09.06.2014 Views

logframe 2007 - Research ICT Africa

logframe 2007 - Research ICT Africa

logframe 2007 - Research ICT Africa

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

40<br />

OVI<br />

numbe<br />

r<br />

OVI Formulation OVI Description Source of<br />

information<br />

R21 150 planned meteorology stations are<br />

rehabilitated (increasing stations in good<br />

condition from 10% to 100% of the total<br />

number).<br />

Ratio of the difference between the<br />

number of operational equipment of<br />

the meteorology sub-sector in 2011<br />

times one hundred divided by the<br />

equivalent number in 2006.<br />

MININFRA<br />

Reports<br />

Responsible<br />

for data<br />

collection<br />

Frequency of<br />

data collection<br />

MININFRA Annually NA<br />

Baseline<br />

value in 2006<br />

(except other<br />

given specific<br />

indication)<br />

10%<br />

Target<br />

value for<br />

2011<br />

(except<br />

other<br />

given<br />

specific<br />

indication)<br />

150<br />

100%<br />

Comments on availability of<br />

baseline value<br />

R22<br />

50 new meteorology stations are built over the<br />

period <strong>2007</strong>-2011<br />

Absolute number of new stations<br />

built<br />

MININFRA<br />

Reports<br />

MININFRA Annually NA 50<br />

R32<br />

Three mechanisms have been put in place to<br />

improve data collection and processing over<br />

the period <strong>2007</strong>-2011 (One data processing<br />

centre is operational in 2008 ; 1 System for<br />

phenomena detection and weather remote<br />

parameter measuring is put in place ; 1 Data<br />

Distribution System Satellite (SADIS) is put in<br />

place over the period <strong>2007</strong>-2011)<br />

It is possible to use the Boolean<br />

indicator tracking if yes or not there<br />

is a maintenance mechanism<br />

including its setting up.<br />

Absolute number mechanisms put in<br />

place and operational to improve<br />

data collection and processing<br />

MININFRA<br />

Reports<br />

MININFRA<br />

Reports<br />

MININFRA<br />

MININFRA<br />

Annually<br />

Annually<br />

NA<br />

NA<br />

YES<br />

3<br />

R41<br />

A maintenance mechanism combining the<br />

establishment of a maintenance workshop and<br />

involvement of districts in meteorology stations<br />

surveillance is put in place over the period<br />

<strong>2007</strong>-2011<br />

Boolean indicator tracking if yes or<br />

not a maintenance mechanism<br />

includes a setting-up mechanism<br />

MININFRA<br />

Reports<br />

MININFRA Annually NA YES<br />

R51<br />

R61<br />

A meteorology data dissemination system is<br />

put in place so as to have at least one weekly<br />

broadcast from 2009 (i.e. at least 52<br />

broadcasts per year)<br />

15 meteorology executives and 55 technicians<br />

have been trained over the period <strong>2007</strong>-2011<br />

Absolute number of broadcasts<br />

produced each year from 2009 and<br />

later<br />

Absolute number of executives and<br />

technicians trained over the period <strong>2007</strong>-<br />

2011<br />

ORINFOR<br />

Private Press<br />

Agencies<br />

MININFRA<br />

Archives<br />

MININFRA<br />

Reports<br />

MININFRA Annually NA 52<br />

MININFRA Annually ? 70<br />

including<br />

15<br />

executives.<br />

55<br />

technicians<br />

.<br />

Setting a baseline would be<br />

desirable before <strong>2007</strong>.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!