT</strong> ; and X% for Meteorology<br />

5 The number of new beneficiaries/users by infrastructure sub-sector in Rwanda over the period shall be determined by the baseline study expected at the end of <strong>2007</strong>.<br />

MININFRA set the minimal objective of improvement of the volume of services and the number of beneficiaries at least to 50% over EDPRS period. This requires the<br />

organization of a baseline study expected at the end of <strong>2007</strong>.<br />

6 The principle is that MININFRA sets a minimal level of 80% of satisfaction of infrastructure sector service customers/beneficiaries.


7<br />

TABLE 3: LOGFRAME FOR TRANSPORT SUB-SECTOR OVER EDPRS PERIOD <strong>2007</strong>-2011<br />

Logic of intervention Objectively Verifiable Indicators Source of verification Assumptions(Risks)<br />

TRANSPORT: 2 GO OVI / 7 DO OVI<br />

GOAL / IMPACT / WIDER OBJECTIVE /<br />

GLOBAL OBJECTIVE<br />

Under transport sector contributed to the<br />

durable economic growth and the<br />

reduction of poverty in Rwanda over the<br />

period <strong>2007</strong> to 2011.<br />

PURPOSE / OUTCOME/<br />

DEVELOPMENT OBJECTIVE<br />

The Maintenance, Improvement and<br />

Development of Good Quality, Cost<br />

Effective Transport Infrastructure and<br />

Services in a Safe and Environmentally<br />

Sensitive manor over the period <strong>2007</strong> to<br />

2011.<br />

• OG1. The development and operation of Transport<br />

Infrastructures and Services contributes at least to a total value<br />

of 10% at the average growth rate annual of GDP fixed at a<br />

minimum 7.2% over the period <strong>2007</strong> and 2011.<br />

• OG2. The number of created jobs each year by the transport<br />

sector is at least 20 % over the period <strong>2007</strong> to 2011.<br />

• OD1-R1. Enhanced Operational Capacity of MININFRA to provide &<br />

maintain cost efficient Transport Infrastructure in place over the period<br />

<strong>2007</strong> – 2011. (Could be numbered as OD1-R1a).<br />

• OD2-R2. A coherent and integrated strategy to improve international<br />

transport links adopted, feasibility studies completed and<br />

infrastructure development projects initiated by 2011. (Could be<br />

numbered as OD1-R1b).<br />

• OD3-R3. The Classified Road network rehabilitated and maintained<br />

over the period <strong>2007</strong>-2011 so that 31% is in good condition by 2011.<br />

• OD4-R4. Transport safety policy adopted and projects and<br />

regulations to improve the safety of transport of people and goods<br />

implemented over the period <strong>2007</strong>-2011 (i.e. resulting in reduction of<br />

road traffic accidents by 15% by 2011).<br />

• OD5-R5. The cost of transport of passengers and goods nationally<br />

and internationally reduced by 10% in real terms over the period<br />

<strong>2007</strong>-2011.<br />

• OD6-R6. A set of appropriated measures (3 kinds of measures) are<br />

in place so that the delivery of transport infrastructure and services<br />

has contributed to the fight against the Spread of HIV/AIDS,<br />

Environmental Degradation, and Gender Inequality over the period<br />

<strong>2007</strong>-2011.<br />

• NIS statistical database<br />

• BNR Annual Report<br />

• Baseline for actual<br />

employment status<br />

• Mininfra reports 7<br />

• NIS statistical database<br />

• Mininfra Database<br />

• NIS statistical database<br />

• Mininfra Databases<br />

• Mininfra Databases<br />

District reports; and<br />

Mininfra Database<br />

• NIS statistical database<br />

• BNR Annual Report<br />

• NIS statistical database<br />

• Baseline survey<br />

• Mininfra Database<br />

7 For jobs, Mininfra will have to institute appropriate reports.


8<br />

Logic of intervention Objectively Verifiable Indicators Source of verification Assumptions (Rissks)<br />

Specific objectives by subsector<br />

and implementation or<br />

result indicators<br />

1. Sector Transport: The<br />

infrastructures and the<br />

services of transport were<br />

developed and promoted<br />

thanks to the design and the<br />

implementation of the Master<br />

line of adequate Transport<br />

over the period <strong>2007</strong>-2011.<br />

R11<br />

Operational Capacity of<br />

MININFRA to provide & maintain<br />

improved<br />

Transport<br />

Infrastructure enhanced over the<br />

period <strong>2007</strong> - 2011<br />

R12<br />

A coherent and integrated<br />

strategy to improve international<br />

transport links adopted,<br />

feasibility studies completed and<br />

infrastructure development<br />

projects initiated by 2011<br />

TRANSPORT: 10 OVI<br />

At least 80% of the forecasts contained in the Directing<br />

Diagram of the Transport developed in <strong>2007</strong> were<br />

implemented from here 2011 so that the annual growth rate<br />

in this sector is of X% at least and in order to increase the<br />

capacities of under sector transport of at least 50%; to<br />

reduce the road cost of transport by at least 30% and to<br />

reduce the frequency of the accidents on the roads of X%.<br />

• 100 MININFRA, District and Transport Agency staff with<br />

relevant masters degrees by 2011<br />

• Adoption of a Road Maintenance Strategy by 2008<br />

• 4 performance agreements with Transport Agencies in<br />

place and being respected by 2009<br />

• At least 4 analytical systems (including sector policy<br />

formulation, sector statistics, planning and M&E) have<br />

established within MININFRA during period <strong>2007</strong>-2011.<br />

• Adoption of a Transport Master-plan for Rwanda by 2009.<br />

• Five (5) international transport infrastructure project<br />

feasibility studies completed and civil works initiated over the<br />

period <strong>2007</strong>-2011 (Regional airports rehabilitated/upgraded;<br />

the new airport built at Bugesera and is operational from the<br />

year 2012 ; preparatory work in order to facilitate extension<br />

of the railroad from Isaka to Kigali to be built built and<br />

operational from the year 2014; preparatory work in order to<br />

facilitate a dry port on the Northern and central corridors<br />

(Isaka, Kampala) to be built and operational as the year<br />

2015. Extension of the oil pipeline from Kampala to Kigali).<br />

• Three lake and river transport development projects<br />

completed (2) or initiated (1) over the period <strong>2007</strong>-2011 (6<br />

quays of accosting arranged on the Lake Kivu and other<br />

lakes from 2008 the year 2010 ; A shipyard built on the Lake<br />

Kivu by 2010; Akagera river made navigable by 2015).<br />

• MININFRA and Districts staff<br />

records<br />

• Mininfra reports<br />

• Mininfra reports<br />

• Mininfra reports<br />

• Mininfra records<br />

• Feasibility study & design reports and<br />

contract documents<br />

• Signed contracts for construction<br />

• Bi-lateral / Regional agreements for<br />

construction<br />

• Project progress reports<br />

• Enough Candidates of required<br />

academic level available and willing<br />

to apply,<br />

• Operational capacity of FER<br />

enhanced<br />

• Govt passing of Road Agency statute<br />

• Regional co-operation<br />

• Donor support for major infrastructure<br />

projects continues


9<br />

Logic of intervention Objectively verifiable indicator Source of verification Assumptions (Risks)<br />

Specific objectives by subsector<br />

and implementation or<br />

result indicator<br />

R13<br />

The Classified Road network<br />

rehabilitated and maintained<br />

over the period <strong>2007</strong>-2011 so<br />

that 31% is in good condition by<br />

2011.<br />

R14<br />

A transport safety policy adopted<br />

and projects and regulations to<br />

improve the safety of transport of<br />

people and goods implemented<br />

over the period <strong>2007</strong>-2011.<br />

TRANSPORT : 10 OVI<br />

• 501Km of National Roads rehabilitated;<br />

• All National Roads in Good or Fair Condition maintained over<br />

the period <strong>2007</strong>-2011.<br />

• 415 km of District roads rehabilitated;<br />

• All District Roads in Good or Fair Condition maintained over<br />

the period <strong>2007</strong>-2011.<br />

• Transport Safety policy adopted by 2008<br />

• 3 Transport Safety projects completed over the period <strong>2007</strong>-<br />

2011<br />

• 3 articles of Transport Safety legislation enacted over the<br />

period <strong>2007</strong>-2011.<br />

• Media campaigns on road safety issues (Radio, television<br />

and newspaper) carried out annually over the period <strong>2007</strong>-<br />

2011.<br />

• Design reports and contract<br />

documents<br />

• Signed contracts for construction<br />

• Consultants Progress and Project<br />

Completion reports<br />

• Districts Progress and Project<br />

Completion reports<br />

• District Road Condition Survey<br />

• Annual National road condition<br />

survey<br />

• Transport Safety policy document<br />

• CAA annual report/statistics<br />

• Vehicle Testing Agency annual report<br />

• Road safety study report, design and<br />

contract documents.<br />

• Signed road improvement contracts<br />

• Contract progress and completion<br />

reports<br />

• Road fund sources increase.<br />

• Continued development partner<br />

support.<br />

• Continued economic growth.<br />

• Increased operational capacity of<br />

MININFRA / Road Agency<br />

• Increased operational capacity of<br />

District Infrastructure teams<br />

• Vehicle Testing Agency is operational<br />

• Civil aviation regulations upgrate and<br />

RCAA staff capacity enhanced


10<br />

Logic of intervention Objectively verifiable Indicator Source of verification Assumptions (Risks)<br />

Specific objectives by subsector<br />

and implementation or<br />

result indicator<br />

R15<br />

The cost of transport of<br />

passengers and goods nationally<br />

and internationally reduced by<br />

10% in real terms over the<br />

period <strong>2007</strong>-2011.<br />

R16<br />

A set of appropriated measures<br />

(3 kinds of measures) are in<br />

place so that the delivery of<br />

transport infrastructure and<br />

services has contributed to the<br />

fight against the Spread of<br />

HIV/AIDS, Environmental<br />

Degradation, and Gender<br />

Inequality over the period <strong>2007</strong>-<br />

2011.<br />

TRANSPORT : 10 OVI<br />

• Border and customs procedures simplified and standardized<br />

regionally.<br />

• Time of transit for goods and passengers reduced by 10% on<br />

National Road corridors.<br />

• The cost of container transport from Kigali to Mombassa<br />

reduced by 10% in real terms by 2011<br />

• The cost of a bus ticket from Kigali to Kampala reduced by<br />

10% in real terms by 2011<br />

• 4 service and rest areas with devices of fight against the<br />

AIDS were arranged on the corridors of the truck-drivers<br />

over the period <strong>2007</strong>-2011.<br />

• 5 clauses introduced to contract documents for protection of<br />

the environment, gender quality, HIV/AIDS prevention and<br />

employment creation.<br />

• At least 0.5 % of total amount contract dedicated to<br />

HIV/AIDS, Gender and environmental protection<br />

• National statistical report,<br />

• Corridor’s Agencies report,<br />

• Ports Authorities reports,<br />

• SSATP survey report<br />

• MININFRA standard construction<br />

contract<br />

• Signed contract documents<br />

• Contract progress and completion<br />

reports,<br />

• Corridor’s Agencies report<br />

• Survey to the international driver’s<br />

association<br />

• Regional co-operation,<br />

• Transport policy harmonized in the<br />

region<br />

• International Roads in good<br />

conditions<br />

• Govt support for customs reform and<br />

one stop border operational<br />

• Clauses adopted and enforced<br />

• Effective supervision of contracts<br />

• Fund of Construction of 4 services<br />

and rest areas on corridor’s roads


11<br />

OVI<br />

number<br />

GO1.<br />

GO2.<br />

OVI formulation OVI description Source of information Responsible<br />

for data<br />

collection<br />

The development and operation of Transport<br />

Infrastructures and Services contributes at least<br />

to a total value of 10% at the average growth rate<br />

annual of GDP fixed at a minimum 7.2% over the<br />

period <strong>2007</strong> and 2011.<br />

The number of created jobs each year by the<br />

transport sector is at least 20 % over the period<br />

<strong>2007</strong> to 2011.<br />

Ratio between total<br />

added value from<br />

Transport sub sector<br />

and total GDP in<br />

percentage.<br />

Number of employees<br />

in public or private<br />

enterprises operating in<br />

Transport Sub sector<br />

BNR annual reports<br />

BNR<br />

NIS<br />

Frequency of<br />

data collection<br />

Baseline<br />

value in<br />

2006<br />

(except<br />

other given<br />

specific<br />

indication)<br />

Target value<br />

for 2011<br />

(except other<br />

given<br />

specific<br />

indication)<br />

Comment on<br />

availability of baseline<br />

value<br />

Annual 8.1 % 10 % • Data annually provided by<br />

BNR<br />

• Assumption that<br />

Transport sub sector<br />

added value should<br />

increase at least by 7%<br />

per year.<br />

MININFRA MININFRA Annual ? 20 % • Such kind of data<br />

collection has to be<br />

established in MINIFRA<br />

eventually in cooperation<br />

with MINEFOTRA


12<br />

OVI<br />

number<br />

DO1-R1.<br />

DO2-R2.<br />

DO3-R3.<br />

DO4-R4.<br />

DO5-R5.<br />

DO6-R6.<br />

OVI formulation OVI description Source of information Responsible<br />

for data<br />

collection<br />

Enhanced Operational Capacity of MININFRA to<br />

provide & maintain cost efficient Transport<br />

Infrastructure in place over the period <strong>2007</strong> – 2011.<br />

(Could be numbered as OD1-R1a).<br />

A coherent and integrated strategy to improve<br />

international transport links adopted, feasibility<br />

studies completed and infrastructure development<br />

projects initiated by 2011. (Could be numbered as<br />

OD1-R1b).<br />

The Classified Road network rehabilitated and<br />

maintained over the period <strong>2007</strong>-2011 so that 31% is<br />

in good condition by 2011.<br />

Transport safety policy adopted and projects and<br />

regulations to improve the safety of transport of<br />

people and goods implemented over the period<br />

<strong>2007</strong>-2011 (i.e. resulting in reduction of road traffic<br />

accidents by 15% by 2011).<br />

The cost of transport of passengers and goods<br />

nationally and internationally reduced by 10% in real<br />

terms over the period <strong>2007</strong>-2011.<br />

A set of appropriated measures (3 kinds of<br />

measures) are in place so that the delivery of<br />

transport infrastructure and services has contributed<br />

to the fight against the Spread of HIV/AIDS,<br />

Environmental Degradation, and Gender Inequality<br />

over the period <strong>2007</strong>-2011.<br />

Summarized Boolean<br />

indicator tracking if yes or<br />

not capacity building is in<br />

place over the period<br />

<strong>2007</strong> – 2011<br />

Summarized Boolean<br />

indicator tracking if yes or<br />

not appropriate strategy<br />

has been defined and<br />

implemented over the<br />

period <strong>2007</strong> – 2011<br />

Ratio between length of<br />

classified road network in<br />

good condition and the<br />

total length of classified<br />

road network.<br />

Difference between the<br />

number of accidents in<br />

2011 minus the number of<br />

accidents in 2006<br />

multiplied by 100 divided<br />

by the number of accidents<br />

in 2006.<br />

Difference between the<br />

cost of transport of<br />

passengers and goods<br />

nationally<br />

and<br />

internationally in 2006<br />

minus same cost in 2011<br />

multiplied by 100 divided<br />

by cost in 2006 in percent.<br />

Number of appropriated<br />

measures in place<br />

Frequency of<br />

data collection<br />

Baseline<br />

value in<br />

2006<br />

(except<br />

other given<br />

specific<br />

indication)<br />

Target value<br />

for 2011<br />

(except other<br />

given<br />

specific<br />

indication )<br />

• Mininfra reports MININFRA Annually Na Boolean<br />

• NIS Database<br />

• Mininfra Database<br />

NIS<br />

MININFRA<br />

Na<br />

(Yes or No)<br />

Boolean<br />

(Yes or No)<br />

Comment on<br />

availability of baseline<br />

value<br />

• Mininfra Database MININFRA Annually ? 31% Baseline study should be<br />

commissioned by end <strong>2007</strong><br />

• Districts reports<br />

• Mininfra Database<br />

DISTR<strong>ICT</strong>S<br />

MININFRA<br />

? 15% Need to specify the number<br />

of accidents in 2006<br />

through baseline study.<br />

• Mininfra Database MININFRA Annually ? 10% Need to specify the cost<br />

of transport of passengers<br />

and goods nationally and<br />

internationally in 2006<br />

through baseline study.<br />

• Mininfra Database MININFRA Annually NA 3


13<br />

OVI<br />

number<br />

OVI formulation OVI description Source of information Responsible for<br />

data collection<br />

R111 100 MININFRA, District and Transport<br />

Agency staff with relevant masters’ degrees<br />

by 2011.<br />

R112<br />

R113<br />

R114<br />

Adoption of a Road Maintenance Strategy by<br />

2008<br />

4 performance agreements with Transport<br />

Agencies in place and being respected by<br />

2009<br />

At least 4 analytical systems (including sector<br />

policy formulation, sector statistics, planning<br />

and M&E) have established within MININFRA<br />

during period <strong>2007</strong>-2011<br />

Number of staff members trained and<br />

graduated under masters degree<br />

program by 2011<br />

Summarized Boolean indicator tracking<br />

if yes or not Road Maintenance Strategy<br />

has been defined and adopted by 2008<br />

Number of performance agreements<br />

with Transport Agencies by 2009<br />

Number of analytical systems<br />

established within MININFRA.<br />

Frequency of<br />

data collection<br />

Baseline<br />

value in 2006<br />

(except other<br />

given specific<br />

indication)<br />

MININFRA reports MININFRA Annually NA 100<br />

Target<br />

value for<br />

2011<br />

(except<br />

other given<br />

specific<br />

indication )<br />

MININFRA reports MININFRA Annual NA YES .<br />

MININFRA reports MININFRA Annual 0 4<br />

MININFRA reports MININFRA Annual 0 4<br />

Comment on<br />

availability o<br />

baseline<br />

value


14<br />

OVI<br />

number<br />

R121<br />

OVI formulation OVI description Source of information Responsible for<br />

data collection<br />

Adoption of a Transport Master-plan<br />

for Rwanda by 2009.<br />

R122 Five projects of international<br />

connections were completed or<br />

initiated over the period <strong>2007</strong>-2011<br />

R123<br />

Three lake projects of development<br />

fluvio were completed (2) or were<br />

initiated (1) over the period <strong>2007</strong>-<br />

2011<br />

Summarized Boolean indicator<br />

tracking if yes or not Transport<br />

Master-plan for Rwanda has been<br />

defined and adopted by 2009<br />

The five planned projects are:<br />

Regional airports rehabilitated /<br />

upgraded; the new airport built at<br />

Bugesera and is operational from the<br />

year 2012; Extension of the railroad<br />

from Isaka to Kigali built and<br />

operational from the year 2014; A dry<br />

port on the Northern and central<br />

corridors (Isaka, Kampala) built and<br />

operational as the year 2015; and<br />

Extension of the oil pipeline from<br />

Kampala to Kigali<br />

The three planned projects are (6<br />

quays of accosting arranged on the<br />

Lake Kivu and other lakes from here<br />

the year 2010; A shipyard built on the<br />

Lake Kivu as from the year 2010;<br />

Akagera river made navigable as<br />

from the year 2015.<br />

Frequency of<br />

data collection<br />

Baseline<br />

value in 2006<br />

(except other<br />

given specific<br />

indication)<br />

MININFRA reports MININFRA Annual NA YES<br />

MININFRA through:<br />

• Feasibility study & design reports and<br />

contract documents<br />

• Signed contracts for construction<br />

• Bi-lateral / Regional agreements for<br />

construction<br />

• Project Completion reports<br />

MININFRA through:<br />

• Feasibility study & design reports and<br />

contract documents<br />

• Signed contracts for construction<br />

• Bi-lateral / Regional agreements for<br />

construction<br />

• Project Completion reports<br />

MININFRA Annual Na<br />

(non applicable)<br />

MININFRA Annual Na 3<br />

Target<br />

value for<br />

2011<br />

(except<br />

other given<br />

specific<br />

indication )<br />

5<br />

Comment on<br />

availability of<br />

baseline<br />

value


15<br />

OVI<br />

number<br />

R131<br />

R132<br />

OVI formulation OVI description Source of information Responsible<br />

for data<br />

collection<br />

501Km length of the trunk roads was<br />

rehabilitated over the period <strong>2007</strong>-<br />

2011.<br />

All National Roads in Good or Fair<br />

Condition maintained over the period<br />

<strong>2007</strong>-2011.<br />

Length in Km of trunk roads in fair or<br />

bad conditions which benefited from<br />

rehabilitation activities<br />

Summarized Boolean indicator<br />

tracking if yes or not all National<br />

Roads in Good or Fair Condition<br />

maintained over the period <strong>2007</strong>-<br />

2011.<br />

Frequency of<br />

data collection<br />

MININFRA Reports MININFRA Annual Na<br />

Baseline<br />

value in 2006<br />

(except other<br />

given specific<br />

indication)<br />

(non applicable)<br />

Target<br />

value for<br />

2011<br />

(except<br />

other<br />

given<br />

specific<br />

indication)<br />

Comment on availability<br />

of baseline value<br />

501 Comparison should be made<br />

with annual performance in<br />

the past<br />

MININFRA Reports MININFRA Annual na YES Baseline study needed<br />

R133<br />

415 km length of the District roads<br />

was rehabilitated;<br />

Length in Km of District roads in fair<br />

or bad conditions which benefited<br />

from rehabilitation activities<br />

*Districts reports<br />

*District Road Condition Survey<br />

Annual National road condition survey<br />

DISTR<strong>ICT</strong>S Annual Na<br />

(non applicable)<br />

415 Comparison should be made<br />

with annual performance in<br />

the past<br />

MININFRA Reports<br />

R134<br />

All District Roads in Good or Fair<br />

Condition maintained over the period<br />

<strong>2007</strong>-2011.<br />

Summarized Boolean indicator<br />

tracking if yes or not all National<br />

Roads in Good or Fair Condition<br />

maintained over the period <strong>2007</strong>-<br />

2011.<br />

MININFRA Reports MININFRA Annual na YES Baseline study needed


16<br />

OVI<br />

number<br />

R141<br />

OVI formulation OVI description Source of information Responsible for<br />

data collection<br />

Transport Safety policy adopted by<br />

2008<br />

Summarized Boolean indicator<br />

tracking if yes or not Transport<br />

Safety policy adopted by 2008<br />

Frequency of<br />

data collection<br />

Baseline<br />

value in<br />

2006<br />

(except<br />

other given<br />

specific<br />

indication)<br />

MININFRA Reports MININFRA Annual na YES<br />

Target<br />

value for<br />

2011<br />

(except<br />

other given<br />

specific<br />

indication )<br />

Comment on<br />

availability of<br />

baseline<br />

value<br />

R142<br />

3 Transport Safety projects completed<br />

over the period <strong>2007</strong>-2011<br />

Number of Transport Safety projects<br />

completed over the period <strong>2007</strong>-<br />

2011<br />

MININFRA Reports MININFRA Annual Na (Non<br />

applicable)<br />

3<br />

R143<br />

3 articles of Transport Safety legislation<br />

enacted over the period <strong>2007</strong>-2011.<br />

Number of articles of Transport<br />

Safety legislation enacted over the<br />

period <strong>2007</strong>-2011<br />

MININFRA Reports MININFRA Annual Na (Non<br />

applicable)<br />

3<br />

R144<br />

At least 52 weekly medias campaign on<br />

road safety issues (Radio, television<br />

and newspaper) carried out annually<br />

over the period <strong>2007</strong>-2011.<br />

Number of Medias campaigns on<br />

road safety issues (Radio,<br />

television and newspaper) carried<br />

out annually over the period <strong>2007</strong>-<br />

2011<br />

MININFRA Reports MININFRA Weekly ? 52 Baseline value<br />

to be provided<br />

by needed<br />

baseline study


17<br />

OVI<br />

number<br />

R151<br />

R152<br />

R153<br />

R154<br />

OVI formulation OVI description Source of information Responsible for<br />

data collection<br />

Border and customs procedures simplified and<br />

standardized regionally.<br />

Time of transit for goods and passengers<br />

reduced by 10% on National Road corridors.<br />

The cost of container transport from Kigali to<br />

Mombassa reduced by 10% in real terms by<br />

2011<br />

The cost of a bus ticket from Kigali to Kamplala<br />

reduced by 10% in real terms by 2011<br />

Summarized Boolean indicator tracking<br />

if yes or not Border and customs<br />

procedures simplified and standardized<br />

regionally<br />

Ratio (%) of number of days spent for<br />

goods and passengers transit<br />

compared with initial duration (in days).<br />

Indicative cost of transport in USD<br />

referring to container transport from<br />

Kigali to Mombasa<br />

Ratio (%) of cost of a bus ticket from<br />

Kigali to Kamplala compared with initial<br />

cost.<br />

Frequency of<br />

data collection<br />

Baseline<br />

value in<br />

2006<br />

(except<br />

other given<br />

specific<br />

indication)<br />

MININFRA Reports MININFRA Annual na YES<br />

National statistical report<br />

Mininfra Database<br />

National statistical report<br />

MINICOM reports<br />

Mininfra Database<br />

National statistical report<br />

Mininfra Database<br />

MINICOM<br />

MININFRA<br />

NIS<br />

MINICOM<br />

MININFRA<br />

MINICOM<br />

MININFRA<br />

Target<br />

value for<br />

2011<br />

(except<br />

other given<br />

specific<br />

indication )<br />

Comment on<br />

availability of<br />

baseline<br />

value<br />

Annual ? 10% Need to specify<br />

the time (in<br />

hours) of<br />

transit for<br />

goods and<br />

passengers in<br />

2006 through<br />

baseline study.<br />

Annual 4,316 USD 3,021 USD<br />

Annual ? 10% Need to specify<br />

the initial cost<br />

in 2006<br />

through<br />

baseline study


18<br />

OVI<br />

number<br />

R161<br />

OVI formulation OVI description Source of information Responsible for<br />

data collection<br />

4 service and rest areas with devices of<br />

fight against the AIDS were arranged on<br />

the corridors of the truck-drivers over the<br />

period <strong>2007</strong>-2011<br />

R162 5 clauses introduced to contract<br />

documents for protection of the<br />

environment, gender quality, HIV/AIDS<br />

prevention and employment creation.<br />

R163<br />

At least 0.5 % of total amount contract<br />

dedicated to HIV/AIDS, Gender and<br />

environmental protection<br />

Number of service and rest<br />

areas arranged in order to fight<br />

against AIDS<br />

Number of clauses introduced to<br />

contract documents for<br />

protection of the environment,<br />

gender quality, HIV/AIDS<br />

prevention and employment<br />

creation<br />

MININFRA through:<br />

• standard construction contract<br />

• Signed contract documents<br />

• Contract progress and<br />

completion reports<br />

MININFRA through:<br />

• standard construction contract<br />

• Signed contract documents<br />

• Contract progress and<br />

completion reports<br />

Frequency of<br />

data collection<br />

Baseline<br />

value in<br />

2006<br />

(except<br />

other given<br />

specific<br />

indication)<br />

MININFRA Annual ? 4<br />

MININFRA Annual ? 5<br />

Percent of budget dedicated to MiININFRA reports MININFRA Annual ? 0.5<br />

HIV/AIDS, Gender and<br />

environmental protection<br />

compared with total budget<br />

contracted within infrastructure<br />

sector works<br />

Target<br />

value for<br />

2011<br />

(except<br />

other given<br />

specific<br />

indication )<br />

Comment on<br />

availability of<br />

baseline<br />

value


TABLE 4: LOGFRAME FOR ENERGY SUB-SECTOR OVER EDPRS PERIOD <strong>2007</strong>- 2011<br />

19<br />

Logic of intervention Objectively verifiable indicator Source of verification Assumptions<br />

(Risks)<br />

GOAL / IMPACT / WIDER OBJECTIVE / GLOBAL OBJECTIVE<br />

Energy sub-sector has contributed<br />

to sustainable economic<br />

development and poverty reduction<br />

in Rwanda over the period <strong>2007</strong> to<br />

2011.<br />

PURPOSE / OUTCOME/ DEVELOPMENT OBJECTIVE<br />

Energy supply security in the<br />

country ensured through<br />

improvement of production and<br />

rationalisation of energy<br />

consumption<br />

ENERGY : GO OVI / DO OVI<br />

(QUID DECENTRALISATION)<br />

• GO1. Energy sub-sector development has contributed at least at the rate of 5% to the<br />

average annual growth of GDP fixed at least at 7% over the period <strong>2007</strong> to 2011.<br />

• NIS statistical Database<br />

• BNR Annual Report<br />

Availability of<br />

funds<br />

• GO2. The portion of energy expenses in the household shopping basket • Mininfra Reports 8 Availability of<br />

funds<br />

• GO3. The number of new jobs created by Energy Sub-sector over the period <strong>2007</strong> to 2011 is<br />

at least 10000.<br />

• District Reports<br />

• Mininfra Database<br />

Availability of<br />

funds<br />

• GO4. The number of poor communities having access to energy increased from 100 in 2006<br />

to 1000 in 2011.<br />

• DO1-R1a. The capacity of Energy sub-sector increases from 45 to 120 MW over the period<br />

<strong>2007</strong> to 2011.<br />

• DO1-R1b. At least 10% of produced energy is from new renewable sources of energy by<br />

2011.<br />

• DO2-R2a. The rate of access to electricity has increased from 4% to 10% over the period<br />

<strong>2007</strong> to 2011 (the number of households having access to electricity has increased from 70<br />

000 to 200 000);<br />

• DO2-R2b. A decrease of 30 to 40% in the consumption of firewood through the use of<br />

improved cook stoves by 100% of rural households.<br />

• DO3-R3. The price of electricity has decreased at least by 50% from 22 USC/kWh to 10<br />

Usc/kWh over the period 2001 to 2011, in particular through the reduction of cost of<br />

electricity provision to end users.<br />

• DO4-R4. The number of institutions providing social and administrative services having<br />

access to energy (such as schools, health centres, administration offices) increases from<br />

50% in 2006 to 70% in 2011.<br />

• DO5-R5. 80 % of energy users and operators in the energy sub-sector are satisfied with the<br />

quality of services and technical capacities put in place.<br />

• DO6-R6. 70% of operators in the energy sub-sector are satisfied with the institutional, legal<br />

and regulatory environment as well as the quality of associated services.<br />

• District Reports<br />

• Mininfra Reports<br />

• NIS statistical Database<br />

• Mininfra Database<br />

• NIS statistical Database<br />

• Mininfra Database<br />

• ELECTROGAZ Reports;<br />

• Mininfra Database<br />

• NIS statistical Database<br />

• Mininfra Database<br />

• MININFRA Database<br />

Availability of<br />

funds<br />

Availability of<br />

funds<br />

Availability of<br />

funds<br />

Availability of<br />

funds<br />

Availability of<br />

funds<br />

Availability of<br />

funds<br />

8 This <strong>logframe</strong> integrates a series of comments in the one outlined in the provisional report of January <strong>2007</strong>. But the discussions between MININFRA <strong>ICT</strong> services and World Bank<br />

have not yet been concluded. The <strong>logframe</strong> taking into account the last comments will be completed by MININFRA after the mission.


20<br />

Logic of intervention Objectively verifiable indicator Source of<br />

verification<br />

OUTPUT / PRODUCT<br />

R1a. Energy infrastructure production, and distribution<br />

capacity has increased over the period <strong>2007</strong>-2011.<br />

R1b. Energy production resources have been diversified and<br />

various local energy production sources are operated over<br />

the period <strong>2007</strong>-2011.<br />

ENERGY : 19 OVI, TYPE OUTPUT<br />

(QUID DE CENTRALISATION)<br />

• 30 new hydroelectric sites will be operated over the<br />

period <strong>2007</strong>-2011, increasing the current capacity of<br />

20MW to 50MW in 2011.<br />

• 25 MW have been installed through the valorisation of<br />

methane gas in Lake Kivu over the period 2001-2011.<br />

• Extension of electricity network of 3230 in 2006 to 5000<br />

km in 2011.<br />

• Improvement of the quality of the network resulting in<br />

the reduction of 25% of losses.<br />

• Strategic studies on renewable energy and energy<br />

effectiveness are carried out.<br />

• 3000 Photovoltaic solar installations (1MW) and 15000<br />

biogas digesters are implemented over the period <strong>2007</strong>-<br />

2011<br />

• Specific studies and pilot installations (wind,<br />

geothermal, peat, fuel, others) have been carried out<br />

over the period <strong>2007</strong>-2011.<br />

MININFRA Reports<br />

MININFRA Reports<br />

Assumptions (Risks)<br />

Disturbance of ground<br />

water<br />

Availability of funds<br />

Availability of funds<br />

R.2.a. Access of households to energy has improved.<br />

• A programme for facilitation of access to energy for all<br />

categories has been defined and implemented over the<br />

period <strong>2007</strong>-2011.<br />

MININFRA Reports<br />

Availability of funds<br />

• 130 000 new households have access to electricity<br />

R.2.b. The cost of electricity has been reduced as a result of<br />

improvement of ELECTROGAZ management<br />

• ELECTROGAZ’s new intervention plan has been<br />

successfully implemented (audit before implementation)<br />

R3. Energy cost control has improved over the period <strong>2007</strong>-<br />

2011.<br />

20MW of energy have been saved annually over the period<br />

<strong>2007</strong>-2011 through: 800.000 low consumption lights; 30<br />

invertors, 10 installations of low energy consumption<br />

equipment.<br />

MININFRA Reports<br />

Availability of funds


21<br />

Logic of intervention Objectively Verifiable Indicator Source of<br />

verification<br />

R4. Access to energy for institutions providing social and<br />

administrative services has been improved<br />

R5. The capacities to ensure the sustainability of<br />

infrastructure are improved<br />

R6. The regulatory, legal and institutional framework has<br />

been put in place to ensure the security of provision and<br />

improvement of the quality of energy services over the<br />

period <strong>2007</strong>-2011.<br />

• The number of schools having access to energy is 1000.<br />

• The number of health centres having access to energy<br />

is 120.<br />

• The number of administration offices having access to<br />

energy is 300.<br />

• 20 energy service, supply, installation, and maintenance<br />

companies have been established over the period <strong>2007</strong>-<br />

2011 ;<br />

• 300 technicians have been trained over the period <strong>2007</strong>-<br />

2011.<br />

• An EDPRS-based sector strategic plan for the energy<br />

sub-sector has been defined and implemented<br />

according to the sector approach (SWAp) over the<br />

period <strong>2007</strong>-2011.<br />

• A national energy agency is operational over the period<br />

<strong>2007</strong>-2011<br />

• Laws pertaining to all energy fields are drafted and<br />

approved.<br />

MININFRA Reports<br />

MININFRA Reports<br />

Assumptions (Risks)<br />

Availability of funds<br />

Availability of funds


22<br />

OVI<br />

number<br />

OVI formulation OVI description Source of<br />

information<br />

GO1. Energy sub-sector development has<br />

contributed at least at the rate of 5% to the<br />

average annual growth of GDP fixed at least at<br />

7% over the period <strong>2007</strong>- 2011<br />

GO2.<br />

GO3.<br />

GO4.<br />

The portion of energy expenditures in the<br />

household shopping basket has decreased at<br />

least by 10% over the period <strong>2007</strong>-2011.<br />

The number of jobs created each year by<br />

energy sub-sector over the period <strong>2007</strong>-2011 is<br />

at least 10000.<br />

The number of poor communities having<br />

access to energy has increased from 100 to<br />

1000 in 2011.<br />

DO1-R1. The capacity of energy sub-sector has<br />

increased from 44 MW to 120 MW over the<br />

period <strong>2007</strong>-2011.<br />

DO1-R1b.<br />

At least 10 % of produced energy is from new<br />

renewable sources by 2011.<br />

DO2-R2a. • The rate of access to electricity has<br />

increased from 4% to 10% over the period<br />

<strong>2007</strong> to 2011 (the number of households<br />

having access to electricity has increased<br />

from 70 000 to 200 000);<br />

The ratio of the total Energy<br />

Sector added value times<br />

one hundred divided by the<br />

national GDP<br />

Ratio of the energy expenses<br />

weighted average compared<br />

to the average of the total<br />

household expenses<br />

Absolute number of<br />

employees in the Energy<br />

Sub-sector (public and private<br />

enterprises)<br />

Absolute number of poor<br />

Communities (Imidugudu,<br />

business centres, ect.) having<br />

access to energy (public and<br />

private enterprises)<br />

Absolute number of produced<br />

MW<br />

Ratio in % of the quantity of<br />

energy from new renewable<br />

energy compared to the total<br />

quantity of energy produced<br />

Absolute number of<br />

households having access to<br />

electricity<br />

BNR<br />

reports<br />

BNR<br />

reports<br />

annual<br />

annual<br />

NIS annual reports<br />

MININFRA<br />

Reports<br />

NIS Data base<br />

MININFRA Reports<br />

Mininfra data base<br />

MININFRA Reports<br />

Mininfra data base<br />

MININFRA Reports<br />

NIS Data base<br />

Mininfra data base<br />

Mininfra reports<br />

Responsible<br />

for data<br />

collection<br />

BNR<br />

NIS<br />

BNR<br />

NIS<br />

Frequency of data<br />

collection<br />

Baseline<br />

value in<br />

2006<br />

(except<br />

other given<br />

specific<br />

indication)<br />

Target<br />

value for<br />

2011<br />

(except<br />

other<br />

given<br />

specific<br />

indication<br />

)<br />

Comment on availability of<br />

baseline value<br />

Annually < 1 % 5 % • Data is published each year in<br />

BNR reports<br />

• This requires an absolute increase<br />

in energy added value of 7% per<br />

year.<br />

Annually ? 10 % • Data is published each year in<br />

BNR reports<br />

• This requires the setting up of a<br />

baseline before <strong>2007</strong>.<br />

MININFRA Annually ? 10000 • A system for data collection<br />

should be established either<br />

directly by MININFRA, or through<br />

the Ministry in charge of labour.<br />

• This requires the setting up of a<br />

baseline before the end of <strong>2007</strong><br />

NIS<br />

Annually 100 1500<br />

DISTR<strong>ICT</strong>S<br />

Mininfra Annually 44 MW 120 MW<br />

Mininfra Annually ? 10% A baseline before the end of <strong>2007</strong> is<br />

required.<br />

NIS Annually 70000 200000<br />

DO2-R2b. A decrease of 30 to 40% in the consumption of<br />

firewood through the use of improved cook<br />

stoves by 100% of rural households<br />

The ratio of the number of<br />

households having access to<br />

improved cooking stoves times<br />

one hundred divided by the<br />

total number of households<br />

NIS Data base<br />

Mininfra data base<br />

MININFRA reports<br />

NIS Annually ? 100% A baseline before the end of <strong>2007</strong><br />

would be better


23<br />

OVI<br />

number<br />

DO3-R3.<br />

DO4-R4.<br />

DO5-R5.<br />

DO6-R6.<br />

OVI formulation OVI description Source of<br />

information<br />

The price of electricity has decreased at least<br />

by 50% from 22 USC/kWh to 10 Usc/kWh over<br />

the period 2001 to 2011, through the reduction<br />

of cost of electricity provision to end users<br />

The number of institutions providing social and<br />

administrative services before access to energy<br />

(such as schools, health centres, administration<br />

offices) increases from 50% in 2006 to 70% in<br />

2011<br />

80 % of energy users and operators in the<br />

energy sub-sector are satisfied with the quality<br />

of services and technical capacities put in place<br />

over the period <strong>2007</strong>-2011<br />

70% of operators in the energy sub-sector are<br />

satisfied with the institutional, legal and<br />

regulatory environment as well as the quality of<br />

associated services<br />

Absolute electricity prices Reports from :<br />

ELECTROGAZ<br />

ENERGY AGENCY<br />

MININFRA<br />

NIS data base<br />

Mininfra DB<br />

Number of institutions<br />

providing social and<br />

administrative services which<br />

have access to energy<br />

The ratio (in %) of the number<br />

of energy users or operators in<br />

the energy sub-sector<br />

satisfied with the quality of<br />

services and technical<br />

capacities put in place times<br />

one hundred divided by the<br />

total number of users and<br />

operators in the sub-sector<br />

The ratio (in %) of the number<br />

of energy users or operators in<br />

the energy sub-sector satisfied<br />

with the institutional, legal and<br />

regulatory environment times<br />

one hundred divided by the<br />

total number of operators in<br />

the sub-sector.<br />

Reports from:<br />

ELECTROGAZ<br />

ENERGY AGENCY<br />

MININFRA<br />

NIS Data base<br />

Mininfra DB<br />

Reports from :<br />

ELECTROGAZ<br />

ENERGY AGENCY<br />

MININFRA<br />

NIS Data base<br />

Mininfra DB<br />

Reports from :<br />

ELECTROGAZ<br />

ENERGY AGENCY<br />

MININFRA<br />

NIS Data base<br />

Mininfra DB<br />

Responsible<br />

for data<br />

collection<br />

Frequency of data<br />

collection<br />

Baseline<br />

value in<br />

2006<br />

(except<br />

other given<br />

specific<br />

indication)<br />

Target<br />

value for<br />

2011<br />

(except<br />

other<br />

given<br />

specific<br />

indication<br />

)<br />

NIS Annually 22 USc/kWh 10USc/kWh .<br />

Districts<br />

NIS<br />

Mininfra<br />

Comment on availability of<br />

baseline value<br />

Annually 50% 70% A baseline before the end of <strong>2007</strong><br />

would be better in order to determine<br />

the absolute number of institutions<br />

providing social and administrative<br />

services, which are beneficiaries of<br />

energy.<br />

Mininfra Annually NA 80%<br />

Mininfra Annually NA 70%


24<br />

OVI<br />

number<br />

R1a1.<br />

OVI formulation OVI description Source of<br />

information<br />

30 new hydroelectric sites are operated over<br />

the period <strong>2007</strong>-2011 increasing the current<br />

capacity of 20MW to 50MW over the period<br />

<strong>2007</strong>- 2011.<br />

• The number of hydroelectric sites<br />

operated in 2006 and 2011<br />

• The number of MW in place<br />

District Reports<br />

Mininfra DB<br />

Mininfra Report<br />

Responsible for<br />

data collection<br />

DISTR<strong>ICT</strong>S<br />

Mininfra<br />

Frequency of<br />

data collection<br />

Annually ?<br />

Baseline<br />

value in<br />

2006<br />

(except<br />

other given<br />

specific<br />

indication)<br />

20MW<br />

Target<br />

value for<br />

2011<br />

(except<br />

other given<br />

specific<br />

indication)<br />

30<br />

50MW<br />

Comment on availability<br />

of baseline value<br />

A baseline before the end<br />

of <strong>2007</strong> would be better in<br />

order to determine the<br />

number of hydroelectric<br />

sites operated in 2006.<br />

R1a2.<br />

25 MW have been installed through the<br />

development of methane gas in Lake KIVU<br />

over the period 2001-2011<br />

Absolute number of power capacity<br />

installed in MW.<br />

MininfraDB<br />

Mininfra Report<br />

Mininfra Annually 0 25 MW<br />

R1a3.<br />

Extension of electricity network from 3230 in<br />

2006 to 5000 km in 2011.<br />

Absolute number of km of electrical<br />

power extension.<br />

Mininfra DB<br />

Mininfra Report<br />

Mininfra Annually 3230 Km 5000 Km<br />

R1a4.<br />

Improvement of the quality of the network<br />

resulting in the reduction of 25% of losses<br />

The ratio (in %) of the number of KWh<br />

sent, times one hundred divided by the<br />

number of KWh paid<br />

Mininfra DB<br />

Mininfra Report<br />

Mininfra Annually 20 à 24 % 15 %<br />

(- 25 %)<br />

Cfr CEDP baseline, which<br />

sets the level of electricity<br />

losses in 2005 at 24%.<br />

R1b1.<br />

Strategic studies on renewable energy and<br />

energy effectiveness are carried out over the<br />

period <strong>2007</strong>-2011.<br />

Boolean indicator tracking if yes or not<br />

expected strategic studies on<br />

renewable energy and energy<br />

effectiveness have been carried out.<br />

Mininfra Report Mininfra Annually NA OUI<br />

R1b21. 3000 Photovoltaic solar installations (1MW) Absolute number of solar photovoltaic<br />

installations implemented.<br />

R1b22.<br />

R1b3.<br />

15000 biogas digesters are implemented over<br />

the period <strong>2007</strong>-2011.<br />

Specific studies and pilot installations (wind,<br />

geothermal, peate, bifuel, others) have been<br />

carried out over the period <strong>2007</strong>-2011.<br />

Absolute number of digesters installed.<br />

Boolean indicator tracking if yes or not<br />

specific studies and expected pilot<br />

studies on renewable energy and<br />

energy effectiveness have been carried.<br />

Mininfra DB<br />

Mininfra Report<br />

Mininfra DB<br />

Mininfra Report<br />

Mininfra Annually ? 3000 A baseline before the end<br />

of <strong>2007</strong> would be desirable.<br />

Mininfra Annually ? 15000 A baseline before the end<br />

of <strong>2007</strong> would be desirable<br />

Mininfra Report Mininfra Annually NA OUI


25<br />

OVI<br />

number<br />

OVI formulation OVI description Source of<br />

information<br />

R2a1. A programme to facilitate access of all<br />

categories to energy has been defined and<br />

implemented over the period <strong>2007</strong>-2011.<br />

Boolean indicator tracking if yes or not a<br />

facilitation programme for access of all<br />

categories to energy has been defined<br />

and implemented.<br />

Responsible for<br />

data collection<br />

Frequency of<br />

data collection<br />

Baseline<br />

value in<br />

2006<br />

(except<br />

other given<br />

specific<br />

indication)<br />

Mininfra Report Mininfra Annually NA YES<br />

Target<br />

value for<br />

2011<br />

(except<br />

other given<br />

specific<br />

indication)<br />

Comment on availability<br />

of baseline value<br />

R2a2.<br />

R2b1.<br />

R31<br />

R41<br />

130 000 new households have access to<br />

electricity over the period <strong>2007</strong>-2011<br />

ELECTROGAZ new intervention plan has<br />

been successfully implemented (audit before<br />

implementation) over the period <strong>2007</strong>-2011<br />

20MW of energy have been saved annually<br />

over the period <strong>2007</strong>-2011 through: 800.000<br />

low consumption lights; 30 invertors, 10<br />

installations of low energy consumption<br />

equipment<br />

The number of new schools having access to<br />

energy is 1000 over the period <strong>2007</strong>-2011.<br />

The number of new households having<br />

access to electricity<br />

Boolean indicator tracking if yes or not<br />

the new ELECTROGAZ intervention<br />

plan has been successfully<br />

implemented.<br />

Absolute number of MW saved<br />

Absolute number of new schools having<br />

access to energy<br />

Mininfra DB<br />

Mininfra Report<br />

Mininfra Annually 70.000<br />

(en 2005)<br />

200.000<br />

(+130.000)<br />

Mininfra Report Mininfra Annually NA YES<br />

Mininfra DB<br />

Mininfra Report<br />

Mininfra DB<br />

Mininfra Report<br />

Mininfra Annually NA 20 MW<br />

Cfr CEDP Baseline, which<br />

sets the number of electricity<br />

subscribers at 70.187 at the<br />

end of 2005.<br />

Mininfra Annually ? 1000 A baseline is required<br />

R42<br />

The number of new health centres having<br />

access to energy is 120 over the period <strong>2007</strong>-<br />

2011.<br />

Absolute number of new health centres<br />

having access to energy<br />

Mininfra DB<br />

Mininfra Report<br />

Mininfra Annually ? 120 A baseline is required<br />

R43<br />

The number of new administration offices<br />

having access to energy is 300.<br />

Absolute number of new offices having<br />

access to energy<br />

Mininfra DB<br />

Mininfra Report<br />

Mininfra Annually ? 300 A baseline is required<br />

R51<br />

20 energy service, supply, installation, and<br />

maintenance companies have been created<br />

over the period <strong>2007</strong>-2011;<br />

Absolute number of energy, supply,<br />

installation and maintenance service<br />

companies created<br />

Mininfra DB<br />

Mininfra Report<br />

Mininfra Annually NA 20<br />

R52<br />

300 technicians have been trained over the<br />

period <strong>2007</strong>-2011<br />

Absolute number of technicians trained<br />

Mininfra DB<br />

Mininfra Report<br />

Mininfra Annually NA 300


26<br />

OVI<br />

number<br />

R61<br />

R62<br />

OVI formulation OVI description Source of<br />

information<br />

An EDPRS-based sector strategic plan for the<br />

energy sub-sector has been defined and<br />

implemented according to the Sector Wide<br />

Approach (SWAp) over the period <strong>2007</strong>-2011<br />

Laws relating to all Energy fields are drafted<br />

and approved<br />

Boolean indicator tracking if yes or not<br />

the new EDPRS-based sector strategic<br />

plan for the energy sector has been<br />

implemented according to the sector<br />

approach (SWAp)<br />

Boolean indicator tracking if yes or not<br />

laws relating to all energy fields have<br />

been formulated and approved<br />

Responsible for<br />

data collection<br />

Frequency of<br />

data collection<br />

Baseline<br />

value in<br />

2006<br />

(except<br />

other given<br />

specific<br />

indication)<br />

Mininfra Report Mininfra Annually NA YES<br />

Mininfra Report Mininfra Annually NA YES<br />

Target<br />

value for<br />

2011<br />

(except<br />

other given<br />

specific<br />

indication)<br />

Comment on availability<br />

of baseline value<br />

R63<br />

A national energy agency is operational over<br />

the period <strong>2007</strong>-2011<br />

Boolean indicator tracking if yes or not<br />

the national energy agency is in place<br />

and operational over the period <strong>2007</strong>-<br />

2011.<br />

Mininfra Report Mininfra Annually NA YES


27<br />

TABLE 5: LOGFRAME FOR HOUSING AND URBANISM SUB-SECTOR OVER EDPRS PERIOD <strong>2007</strong>-2011<br />

Logic of intervention Objectively verifiable indicator Source of verification Assumptions<br />

(Risks)<br />

GOAL / IMPACT / WIDER OBJECTIVE / GLOBAL OBJECTIVE<br />

The housing and city planning infrastructure<br />

sub-sector has contributed to sustainable<br />

economic development and poverty reduction in<br />

Rwanda over the period <strong>2007</strong>-2011.<br />

PURPOSE / OUTCOME/ DEVELOPMENT OBJECTIVE<br />

The volume and quantity of infrastructures in the<br />

Housing and City Planning sub-sector in Rwanda<br />

has increased over the period <strong>2007</strong>- 2011.<br />

OR<br />

The objective may also be formulated as follows:<br />

“The development of this sector made it possible<br />

to house a bigger number of urban populations,<br />

and the housing conditions of communities living<br />

in rural and urban areas as well as working<br />

conditions of public services have been<br />

improved following the organization and<br />

improvement of urban and semi-urban human<br />

facilities as well as public buildings”<br />

HABITAT&URBANISM : 2 GO OVI / 7 DO OVI<br />

(QUID DECENTRALISATION)<br />

• GO1. The development of Housing and City Planning infrastructure has contributed at<br />

least at the rate of 10.5% to the average annual growth rate of GDP fixed at least at 7%<br />

over the period <strong>2007</strong>-2011.<br />

• GO2. The number of jobs created each year by the Housing and City Planning Sector<br />

over the period <strong>2007</strong>-2011 is at least X<br />

• GO3. The number of vulnerable households without decent housing, which was 192 000<br />

in 2002, and 177 000 in 2006 falls to 132 750 in 2011, that is a decrease of 25%.<br />

• OD0-R01. All districts and the central level have benefited from capacity building actions<br />

over the period <strong>2007</strong>-2011<br />

• OD1-R1. The volume of infrastructures in the Housing and City Planning sub-sector has<br />

increased at least by 30% so as to accommodate urban population, which has increased<br />

from 17% to 22% over the period <strong>2007</strong>-2011<br />

• DO2-R2. The % of urban population living in planned and developed areas is at least 10<br />

to 15%, increasing from about 150,000 to 190,000 inhabitants in these areas over the<br />

period <strong>2007</strong>-2011.<br />

• DO3-R3. The population living in imidugudu increases from 20% to 25% over the period<br />

<strong>2007</strong>-2011.<br />

• DO4-R4. The housing production cost (cost per m 2 ) has decreased at least by 20% over<br />

the period <strong>2007</strong>-2011.<br />

• DO5-R5. The % of beneficiaries satisfied with the improvement of the quality of Housing<br />

and City Planning is at least 80% over the period <strong>2007</strong>-2011.<br />

• OD6-R6. The number of vulnerable households without decent houses, which was 192<br />

000 in 2002, and 177 000 in 2006 has fallen to 132 750 in 2011, that is a decrease of<br />

25%.<br />

• DO7-R71. The percentage of offices at central level that meet the standards increases<br />

from 80% to 90%, while at decentralised level, it increases from 60% to 80% <strong>2007</strong>-2011.<br />

• NIS statistical data base<br />

• BNR Annual report<br />

• Mininfra Reports 9<br />

• District reports; and Mininfra Data base<br />

• District reports;<br />

• Mininfra reports<br />

• NIS statistical data base<br />

• Mininfra data base<br />

• NIS statistical data base<br />

• Mininfra data base<br />

District reports; and Mininfra data base<br />

• NIS statistical data base<br />

• BNR Annual Report<br />

• NIS statistical data base<br />

District reports; and Mininfra data base<br />

9 For jobs, Mininfra shall institute site reports.


28<br />

Logic of intervention Objectively verifiable indicator Source of verification Assumptions (Risks)<br />

OUTPUT / PRODUCT<br />

R41a. Property development has been encouraged and<br />

involved over the period <strong>2007</strong>-2011<br />

R41b. The production of house building plots has been<br />

emphasized over the period <strong>2007</strong>-2011<br />

R41c. A participatory housing financing system including,<br />

among other things, the terms of housing savings, has been<br />

defined and implemented over the period <strong>2007</strong>-2011<br />

R42. A process aimed at providing cities with Development<br />

Master Plans or a simplified development plan has been<br />

successfully implemented over the period <strong>2007</strong>-2011<br />

R43 An Imidugudu promotion process has been defined and<br />

successfully implemented over the period <strong>2007</strong>-2011<br />

R44. The production cost of building materials has<br />

decreased over the period <strong>2007</strong>-2011<br />

Objectively verifiable indicator<br />

HABITAT&URBANISM : 2 GO OVI / 7 DO OVI<br />

(QUID DECENTRALISATION)<br />

• 50% of new real estate developers are involved in urban<br />

Development.<br />

• 10 000 hectares are developed: 20% high standing; 30<br />

% medium standing; 50 % low standing.<br />

• The Housing Bank has been strengthened and a<br />

financing of FRW 1000 million has been disbursed over the<br />

period <strong>2007</strong>-2011<br />

• 18 cities have Development Master Plans or a simplified Districts<br />

Development plan.<br />

• Particular Development Plans resulting in 10,000<br />

hectares have been elaborated over the period <strong>2007</strong>-2011 10<br />

• 5700 Imidugudu 11 have been created over the period<br />

<strong>2007</strong>-2011<br />

• The housing cost has decreased by 20% over the period<br />

<strong>2007</strong>-2011<br />

MININFRA/Housing<br />

and City<br />

Planning /Districts<br />

MININFRA/Housing<br />

and City<br />

Planning /Districts<br />

Districts<br />

MININFRA/ Housing<br />

and City Planning<br />

/Districts<br />

MININFRA/ Housing<br />

and City<br />

Planning /Districts<br />

MININFRA/ Housing<br />

and City Planning<br />

/Districts<br />

MININFRA/ Housing<br />

and City<br />

Planning /Districts<br />

Building a reliable data<br />

base<br />

Technical Capacities<br />

strengthened<br />

10 Currently, only Kibuye City (Karongi District) has an approved plan. That of Cyangugu (Nyamasheke) is in the process of approval. The new City Development Master Plans concern Kigali City, Rwamagana,<br />

and Nyagatare<br />

11 Imidugudu settlements comprise 100 households, that is 500 persons.


29<br />

Logic of intervention Objectively Verifiable Indicator Source of<br />

verification<br />

OUTPUT / PRODUCT<br />

R45a. New public buildings have been constructed over the<br />

period <strong>2007</strong>-2011<br />

Objectively verifiable indicator<br />

HABITAT&URBANISM : 2 GO OVI / 7 DO OVI<br />

(QUID DECENTRALISATION)<br />

• 5 administrative buildings are built at central level and 5<br />

administrative buildings at district level<br />

MININFRA Reports<br />

District Reports<br />

Assumptions (Risks)<br />

R45b. Public buildings have been rehabilitated over the<br />

period <strong>2007</strong>-2011<br />

R46. Informal areas or areas with indecent living conditions<br />

have been improved over the period <strong>2007</strong>-2011<br />

R47. Facilities for the fight against AIDS and environment<br />

protection have been put in place within the framework of<br />

Imidugudu over the period <strong>2007</strong>-2011<br />

• 10 administrative buildings have been rehabilitated at<br />

central level and 305 administrative buildings at District level<br />

• 5 areas 12 have been restructured and the displaced<br />

people have been resettled, resulting in 10% of new<br />

households connected to water and electricity; 30 km of<br />

linear roads improved; 10% houses in restructured areas<br />

are connected to drainage canals over the period <strong>2007</strong>-<br />

2011.<br />

• 100% infrastructure sites have been accompanied by<br />

awareness campaings on the fight against AIDS over the<br />

period <strong>2007</strong>-2011<br />

• 100% of studies on the development of Housing and<br />

City Planning Infrastructure have integrated the environment<br />

component over the period <strong>2007</strong>-2011.<br />

MININFRA Reports<br />

District Reports<br />

MININFRA Reports<br />

District Reports<br />

MININFRA/Housing<br />

and City<br />

Planning /Districts<br />

R48 Capacity building is ensured over the period <strong>2007</strong>-<br />

2011<br />

R49. The cartography Service has been improved over the<br />

period <strong>2007</strong>-2011<br />

• 280 Technicians are trained over the period <strong>2007</strong>-2011 MININFRA Reports<br />

• A digital cartographic data base is put in place MININFRA Reports<br />

12 Although these seem to be few, in this case, it is big areas such as Gitega or Kimisagara in Kigali that are targeted.


30<br />

OVI<br />

number<br />

GO1.<br />

OVI formulation OVI description Source of information Responsible for<br />

data collection<br />

The development of Housing and<br />

City Planning infrastructure has<br />

contributed at least at the rate of<br />

10.5% to the average annual<br />

development rate of GDP fixed at<br />

least at 7% over the period <strong>2007</strong>-<br />

2011<br />

GO2. The number of additional jobs<br />

created each year by the Housing<br />

and City Planning Sector over the<br />

period <strong>2007</strong>-2011 is at least 20%<br />

The number of vulnerable<br />

households without decent housing,<br />

which was 192 000 in 2002, and 177<br />

000 in 2006 falls to 132 750 in 2011,<br />

that is a decrease of 25%.<br />

Total ratio of added value<br />

of the Housing and City<br />

Planning sub-sector times<br />

one hundred divided by the<br />

national GDP<br />

Absolute number of<br />

workers employed in the<br />

Housing and City Planning<br />

Sector (Public and private<br />

enterprises)<br />

Absolute number of<br />

vulnerable households<br />

without decent housing<br />

BNR Annual Reports<br />

MININFRA Reports<br />

Districts Reports<br />

Districts Reports MININFRA<br />

Reports<br />

MININFRA Data base<br />

BNR<br />

NIS<br />

MININFRA<br />

Districts<br />

MININFRA<br />

Districts<br />

Frequenc<br />

y of data<br />

collectio<br />

n<br />

Baseline<br />

value in<br />

2006<br />

(except<br />

other<br />

given<br />

specific<br />

indication)<br />

Target<br />

value for<br />

2011<br />

(except<br />

other<br />

given<br />

specific<br />

indicatio<br />

n)<br />

Comment on availability of<br />

baseline value<br />

Annually 10.5 % 10.5 % • Data is published each year in<br />

BNR reports<br />

• This requires an absolute<br />

increase in the Housing and City<br />

Planning added value of 7% per<br />

year<br />

Annually ? 10% A baseline before the end of <strong>2007</strong> is<br />

required.<br />

As the Housing and City Planning<br />

Sub-sector is a job creator, it is<br />

expected that the rate of job<br />

development will be fixed at a rate<br />

that is slightly higher than the GDP<br />

target rate (7.2%).<br />

Annually 177.000 132.750


31<br />

OVI<br />

number<br />

OD0-R01.<br />

OD1-R1.<br />

OD2-R2.<br />

OD3-R3.<br />

OD4-R4.<br />

OVI formulation OVI description Source of<br />

information<br />

All districts and central level have benefited<br />

from capacity building actions over the<br />

period <strong>2007</strong>-2011<br />

The volume of infrastructure in the Housing<br />

and City Planning sub-sector has<br />

increased at least by 30% so as to<br />

accommodate the urban population which<br />

has increased from 17% to 22% over the<br />

period <strong>2007</strong>-2011<br />

The % of urban population living in planned<br />

and developed areas is at least 10 to 15%,<br />

increasing from about 1.5 to 1.9 million<br />

inhabitants over the period <strong>2007</strong>-2011.<br />

The population living in imidugudu<br />

increases from 20% to 25% over the<br />

period <strong>2007</strong>-2011<br />

The housing production cost (cost per<br />

m 2 ) has decrease at least by 20%<br />

over the period <strong>2007</strong>-2011<br />

OD5-R5. The percentage of beneficiaries<br />

satisfied with the improvement of the<br />

quality of Housing and City Planning<br />

is at least 80% over the period <strong>2007</strong>-<br />

2011.<br />

OD6-R6.<br />

OD7-R7a.<br />

OD7-R7b.<br />

The number of vulnerable households<br />

without decent houses, which was 192 000<br />

in 2002, and 177 000 in 2006 has fallen to<br />

132 750 in 2011, that is a decrease of<br />

25%.<br />

At central level, the percentage of offices<br />

which meet the standards increases from<br />

80% to 90% over the period <strong>2007</strong>-2011<br />

At decentralised level the percentage of<br />

offices which meet standards increases from<br />

60% to 80% over the period <strong>2007</strong>-2011<br />

Boolean indicator tracking if yes or not all<br />

districts and the central level have<br />

benefited from capacity building actions<br />

Using the volume of public and private<br />

infrastructure (at a stable price) in the<br />

housing, city planning and community<br />

settlement sub-sector<br />

The ratio of the population living in<br />

planned and developed areas times one<br />

hundred divided by the total number of<br />

urban population.<br />

The ratio of the population living in<br />

imidugudu times one hundred divided by<br />

the total number of the population in<br />

imidugudu<br />

The ratio of the average annual house cost<br />

times one hundred divided by the total<br />

annual expenses of the household<br />

The ratio of the sample households which<br />

positively answered the question on the<br />

improvement of the quality of Housing and<br />

City Planning times one hundred divided<br />

by the total number of the sample of the<br />

survey<br />

The number of households living in<br />

« sheetings and blindés »<br />

The ratio of the number of services housed<br />

in decent public buildings times one<br />

hundred divided by the total number of<br />

public services.<br />

The ratio of the number of services housed<br />

in decent public buildings times one<br />

hundred divided by the total number of<br />

public services.<br />

District Reports;<br />

Mininfra Reports<br />

Responsi<br />

ble for<br />

data<br />

collection<br />

Districts<br />

Mininfra<br />

Frequency of<br />

data collection<br />

Baseline<br />

value in<br />

2006 (except<br />

other given<br />

specific<br />

indication)<br />

Annually NA YES<br />

NIS Data base NIS Annually Rwf 3.4<br />

billion<br />

Mininfra Data base<br />

as numerator;<br />

Population Census<br />

Data base/NIS as<br />

denominator<br />

District Reports;<br />

Mininfra Data base<br />

Mininfra<br />

NIS<br />

RGP<br />

Districts<br />

Mininfra<br />

Annual as<br />

numerator;<br />

annual<br />

estimates with<br />

periodic<br />

updating<br />

(Population<br />

General<br />

Census) as<br />

denominator<br />

estimations<br />

Annually;<br />

Periodic<br />

updating (PGS)<br />

Target value<br />

for 2011<br />

(except other<br />

given specific<br />

indication)<br />

RWF4.4 billion<br />

(+30%)<br />

Comment on availability<br />

of baseline value<br />

SNI 2002 (p21) estimates<br />

that investments in this<br />

sector should increase from<br />

RWF 3.4 billon to RWF 7.3<br />

billion in 2010 (including the<br />

land sub-sector)<br />

10 % 15 % This corresponds to an<br />

increase from about<br />

150,000 to 190,000<br />

inhabitants in these areas<br />

over the period <strong>2007</strong>-2011.<br />

20 % 25% This corresponds to an<br />

increase of inhabitants in<br />

imidugudu from about 1.8<br />

million to 2.5 million over<br />

the period <strong>2007</strong>-2011.<br />

NIS Database NIS Annually ? (-20%) A baseline is required<br />

before the end of <strong>2007</strong>.<br />

NIS Database NIS Annually NA 80% .<br />

District Reports<br />

NIS Database<br />

Mininfra Data base<br />

Districts<br />

NIS<br />

Mininfra<br />

Annually 177.000 144.000 .<br />

Mininfra Data base Mininfra Annually 80% 90%<br />

Mininfra Data base Mininfra Annually 60% 80%


32<br />

OVI<br />

number<br />

R41a.<br />

R41b.<br />

R41c.<br />

R42a.<br />

R42b.<br />

OVI formulation OVI description Source of<br />

information<br />

50% of new real estate developers intervene in The ratio of the difference between the<br />

urban Development at the end of the period nbr of developers in 2011 and 2006<br />

<strong>2007</strong>-2011. 13 times one hundred divided by the nbr of<br />

developers in 2011 and 2006 (idem for<br />

the nbr of independent developers)<br />

10 000 hectares of areas are developed;<br />

including 20% high standing ; 30 % medium<br />

standing ; 50 % low standing<br />

The Housing Bank has been strengthened and<br />

a financing of FRW 1000 Millions has been<br />

disbursed over the period <strong>2007</strong>-2011<br />

18 cities have Development Master Plans or a<br />

simplified Development plan<br />

Particular Development Plans resulting in<br />

10,000 hectares have been elaborated over<br />

the period <strong>2007</strong>-2011 14<br />

R43. 5700 Imidugudu15 have been created over the<br />

period <strong>2007</strong>-2011.<br />

R44<br />

The housing cost has decreased by 20% over<br />

the period <strong>2007</strong>-2011.<br />

Nbr of hectares with details on nbr of<br />

Ha:<br />

+High standing<br />

+Medium standing<br />

+Low standing<br />

Both qualitative and quantitative<br />

variable tracking if yes or not capacity<br />

building has taken place, particularly if<br />

1RWF billion has been disbursed.<br />

The ratio of the number of cities having<br />

Master Devel. Plans or a Simplified<br />

Devel. Plan times one hundred divided<br />

by the total number of cities.<br />

Qualitative variable tracking if yes or<br />

not PPA resulting in 10,000 ha have<br />

been achieved<br />

Number of new Imidugudu<br />

The ratio of the difference between the<br />

cost of building materials in 2006 and<br />

that of 2011 times one hundred divided<br />

by the cost of building materials in<br />

2006.<br />

Responsible for<br />

data collection<br />

Frequency of<br />

data collection<br />

Baseline<br />

value in<br />

2006<br />

(except<br />

other given<br />

specific<br />

indication)<br />

Target<br />

value for<br />

2011<br />

(except<br />

other given<br />

specific<br />

indication)<br />

Comment on<br />

availability of<br />

baseline<br />

value<br />

Mininfra DB Mininfra Annually ? 50% Setting a<br />

baseline is<br />

desirable before<br />

the end of <strong>2007</strong>.<br />

Mininfra DB Mininfra Annually ? 10.000<br />

Housing Bankt<br />

Mininfra DB<br />

BH<br />

Mininfra<br />

2000<br />

3000<br />

5000<br />

Annually NA 1000<br />

Mininfra DB Mininfra Annually 1/30 18 oout of 30<br />

Mininfra DB Mininfra Annually ? 10.000 Ha<br />

Districts<br />

Mininfra DB<br />

Districts<br />

Mininfra DB<br />

Districts<br />

Mininfra<br />

Districts<br />

Mininfra<br />

Annually 5486 6336<br />

Annually ? 20% A baseline is<br />

required before<br />

the end of<br />

<strong>2007</strong>.<br />

13 So far the Government seems to have been the only developer; it is necessary to involve private developers.<br />

14 For the moment only Kibuye City, Karongi District, has an approved plan. That of Cyangugu, Nyamasheke District, is in the process of approval. New SDAU concern Kigali City, Rwamagana and Nyagatare.<br />

15 Umudugudu settlement has 100 households, that is 500 people.


33<br />

OVI<br />

number<br />

R45a11.<br />

R45a12.<br />

OVI formulation OVI description Source of<br />

information<br />

5 administrative buildings are built at central<br />

level<br />

5 administrative buildings are built at district<br />

level<br />

R45B11. 10 administrative buildings have been<br />

rehabilitated at central level.<br />

R45B12. 305 administrative buildings have been<br />

rehabilitated at district level<br />

R46. 5 areas16 have been appropriately 17<br />

restructured over the period <strong>2007</strong>-2011.<br />

R47a. 100% infrastructure sites have been<br />

accompanied by awareness raising campaign<br />

for all workers on the fight against AIDS over<br />

the period <strong>2007</strong>-2011<br />

Number of new administrative buildings built at<br />

central level<br />

Number of new administrative buildings built at<br />

District level<br />

Number of new administrative buildings rehabilitated<br />

at central level<br />

Number of new administrative buildings rehabilitated<br />

at District level<br />

Both qualitative and quantitative variable tracking if<br />

yes or not the expected number of areas has been<br />

restructured<br />

The ratio of the number of infrastructure sites which<br />

were accompanied by awareness raising campaign<br />

on the fight against AIDS times one hundred divided<br />

by the total number of sites constructed.<br />

Responsible for<br />

data collection<br />

Frequency of<br />

data collection<br />

Baseline<br />

value in<br />

2006<br />

(except<br />

other given<br />

specific<br />

indication)<br />

Mininfra Reports Mininfra Annually NA 5<br />

District Reports<br />

Mininfra DB<br />

Districts<br />

Mininfra DB<br />

Districts<br />

Mininfra DB<br />

Districts<br />

Mininfra<br />

Districts<br />

Mininfra<br />

Districts<br />

Mininfra<br />

Annually NA 5<br />

Annually NA 10<br />

Annually NA 305<br />

Target<br />

value for<br />

2011<br />

(except<br />

other given<br />

specific<br />

indication)<br />

Comment on<br />

availability of<br />

baseline<br />

value<br />

Mininfra DB Mininfra Annually ? 5 A baseline is<br />

required before<br />

the end of <strong>2007</strong>.<br />

Mininfra DB Mininfra Annually ? 100% A baseline is<br />

required before<br />

the end of <strong>2007</strong>.<br />

R47b.<br />

100% of studies on Housing and City<br />

Planning Infrastructure development have<br />

integrated the environment component over the<br />

period <strong>2007</strong>-2011<br />

The ratio of studies on Housing and City Planning<br />

infrastructure development, which have integrated<br />

the environment component times one hundred<br />

divided by the total number of cities.<br />

Mininfra DB Mininfra Annually ? 100% A baseline is<br />

required before<br />

the end of <strong>2007</strong>.<br />

R481<br />

280 technicians are trained over the period<br />

<strong>2007</strong>-2011<br />

Number of technicians trained<br />

MININFRA/Housing<br />

and City Planning<br />

Mininfra Annually NA 280<br />

R491<br />

A digital cartographic data base has been put in<br />

place<br />

Boolean indicator tracking if yes or not a digital<br />

cartographic data base is in place and is operational<br />

MININFRA/Housing<br />

and City Planning<br />

Mininfra Annually NA YES<br />

16 Although these seem to be few, in this case it is big areas such as Gitega or Kimisagara in Kigali that are targeted.<br />

17 The qualifier ‘appropriate’ means that 10% of new households have been connected to water and electricity; 30 linear km of roads have been improved; 10 % of houses in restructured areas are connected to drainage canals


TABLE 6: LOGFRAME FOR <strong>ICT</strong> SUB-SECTOR OVER EDPRS PERIOD <strong>2007</strong>-2011 18<br />

34<br />

Logic of intervention Objectively verifiable indicator Source of verification Assumptions (Risks)<br />

<strong>ICT</strong> : 2 GO OVI/ 5 DO OVI<br />

(QUID DECENTRALISATION)<br />

GOAL / IMPACT / WIDER OBJECTIVE / GLOBAL OBJECTIVE<br />

The Information and Communication Technology GO1. The development of <strong>ICT</strong> infrastructure and services has contributed at least at<br />

(<strong>ICT</strong>) infrastructure and Service Sub-sector has the rate of 16% 19 to the average annual growth of GDP fixed at least at 7.2% over<br />

contributed to sustainable economic development the period <strong>2007</strong>-2011.<br />

and poverty reduction in Rwanda over the period<br />

(or <strong>ICT</strong> GDP has doubled amounting to RWF 62 billion)<br />

<strong>2007</strong>-2011.<br />

GO2. The number of jobs created each year by <strong>ICT</strong> Sector has increased from<br />

7,000 to 20,000 over the period <strong>2007</strong>-2011<br />

PURPOSE / OUTCOME/ DEVELOPMENT OBJECTIVE<br />

The <strong>ICT</strong> Industry has been promoted and access of DO1. The volume of investments in the <strong>ICT</strong> sub-sector shall increase from X% to y%<br />

active population to <strong>ICT</strong> at a low price has been over the period <strong>2007</strong>-2011<br />

improved over the period <strong>2007</strong>-2011<br />

DO2-a. 100% of the national territory has been covered by a Communication and<br />

OR<br />

digital radio/television broadcast network over the period <strong>2007</strong>-2011<br />

The volume and quality of the <strong>ICT</strong> sub-sector<br />

infrastructure in Rwanda has been improved over<br />

the period <strong>2007</strong>-2011<br />

DO2-b. X% of the national territory has been covered by the postal network over the<br />

period <strong>2007</strong>-2011<br />

DO3.a. The number of people who have access to communication services which is<br />

4% in 2005 and X% in 2006 has risen to 12% by 2011.<br />

DO3.b. Access to communication service access points shall be reduced to 5 km<br />

over the period <strong>2007</strong>-2011<br />

DO3.c. The percentage of Rwandans who have a mobile phone shall increase from<br />

3.21% to 12% over the period <strong>2007</strong>-2011<br />

DO3.d. The percentage of Rwandans who have access to Internet shall increase<br />

from 0.45% to 10% over the period <strong>2007</strong>-2011<br />

• DO4. The cost of access to telecommunication services has decreased at least by<br />

50% over the period <strong>2007</strong>-2011 (the cost of the international bandwidth shall fall<br />

from USD 4000 to USD 900 over the period 2006-2011; the cost of access to the<br />

television channel shall decrease from USD X to USD Y over the period 2006-<br />

2011; the unit price for access to communication services shall fall from RWF 120<br />

to RWF 60).<br />

DO5. The percentage of beneficiaries satisfied with the improvement of the quality of<br />

<strong>ICT</strong> services has increased at least by X% over the period <strong>2007</strong>-2011.<br />

• NIS statistical data base<br />

• BNR Annual Reports<br />

• RITA data base and reports<br />

• Mininfra20 DB<br />

Support shall continue from the<br />

top in the government hierarchy.<br />

Sustainable and increased<br />

support from development<br />

partners<br />

RIEPA Environment conducive to<br />

investment shall be further<br />

supported and developed<br />

RURA Report<br />

Investment in the <strong>ICT</strong> sector<br />

shall be supported and<br />

IPOSITA Report<br />

increased.<br />

The cost of technology will<br />

continue to decrease<br />

NICI Plan Review Report<br />

RURA Report<br />

NIS<br />

RURA Report<br />

NIS<br />

NIS statistical data base<br />

RURA Report<br />

Government sustainable support<br />

to the promotion of rural areas<br />

and private sector investment<br />

Competition in <strong>ICT</strong> sector will be<br />

real; a stronger and independent<br />

regulator as well as the price of<br />

the international bandwidth)<br />

18 This <strong>logframe</strong> is still at the stage of the one presented in the provisional report of January <strong>2007</strong> because, for instance, discussions between MININFRA <strong>ICT</strong> services and the Word Bank have not yet been concluded. The <strong>logframe</strong> taking into account the<br />

last comments shall be finalized by MININFRA. But the new structure combining the old <strong>logframe</strong> and with the first results of discussions, notably in order to include the NICI-2010 Plan is presented for information in Appendix 10.<br />

19 This number seems not to be realistic because in 2004, transport and <strong>ICT</strong> represented only about 8.1% of the GDP.<br />

20 For jobs, Mininfra shall institute site reports.


35<br />

Logic of intervention Objectively verifiable indicator Source of verification Assumptions (Risks)<br />

R1. The legal and regulatory framework<br />

has been strengthened over the period<br />

<strong>2007</strong>-2011 so as to create a competitive<br />

and balanced environment<br />

R2. The volume of communication, radio<br />

and television broadcast infrastructure<br />

has increased over the period 2006-<br />

2011<br />

R3. A competitive and regulated<br />

environment shall be created over the<br />

period 2006-2011 so as to reduce the<br />

service cost<br />

R4. Accessibility has been made easier<br />

and promoted over the period 2006-<br />

2011<br />

R5. Each <strong>ICT</strong> service contract shall lead<br />

to « SLA »<br />

• An electronic legislation shall be put in place over the<br />

period <strong>2007</strong>-2011<br />

• X statutory orders have been published over the period<br />

2006-2011<br />

• The number of post offices per district<br />

• The number of telecentres per sector shall be 300.<br />

• X regional communication infrastructure projects shall be<br />

implemented over the period 2006-2011<br />

• The number of operators in the <strong>ICT</strong> sector has increased<br />

from X to Y over the period 2006-2011<br />

• A system strengthening <strong>ICT</strong> regulations has been put in<br />

place.<br />

The distance from one communication service access point to<br />

another has been reduced from X to 5 km.<br />

The number of SLA signed will increase from X to 100 over<br />

the period 2006-2011<br />

MININFRA/RURA/<br />

RURA Report<br />

IPOSITA Report<br />

NICI Plan Review Report<br />

NIS<br />

RURA Report<br />

NICI Plan Review Report<br />

NIS<br />

RURA Report<br />

NICI Plan Review Report<br />

NIS<br />

RURA<br />

Sustainable support of <strong>ICT</strong> sector in the<br />

development of the legal and regulatory<br />

framework by judicial organs<br />

Harmonisation of the regional legal and<br />

regulatory framework shall continue<br />

The development of a Qos framework by<br />

the regulator shall continue


36<br />

OVI<br />

numbe<br />

r<br />

GO1.<br />

GO2.<br />

DO1<br />

DO2-a.<br />

DO2-b.<br />

DO3.a.<br />

DO3.b.<br />

DO3.c.<br />

DO3.d.<br />

DO4<br />

DO5<br />

OVI Formulation OVI Description Source of information Responsible<br />

for data<br />

collection<br />

<strong>ICT</strong> infrastructure and services development has<br />

contributed at the rate of X% to the average annual<br />

growth of GDP fixed at least at 7.2% over the period<br />

<strong>2007</strong>-2011. (Or <strong>ICT</strong> GDP has doubled amounting to<br />

RWF 62 billion)<br />

The number of jobs created each year by <strong>ICT</strong> sector<br />

has increased from 7,000 to 20,000 over the period<br />

<strong>2007</strong>-2011<br />

The volume of investment in the <strong>ICT</strong> sub-sector will<br />

increase from X% to y% over the period <strong>2007</strong>-2011<br />

100% of the national territory has been covered by a<br />

Communication and digital radio/television broadcast<br />

network over the period <strong>2007</strong>-2011<br />

X% of the national territory has been covered by the<br />

postal network over the period <strong>2007</strong>-2011<br />

The number of people who have access to<br />

communication services which is 4% in 2005 and X%<br />

in 2006 has risen to 12% by 2011.<br />

Access to communication service access points shall<br />

be reduced to 5 km over the period <strong>2007</strong>-2011<br />

The percentage of Rwandans who have a mobile<br />

phone shall increase from 3.21% to 12% over the<br />

period <strong>2007</strong>-2011<br />

The percentage of Rwandans who have access to<br />

the Internet shall increase from 0.45% to 10% over<br />

the period <strong>2007</strong>-2011<br />

The cost of access to telecommunication services<br />

has decreased at least by 50% over the period <strong>2007</strong>-<br />

2011 (the cost of the international bandwidth shall fall<br />

from USD 4000 to USD 900 over the period 2006-<br />

2011; the cost of access to the television channel<br />

shall decrease from USD X to USD Y over the period<br />

2006-2011; the unit price for access to<br />

communication services shall fall from RWF 120 to<br />

RWF 60).<br />

The percentage of beneficiaries satisfied with the<br />

improvement of the quality of <strong>ICT</strong> services has<br />

increased at least by X% over the period <strong>2007</strong>-2011<br />

Ratio of the total added value of the <strong>ICT</strong><br />

sub-sector times one hundred divided by<br />

the value of the national GDP<br />

Absolute number of workers employed in<br />

<strong>ICT</strong> sub-sector (public and private<br />

enterprises).<br />

The volume in RWF of public and private<br />

investments (at a constant price) in the<br />

<strong>ICT</strong> sub-sector.<br />

The ratio of the national territory covered<br />

times one hundred divided by the total<br />

area of the territory<br />

The ratio of the area of the territory<br />

covered times one hundred divided by the<br />

total area of the territory<br />

Absolute number of people having<br />

access to <strong>ICT</strong> services<br />

Average distance between users and <strong>ICT</strong><br />

service access points<br />

The ratio of the number of Rwandans who<br />

have a mobile phone times one hundred<br />

divided by the total number of Rwandans..<br />

The ratio of the number of Rwandans who<br />

have access to the Internet times one<br />

hundred divided by the total number of<br />

Rwandans<br />

Absolute cost of:<br />

• Bandwidth<br />

• Television channel<br />

• Communication/min.<br />

The ratio of the survey sample households<br />

who positively answered the question on<br />

the improvement of the quality OF <strong>ICT</strong><br />

services times one hundred divided by the<br />

NIS statistical data base<br />

RITA data base and<br />

report<br />

Mininfra DB21<br />

NIS DB<br />

MINICOM<br />

MININFRA<br />

RURA Report<br />

IPOSITA Report<br />

NICI Review Report<br />

RURA Report<br />

NIS<br />

BNR<br />

NIS<br />

Frequency of<br />

data collection<br />

Baseline<br />

value in<br />

2006<br />

(except<br />

other<br />

given<br />

specific<br />

indication)<br />

Target value<br />

for 2011<br />

(except other<br />

given<br />

specific<br />

indication)<br />

Comments on availability of<br />

baseline value<br />

Annually X0% X % Data published annually in BNR<br />

reports combined with Transport GDP<br />

(8.1% in 2004). Il would be better to<br />

separate information for both.<br />

MININFRA Annually ? ? A data collection system should be set<br />

up either at MININFRA directly or<br />

through the Ministry In charge of<br />

Labour<br />

NIS<br />

Annually ? ? Refer also to SNI<br />

MININFRA<br />

RURA<br />

MININFRA DB<br />

RURA<br />

MININFRA DB<br />

Annually ? 100 %<br />

Annually ? ?<br />

RURA Annually 4% 12% Reference = 2005.<br />

NIS DB NIS Every 5 years ? 5km EICV organised by NIS<br />

NICI Review Report<br />

RURA Report<br />

NICI Review Report<br />

RURA Report<br />

NIS<br />

NICI Review Report<br />

RURA Report<br />

NIS<br />

RURA Annually 3.2% 12 %<br />

RURA Annually 0.45 % 10 %<br />

RURA Annually<br />

4.000<br />

X ?<br />

120<br />

NIS Data base NIS Annually ? ? .<br />

900<br />

Y ?<br />

60<br />

21 For jobs, Mininfra should institute site reports.


Number<br />

of OVI<br />

R41.a.<br />

R41.b.<br />

total number of the sample population<br />

Formulation of OVI Description of OVI Source of<br />

information<br />

An electronic legislation will be put in place<br />

over the period 2006- 2011<br />

X statutory orders have been published over<br />

the period 2006- 2011<br />

Both qualitative and quantitative<br />

variable tracking if yes or not the<br />

electronic legislation has been put in<br />

place<br />

Absolute number of statutory orders<br />

published<br />

R42.a. The number of post offices per district Absolute number of post offices per<br />

district<br />

Gazette<br />

Mininfra<br />

Gazette<br />

Mininfra<br />

Responsible for<br />

information collection<br />

Frequency of<br />

information<br />

collection<br />

Reference<br />

value in 2006<br />

(unless<br />

otherwise<br />

stated)<br />

Mininfra Annually Na (Not<br />

applicable)<br />

MININFRA Annually Na ?<br />

IPOSITA Report IPOSITA Annually ? ?<br />

Target value<br />

in 2011<br />

(unless<br />

otherwise<br />

stated)<br />

1<br />

Comments on<br />

the existence<br />

of reference<br />

values<br />

37<br />

R42.b.<br />

The number of telecentres per sector will be<br />

300<br />

Absolute number of telecentres per<br />

sector<br />

MININFRA/RURA ? 300<br />

R43.a. X regional communication infrastructure<br />

projects shall be implemented over the period<br />

2006- 2011<br />

R43.b.<br />

R43.c.<br />

The number of operators in the <strong>ICT</strong> sector has<br />

increased from X to Y over the period 2006-<br />

2011<br />

A mechanism aimed at strengthening TIC<br />

regulations has been put in place.<br />

R44. The distance from one communication service<br />

access point to an other will be reduced from<br />

X to 5 km<br />

R45. The number of SLA signed shall increase<br />

from X to 100 over the period 2006- 2011<br />

Absolute number of regional<br />

communication infrastructures<br />

implemented<br />

Absolute number of operators in <strong>ICT</strong><br />

sectors<br />

Both qualitative and quantitative<br />

variable tracking if yes or not a<br />

mechanism aimed at strengthening<br />

<strong>ICT</strong> regulations has been put in place.<br />

Average distance declared by the<br />

households from the closest<br />

communication service access point.<br />

Absolute number of SLA that will be<br />

signed<br />

RURA Report<br />

Mininfra Archives<br />

RURA/MININFRA<br />

Reports<br />

RURA/MININFRA<br />

Reports<br />

NIS BD<br />

Mininfra DB<br />

MININFRA Annually ? ?<br />

RURA Annually ? ?<br />

RURA Annually ? ?<br />

NIS Annually ? 5 Km<br />

Mininfra DB MININFRA Annually ? 100


38<br />

TABLE 7: LOGFRAME FOR METEOROLOGY SUB-SECTOR OVER EDPRS PERIOD <strong>2007</strong>-2011<br />

Logic of intervention Objectively verifiable indicator Source of verification Assumptions (Risks)<br />

H&U : 1 GO OVI / 2 DO OVI<br />

(QUID DECENTRALISATION)<br />

GOAL / IMPACT / WIDER OBJECTIVE / GLOBAL OBJECTIVE<br />

The meteorology sub-sector has contributed to • GO1. Data from the meteorology sector is sold from 2008. • NIS statistical data<br />

sustainable economic development and poverty reduction<br />

in Rwanda over the period <strong>2007</strong>-2011.<br />

base<br />

• BNR Annual Report<br />

PURPOSE / DEVELOPMENT OBJECTIVE / METEOROLOGY OUTCOME: 4 OVI<br />

Availability of reliable current and past information<br />

necessary for the current needs of various sectors, and<br />

forecasts have been improved over the periodd <strong>2007</strong>-2011.<br />

• DO1-R1. Meteorology service infrastructures have been strengthened to<br />

meet 100% of demand<br />

• DO2-R2. Reliable statistical data for the management of various sectors<br />

and forecasts are available to 100% of the territory.<br />

Meteorology Data<br />

bank<br />

N. B : The establishment of a<br />

Meteorology Agency with autonomous<br />

management is essential for<br />

successful attainment of meteorology<br />

objectives<br />

Financing<br />

OUTPUT<br />

R1. A legal and regulatory framework has been put in<br />

place<br />

• A national meteorology agency is put in place over the period <strong>2007</strong> -2011<br />

• Meteorology laws are elaborated and approved<br />

• The meteorology policy and strategy are formulated in 2008<br />

R2. The meteorology service infrastructure has been<br />

rehabilitated and strengthened over the period <strong>2007</strong>-2011<br />

R3. Reliable meteorology data are available to 100% of the<br />

territory over the period <strong>2007</strong>-2011<br />

• 150 planned meteorology stations are rehabilitated (that is an annual<br />

growth rate of 18% of fully equipped and operational meteorology stations,<br />

increasing stations in good condition from 10% to 100% of the total number of<br />

200 stations)<br />

• 50 new meteorology stations are built over the period <strong>2007</strong>-2011<br />

• Three mechanisms have been put in place to improve data<br />

collection and processing over the period <strong>2007</strong>-2011 (One data<br />

processing centre is operational in 2008; 1 System for phenomena<br />

detection and weather remote parameter measuring is put in place; 1<br />

Data Distribution System Satellite (SADIS) is put in place over the period<br />

<strong>2007</strong>-2011)<br />

R4. Infrastructure is maintained • A maintenance mechanism combining the establishment of a<br />

maintenance workshop and involvement of districts in meteorology station<br />

surveillance is set up over the period <strong>2007</strong>-2011.<br />

R5. Meteorology service promotion for public and private<br />

sectors.<br />

R6. Human capacity is strengthened over the period <strong>2007</strong>-<br />

2011<br />

• A meteorology data dissemination system is put in place so as to have at<br />

least one weekly broadcast from 2009.<br />

• 15 meteorology executives and 55 technicians have been trained over<br />

the period <strong>2007</strong>-2011<br />

Monitoring<br />

&Evaluation /<br />

MININFRA<br />

District monograph<br />

- Meteorology Data<br />

bank<br />

Meteorology Service<br />

Annual Report<br />

Maintenance<br />

workshop<br />

ORINFOR<br />

(Private Press<br />

Agencies)<br />

MININFRA<br />

Respect action plan<br />

Financing<br />

- Respect action plan<br />

Availability of funds<br />

Availability of funds<br />

Budget<br />

Budget


39<br />

OVI<br />

numbe<br />

r<br />

OVI Formulation OVI Description Source of<br />

information<br />

OG1. Data from the Meteorology sector is sold from 2008<br />

so as to ensure self-sufficiency, at least partially.<br />

OD11.<br />

OD21<br />

R11<br />

R12<br />

The meteorology service infrastructure has been<br />

strengthened to meet 100% of demand<br />

Reliable meteorology data for the management of<br />

various sectors and forecast are available to 100% of<br />

the territory.<br />

A meteorology policy accompanied by a clear and<br />

relevant meteorology strategy are formulated and<br />

implemented over the period <strong>2007</strong>-2011.<br />

Meteorology laws are drafted, approved and<br />

implemented over the period <strong>2007</strong>-2011.<br />

Boolean indicator tracking if yes or not<br />

data from the meteorology sector is sold<br />

from 2008 so as to ensure selfsufficiency<br />

at least partially<br />

Boolean indicator tracking if yes or not<br />

meteorology service infrastructures have<br />

been strengthened so as to meet 100%<br />

of demand.<br />

Boolean indicator tracking if yes or not<br />

reliable meteorology data for the<br />

management of various sectors and<br />

forecast are available at least at about<br />

100%.<br />

Boolean indicator tracking if yes or not<br />

a meteorology policy accompanied by<br />

clear and relevant meteorology<br />

strategy are formulated and<br />

implemented<br />

Boolean indicator tracking if yes or not<br />

meteorology laws have been drafted,<br />

approved and implemented<br />

Responsible<br />

for data<br />

collection<br />

Frequency of<br />

data collection<br />

Baseline<br />

value in 2006<br />

(except other<br />

given specific<br />

indication)<br />

Target<br />

value for<br />

2011<br />

(except<br />

other<br />

given<br />

specific<br />

indication)<br />

MININFRA/H&U MININFRA Annually NA YES<br />

MININFRA/H&U MININFRA Annually NA YES<br />

MININFRA Reports MININFRA Annually NA YES<br />

MININFRA Reports MININFRA Annually NA YES<br />

MININFRA Reports MININFRA Annually NA YES<br />

Comments on availability of<br />

baseline value<br />

R13<br />

A national meteorology agency is established and is<br />

operational over the period <strong>2007</strong>-2011.<br />

Boolean indicator tracking if yes or not a<br />

national meteorology agency is in place<br />

and operational<br />

MININFRA Reports MININFRA Annually NA YES


40<br />

OVI<br />

numbe<br />

r<br />

OVI Formulation OVI Description Source of<br />

information<br />

R21 150 planned meteorology stations are<br />

rehabilitated (increasing stations in good<br />

condition from 10% to 100% of the total<br />

number).<br />

Ratio of the difference between the<br />

number of operational equipment of<br />

the meteorology sub-sector in 2011<br />

times one hundred divided by the<br />

equivalent number in 2006.<br />

MININFRA<br />

Reports<br />

Responsible<br />

for data<br />

collection<br />

Frequency of<br />

data collection<br />

MININFRA Annually NA<br />

Baseline<br />

value in 2006<br />

(except other<br />

given specific<br />

indication)<br />

10%<br />

Target<br />

value for<br />

2011<br />

(except<br />

other<br />

given<br />

specific<br />

indication)<br />

150<br />

100%<br />

Comments on availability of<br />

baseline value<br />

R22<br />

50 new meteorology stations are built over the<br />

period <strong>2007</strong>-2011<br />

Absolute number of new stations<br />

built<br />

MININFRA<br />

Reports<br />

MININFRA Annually NA 50<br />

R32<br />

Three mechanisms have been put in place to<br />

improve data collection and processing over<br />

the period <strong>2007</strong>-2011 (One data processing<br />

centre is operational in 2008 ; 1 System for<br />

phenomena detection and weather remote<br />

parameter measuring is put in place ; 1 Data<br />

Distribution System Satellite (SADIS) is put in<br />

place over the period <strong>2007</strong>-2011)<br />

It is possible to use the Boolean<br />

indicator tracking if yes or not there<br />

is a maintenance mechanism<br />

including its setting up.<br />

Absolute number mechanisms put in<br />

place and operational to improve<br />

data collection and processing<br />

MININFRA<br />

Reports<br />

MININFRA<br />

Reports<br />

MININFRA<br />

MININFRA<br />

Annually<br />

Annually<br />

NA<br />

NA<br />

YES<br />

3<br />

R41<br />

A maintenance mechanism combining the<br />

establishment of a maintenance workshop and<br />

involvement of districts in meteorology stations<br />

surveillance is put in place over the period<br />

<strong>2007</strong>-2011<br />

Boolean indicator tracking if yes or<br />

not a maintenance mechanism<br />

includes a setting-up mechanism<br />

MININFRA<br />

Reports<br />

MININFRA Annually NA YES<br />

R51<br />

R61<br />

A meteorology data dissemination system is<br />

put in place so as to have at least one weekly<br />

broadcast from 2009 (i.e. at least 52<br />

broadcasts per year)<br />

15 meteorology executives and 55 technicians<br />

have been trained over the period <strong>2007</strong>-2011<br />

Absolute number of broadcasts<br />

produced each year from 2009 and<br />

later<br />

Absolute number of executives and<br />

technicians trained over the period <strong>2007</strong>-<br />

2011<br />

ORINFOR<br />

Private Press<br />

Agencies<br />

MININFRA<br />

Archives<br />

MININFRA<br />

Reports<br />

MININFRA Annually NA 52<br />

MININFRA Annually ? 70<br />

including<br />

15<br />

executives.<br />

55<br />

technicians<br />

.<br />

Setting a baseline would be<br />

desirable before <strong>2007</strong>.


41<br />

APPENDIX 8: REACTION TO THE COMMENTS FROM MINECOFIN<br />

1) Ensure the link between the different outcomes/development objectives and the seven<br />

strategic areas: for instance we have 6DO-R while there are 7 strategic areas, are there<br />

some areas that are not concerned by the Transport Sector?<br />

ANSWER 1: YES, FOR EXAMPLE, THE DISCUSSIONS WITH THE WORLD BANK AND THE<br />

EUROPEAN UNION ACCORDING TO WHICH THE COMPONENT OF INCREASING THE VOLUME OF<br />

INFRASTRUCTURE SHOULD NOT REQUIRE THE SAME PRIORITY AS THE COMPONENT OF<br />

MAINTENANCE. NEITHER WAS THE COMPONENT OF ACCESSIBILITY PUT FORWARD. BUT<br />

COSTING WAS.<br />

An attempt to bring together (a simple analysis, to confirm if yes or not it is correct) DO-<br />

R and the MININFRA strategic objectives may provide orientation on adjustments and<br />

complements):<br />

- DO1-R1 –Ensure legal and regulatory institutional framework<br />

- DO2-R2 –Can it be made closer to: “increase the volume of infrastructure and/or<br />

increase accessibility”?<br />

ANSWER 2: (THIS OUTPUT WHICH IS RELATED TO THE FORMULATION AND IMPLEMENTATION<br />

OF THE STRATEGY –COMPONENT 1 – COULD BE RENUMBERED AS DO1-R1B); BECAUSE IT IS<br />

LINKED TO CAPACITY BUILDING. BUT THE DISTORTION IN THE NUMBERING APPEARS LATER<br />

WITH THE INTRODUCTION OF THIS NEW ASPECT FOLLOWING THE DISCUSSIONS WITH THE<br />

WORLD BANK. COMPONENT 2 RELATING TO INCREASING THE VOLUME HAS DISAPPEARED.<br />

- DO3-R3-Increase the volume of infrastructure and/or Ensure the sustainability of<br />

infrastructure?<br />

ANSWER 3 : THIS OUTPUT CONCERNS MAINTENANCE (COMPONENT 6). THERE IS A PROBLEM<br />

OF A DISCREPANCY IN NUMBERING (FOLLOWING ANSWER 2), WHICH WE PREFER TO KEEP AS<br />

SUCH.<br />

- DO4-R4-Ensure quality services?<br />

ANSWER 4 : THIS OUTPUT CONCERNS SECURITY (COMPONENT 7). THERE IS A PROBLEM OF A<br />

DISCREPANCY IN NUMBERING (FOLLOWING ANSWER 2), WHICH WE PREFER TO KEEP AS SUCH<br />

- DO5-R5-Reduce and control the cost …OK<br />

- DO6-R6-in relation with cross-cutting issues… OK<br />

2) DO6-R6: is not well formulated and does not clearly reflect the contribution of the<br />

transport sector to HIV/AIDS prevention, environment protection and gender equality.<br />

ANSWER 5: THERE HAS BEEN A REFORMULATION TO IMPROVE THE QUALITY OF THE<br />

INDICATOR.<br />

3) For R11: OVI « 4 analytical systems established within MININFRA” is not clear. Which<br />

sort of system is it?<br />

ANSWER 6 : THERE HAS BEEN A REFORMULATION TO IMPROVE THE QUALITY OF THE<br />

INDICATOR BY SPECIFYING THE AREAS OF CONCERN FOR THE WORLD BANK WHICH IS THE<br />

INITIATOR OF THE REFORMULATION OF THIS OUTPUT, NOTABLY POLICY FORMULATION ;<br />

STATISTICS ANALYSIS ; PLANNING AND M&E.<br />

4) For R12, which, apparently, concerns only studies, some OVI related to it go beyond the<br />

studies and cover the period after EDPRS; aren’t they integrated in the third PRSP<br />

generation? (Example: extension of the railroad from Isaka to Kigali built and operational<br />

from the year 2014, Akagera river made navigable by 2015, etc).<br />

ANSWER 7: THERE HAS BEEN A REFORMULATION TO IMPROVE THE QUALITY OF THE<br />

INDICATOR BY SPECIFYING THAT THIS IS PREPARATORY WORK; “PREPARATORY WORK IN


42<br />

ORDER TO FACILITATE EXTENSION OF THE RAILROAD FROM ISAKA TO KIGALI TO BE BUILT<br />

AND OPERATIONAL FROM THE YEAR 2014; PREPARATORY WORK IN ORDER TO FACILITATE A<br />

DRY PORT ON THE NORTHERN AND CENTRAL CORRIDORS (ISAKA, KAMPALA) TO BE BUILT<br />

AND OPERATIONAL FROM THE YEAR 2015. EXTENSION OF THE OIL PIPELINE FROM KAMPALA<br />

TO KIGALI”.<br />

5) Now, R13/DO3-R3 concerns only roads (that is why the airport and inland waterway/lake<br />

transport are included in R12/DO2-R2). But what is really the objective of R12/DO2-R2?<br />

It would be better either to clarify the formulation or change the OVI (see 4). Is it<br />

necessary to have something separate for non-road transport, or is it necessary to include it<br />

in R13/DO-R3 ?<br />

ANSWER 8 : THE CONSULTANT DID NOT UNDERSTAND THE MEANING OF THIS COMMENT, NOR<br />

DID HE PROVIDE ANY RESPONSE TO IT.<br />

--------------------------------------<br />

NB. COMMENTS IN THE FORM OF DIRECT ANNOTATION IN OTHER LOGFRAMES HAVE BEEN<br />

INCLUDED IN THE FINAL VERSION OF THESE TABLES.


43<br />

APPENDIX 9: REACTION FROM MININFRA TO THE COMMENTS FROM EU ON TRANSPORT<br />

LOGFRAME<br />

We should include in the Log Frame, under institutional strengthening, the formulation and<br />

implementation of a maintenance policy and prioritisation system. Actions will include data collection<br />

and creation of a prioritisation model (and a data base).<br />

The Classified road network includes National Roads, both paved and unpaved, and District roads<br />

which are either gravel or earth. The unclassified network is made up of rural feeder roads and tracks.<br />

The term Trunk Road should be replaced with National Road as it includes both paved and unpaved.<br />

The figures for the size of the road network are based on the DHV reclassification exercise and an<br />

estimation of the feeder road network at 8,500km. It is a priority of the Ministry to survey the feeder<br />

road network to establish accurate records of it’s size and condition.<br />

We should include in the Log Frame, under institutional strengthening, the formulation and<br />

implementation of a maintenance policy and prioritisation system.<br />

Lengths specified for Maintenance are cumulative as this is the only way to get correct cost figures as<br />

the unit cost (per km) is multiplied by the TOTAL length to give a total cost for the 5 years. This could<br />

be explained with a footnote.<br />

We need to check the figures for lengths of road to be maintained and rehabilitated included in the log<br />

frame as it’s unclear whether these should be for the baseline or unconstrained scenario.<br />

We do not have a baseline or any way of collecting data on Vehicle Operating Costs (VOC).<br />

Therefore this should be dropped from the Log Frame and we will rely on transport costs, for goods<br />

and passengers (container to Mombasa and a bus ticket to Kampala ).<br />

100 professional staff to be recruited will be in the district, approx 80, and in the Road Agency, approx<br />

20. They will all be responsible for planning and management of infrastructure development and<br />

maintenance contracts and supervision of works.<br />

Philippe needs to report on the reasons behind the formulation of the 2 nd generation FER.<br />

Philippe also needs to report on the reasons for Bugesara Airport.<br />

The establishment of Axle load control systems should be included as one of the activities under<br />

safety.<br />

The reduction in transport costs should be for a container to Mombasa and a bus ticket to<br />

Kampala and the reduction should be 10% rather than 30% which is too high.<br />

Richard and Amil will investigate the targets for maintenance and rehabilitation, whether they<br />

are for the baseline or unconstrained scenario and how achievable they are.<br />

The Akegera River scheme will include a feasibility study.<br />

Bridges have been included in road maintenance and rehabilitation and do not need a separate<br />

inclusion.<br />

Richard Smith<br />

Roads Expert<br />

MININFRA


APPENDIX 10: FIRST DRAFT OF THE PROVISIONAL VERSION OF THE <strong>ICT</strong> LOGFRAME– INTEGRATING THE TEN 2010-NICI PILLARS -<br />

44


45<br />

A. THE FIRST PART OF INITIAL VERSION WHICH REMAINS UNCHANGED<br />

Logic of intervention Objectively verifiable indicator Source of verification Assumptions (Risks)<br />

TIC : 2 GO OVI / 5 DO OVI<br />

(QUID DECENTRALISATION)<br />

GOAL / IMPACT / WIDER OBJECTIVE / GLOBAL OBJECTIVE<br />

The <strong>ICT</strong> service infrastructure sub-sector has GO1. The development of <strong>ICT</strong> infrastructure and services has contributed at the<br />

contributed to sustainable economic development rate of 16% 22 to the average annual growth of GDP fixed at least at 7.2% over the<br />

and poverty reduction in Rwanda over the period period <strong>2007</strong>-2011.<br />

<strong>2007</strong>-2011.<br />

(Or TIC GDP has doubled amounting to RWF 62 billion).<br />

GO2. The number of jobs created each year by the <strong>ICT</strong> sector increases from 7,000<br />

to 20,000 over the period <strong>2007</strong>-2011.<br />

PURPOSE / OUTCOME/ DEVELOPMENT OBJECTIVE<br />

<strong>ICT</strong> industry has been promoted and access of the DO1. The volume of investment in the <strong>ICT</strong> sub-sector will increase from X% to Y%<br />

population to <strong>ICT</strong> at the lowest cost has been over the period <strong>2007</strong>-2011.<br />

improved over the period <strong>2007</strong>-2011.<br />

DO2-a. 100% of the national territory has been covered by a Communication and<br />

OR<br />

digital radio/television broadcast network over the period <strong>2007</strong>-2011<br />

The volume and quality of <strong>ICT</strong> sub-sector<br />

infrastructure in Rwanda have been improved over<br />

the period <strong>2007</strong>-2011.<br />

DO2-b. X% of the national territory has been covered by the postal network over the<br />

period <strong>2007</strong>-2011<br />

DO3.a. The number of people who have access to communication services which is<br />

4% in 2005 and X% in 2006 has risen to 12% by 2011.<br />

DO3.b. Access to communication service access points shall be reduced to 5 km<br />

over the period <strong>2007</strong>-2011<br />

DO3.c. The percentage of Rwandans who have a mobile phone will increase from<br />

3.21% to 12% over the period <strong>2007</strong>-2011<br />

DO3.d. The percentage of Rwandans who have access to the Internet shall<br />

increase from 0.45% to 10% over the period <strong>2007</strong>-2011<br />

• DO4. The cost of access to telecommunication services has fallen at least by 50%<br />

over the period <strong>2007</strong>-2011 (the cost of the international bandwidth shall fall from<br />

USD 4000 to USD 900 over the period 2006-2011; the cost of access to the<br />

television channel shall decrease from USD X to USD Y over the period 2006-<br />

2011; the unit price for access to communication services shall fall from RWF 120<br />

to RWF 60).<br />

DO5. The percentage of beneficiaries satisfied with the improvement of the quality of<br />

<strong>ICT</strong> services has increased at least by X% over the period <strong>2007</strong>-2011<br />

• NIS statistical data base<br />

• BNR Annual Reports<br />

• RITA Database and report<br />

• Mininfra DB23<br />

RIEPA<br />

RURA<br />

Report<br />

IPOSITA<br />

NICI Plan Review Report<br />

RURA Report<br />

NIS<br />

RURA Report<br />

NIS<br />

NIS statistical data base<br />

RURA Report<br />

Support shall continue from the<br />

top in the government hierarchy.<br />

Sustainable and increased<br />

support from development<br />

partners<br />

An environment conducive to<br />

investment shall be further<br />

supported and developed<br />

Investment in the <strong>ICT</strong> sector<br />

shall be supported and<br />

increased.<br />

The cost of technology will<br />

continue decreasing<br />

Government continuous support<br />

to the promotion of rural areas<br />

and private sector investment<br />

Competition in <strong>ICT</strong> sector will be<br />

real; a stronger and independent<br />

regulator as well as the price of<br />

the international bandwidth<br />

22 The figures seem not to be realistic because in 2004, transport and <strong>ICT</strong> represented only about 8.1% of the GDP.<br />

23 For jobs, MININFRA will have to institute site reports.


46<br />

B. THE LAST PART OF <strong>ICT</strong> INITIAL LOGFRAME WHICH CHANGED<br />

Logic of intervention Objectively verifiable indicator Source of verification Assumptions<br />

(Risks)<br />

GENERAL OPERATIONAL OBJECTIVE<br />

GOO – GENERAL OPERATIONAL OBJECTIVE<br />

The efficiency and effectiveness of the processes of the<br />

Government of Rwanda to deliver applications, services and<br />

information through the judicious use of technology; as a<br />

cross-cutting approach, use of <strong>ICT</strong> will foster improvements in<br />

all sectors, including financial, legal, and regulatory and also<br />

in the social sectors. (re-check this)<br />

<strong>ICT</strong> sector (All pillars)<br />

1. The number of government institutions<br />

quoted (by RITA or RURA) deliver<br />

improved services and information to<br />

citizen and businesses has increased<br />

passing from X% to 80% of total<br />

government institutions within EDPRS<br />

period <strong>2007</strong>-2011<br />

2. The quality of services has improved<br />

resulting in 50 % of delivery time reduction<br />

within EDPRS period <strong>2007</strong>-201<br />

3. Percent of citizen who express<br />

satisfaction with improved services and<br />

access to information delivery has<br />

increased from X% to 80%.


47<br />

Logic of intervention Objectively verifiable indicator Source of verification Assumptions (Risks)<br />

PURPOSE / OUTCOME/<br />

DEVELOPMENT OBJECTIVE<br />

<strong>ICT</strong> industry has been promoted<br />

and access of the population to<br />

<strong>ICT</strong> at the lowest cost has been<br />

improved over the period <strong>2007</strong>-<br />

2011<br />

OR<br />

The volume of investment in the <strong>ICT</strong> sub-sector will increase from X% to Y%<br />

over the period <strong>2007</strong>-2011<br />

DO1.b The number of operators in the <strong>ICT</strong> sub-sector will increase from X to Y<br />

over the period <strong>2007</strong>-2011<br />

RIEPA<br />

An environment conducive to<br />

investment shall be further<br />

supported and developed<br />

The volume and quality of the <strong>ICT</strong><br />

sub-sector infrastructure in<br />

Rwanda have been improved over<br />

the period <strong>2007</strong>-2011<br />

DO2-a. 100% of the national territory has been covered by a Communication<br />

and digital radio/television broadcast network over the period <strong>2007</strong>-2011<br />

DO2-b. X% of the national territory has been covered by the postal network<br />

over the period <strong>2007</strong>-2011<br />

DO3.a. The number of people who have access to communication services<br />

which is 4% in 2005 and X% in 2006 has risen to 12% by 2011.<br />

DO3.b. Access to communication service access points shall be reduced to 5<br />

km over the period <strong>2007</strong>-2011<br />

DO3.c. The percentage of Rwandans who have a mobile phone will increase<br />

from 3.21% to 12% over the period <strong>2007</strong>-2011<br />

DO3.d. The percentage of Rwandans who have access to Internet shall<br />

increase from 0.45% to 10% over the period <strong>2007</strong>-2011<br />

RURA Report<br />

IPOSITA Report<br />

NICI Plna Review REport<br />

RURA Report<br />

NIS<br />

Investment in the <strong>ICT</strong> sector<br />

shall be supported and<br />

increased.<br />

The cost of technology will<br />

continue to decrease<br />

Government continuous<br />

support to the promotion of<br />

rural areas and private sector<br />

investment<br />

DO4. The cost of access to telecommunication services has decreased at least<br />

by 50% over the period <strong>2007</strong>-2011 (the cost of an international bandwidth shall<br />

fall from USD 4000 to USD 900 over the period 2006-2011 ; the cost of access<br />

to the television channel shall decrease from USD X to USD Y over the period<br />

2006-2011 ; the unit price for access to communication services shall fall from<br />

RWF 120 to RWF 60).<br />

DO5. The percentage of beneficiaries satisfied with the improvement of the<br />

quality of <strong>ICT</strong> services has increased at least by X% over the period <strong>2007</strong>-2011<br />

RURA Report<br />

NIS<br />

NIS statistical data base<br />

RURA Report<br />

Competition in <strong>ICT</strong> sector will<br />

be real ; a stronger and<br />

independent regulator as well<br />

as the price of the international<br />

bandwidth


48<br />

Logic of intervention Objectively verifiable indicator Source of verification Assumptions<br />

(Risks)<br />

SOO1 – SPECIFIC OPERATIONAL OBJECTIVE #<br />

1<br />

The capacity of the GoR to use <strong>ICT</strong> for<br />

decision making on all levels and as a<br />

means of improving services and<br />

information to the citizens has been<br />

improved by 2008<br />

KA # 1: Institutional and Legal (including<br />

CB)<br />

EQUIVALENT TO PILLARS: Egovernment<br />

and egovernance; Legal, Regulatory, and<br />

Institutional Provisions and Standards;<br />

Human Capacity Development; <strong>ICT</strong> in<br />

Education<br />

• Updated and improved legal and regulatory framework in<br />

place (through X number of Acts adopted; adoption of the<br />

communication master plan) by <strong>2007</strong> and over the period<br />

<strong>2007</strong> – 2011<br />

• Enhanced capacity in three leading institutions (Mininfra <strong>ICT</strong><br />

Services to formulate and follow up implementation of <strong>ICT</strong><br />

Policy; regulatory Capacity of RURA; coordination Capacity<br />

of RITA to NICI Plan) in place by 2008 and over the period<br />

2008 – 2011<br />

• Percent of middle to senior level civil servants trained<br />

in the various Government ministries and PSOs in the<br />

area of management, policy formulation, execution<br />

and monitoring passes from X% in <strong>2007</strong> to 80 %in<br />

2011


49<br />

Logic of intervention Objectively verifiable indicator Source of verification Assumptions<br />

(Risks)<br />

SOO2 – SPECIFIC OPERATIONAL<br />

OBJECTIVE # 2<br />

The communication facilities and<br />

diversification of the means of<br />

access through the utilization of<br />

appropriate telecommunication<br />

system has been improved<br />

KA # 2: Volume of Infrastructures<br />

EQUIVALENT TO PILLARS:<br />

Infrastructure, Equipment, and<br />

Content; Private Sector<br />

Development<br />

• The communication facilities and diversification of the<br />

means of access through the utilization of appropriate<br />

telecommunication system has improved (through<br />

installation of at least X number of post offices per District<br />

and 300 telecenters per Sector???; improvement of<br />

bandwidth which has increased from X Gbps to Y Gbps)<br />

within <strong>2007</strong>-2011 EDPRS period.<br />

• Karisimbi integrated project in place and providing network<br />

coverage of at least X% by 2011 (or earlier???)<br />

• X regional <strong>ICT</strong> infrastructure projects have been<br />

implemented within <strong>2007</strong>-2011 EDPRS period


50<br />

Logic of intervention Objectively verifiable indicator Source of verification Assumptions<br />

(Risks)<br />

SOO3 – SPECIFIC OPERATIONAL OBJECTIVE #<br />

3<br />

The government's ability to delivery<br />

services and information to citizens has<br />

been improved<br />

• The number of web based public services and<br />

government services to the citizens increases from<br />

X in <strong>2007</strong> to Y in 2011<br />

• At least X hospitals and Y health centers have fully<br />

adopted telemedicine practices by 2011.<br />

KA # 3: Service Delivery<br />

EQUIVALENT TO PILLARS: Social<br />

Development<br />

• Full implementation of Integrated Management<br />

Information Systems in X (or all) key social sectors<br />

by 2011<br />

• At least X % of Government Institutions are kinked to<br />

the national fiber backbone network by 2011


51<br />

Logic of intervention Objectively verifiable indicator Source of verification Assumptions<br />

(Risks)<br />

SOO4 – SPECIFIC OPERATIONAL OBJECTIVE # 4<br />

The amount of resources (cost, time) to delivery<br />

government services; reduction in the amount<br />

of resources government is improved<br />

KA # 4: Service Costs<br />

EQUIVALENT TO PILLARS: Economic<br />

Development<br />

• Tax management, budget management Human<br />

resource management, postal services and their<br />

related applications are automated by 2011<br />

• The number of automated parliamentary<br />

operations increases from X% in <strong>2007</strong> to Y%<br />

in 2011<br />

• The national information centre established by<br />

2011


52<br />

Logic of intervention Objectively verifiable indicator Source of verification Assumptions<br />

(Risks)<br />

SOO5 – SPECIFIC OPERATIONAL OBJECTIVE # 5<br />

The citizen's ability to gain access to<br />

services and information, particularly in the<br />

rural areas is improved<br />

KA # 5: Accessibility<br />

EQUIVALENT TO PILLARS: Rural and<br />

Community Access<br />

• installation of at least X number of post offices per<br />

District<br />

• installation of at least X number of telecenters (or<br />

Multipurpose Community Telecenters- MCT)<br />

• The number of free information access point has<br />

passed from X in <strong>2007</strong> to Y in 2011<br />

• The number of women enrolled in <strong>ICT</strong>-related<br />

educational and training program has increased<br />

from X in <strong>2007</strong> to Y in 2011


53<br />

Logic of intervention Objectively verifiable indicator Source of verification Assumptions<br />

(Risks)<br />

SOO6 – SPECIFIC OPERATIONAL OBJECTIVE # 6<br />

The investments in technology are fully<br />

deployed and maintained and to engage the<br />

private sector in partnerships which result in<br />

strengthening of both the <strong>ICT</strong> sector and the<br />

Government's ability to manage contracts<br />

KA # 6: Sustainability and maintenance<br />

EQUIVALENT TO PILLARS: Private Service<br />

Development<br />

• At least 5 new kinds of <strong>ICT</strong> based business and<br />

services are established (<strong>ICT</strong> business start up<br />

advisor center, a National Business development<br />

service network , <strong>ICT</strong> park and incubators, a web<br />

based Trade information center, software<br />

certification agency)<br />

• The number of trade point in Rwanda has<br />

increased from X trade points in <strong>2007</strong> to Y trade<br />

points in 2011<br />

• A 6 month vocational course on computer<br />

hardware targeting school leavers is developed<br />

within <strong>2007</strong>-2011 period<br />

• The number e-Commerce resource service<br />

centers (ERSCs) established has passed from X<br />

in <strong>2007</strong> to Y in 2011


54<br />

Logic of intervention Objectively verifiable indicator Source of verification Assumptions<br />

(Risks)<br />

SOO7 – SPECIFIC OPERATIONAL OBJECTIVE # 7<br />

The GoR's data protection laws and to<br />

insure integrity of national and individual<br />

information and reduce cybercrime<br />

KA # 7: Security or safety<br />

EQUIVALENT TO PILLARS: National<br />

Security, Law and Order<br />

• The number of national security staff trained on <strong>ICT</strong><br />

security issues has increased from X in <strong>2007</strong> to Y in<br />

2011<br />

• The number of <strong>ICT</strong> training labs set up has<br />

increased from X in <strong>2007</strong> to Y in 2011<br />

• The number of penetration of professional mobile<br />

radio in the security sector and associated agencies<br />

has increased from X in <strong>2007</strong> to Y in 2011<br />

• Number of SLA signed has passed from X by <strong>2007</strong><br />

to 100 by 2011