09.06.2014 Views

logframe 2007 - Research ICT Africa

logframe 2007 - Research ICT Africa

logframe 2007 - Research ICT Africa

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

49<br />

Logic of intervention Objectively verifiable indicator Source of verification Assumptions<br />

(Risks)<br />

SOO2 – SPECIFIC OPERATIONAL<br />

OBJECTIVE # 2<br />

The communication facilities and<br />

diversification of the means of<br />

access through the utilization of<br />

appropriate telecommunication<br />

system has been improved<br />

KA # 2: Volume of Infrastructures<br />

EQUIVALENT TO PILLARS:<br />

Infrastructure, Equipment, and<br />

Content; Private Sector<br />

Development<br />

• The communication facilities and diversification of the<br />

means of access through the utilization of appropriate<br />

telecommunication system has improved (through<br />

installation of at least X number of post offices per District<br />

and 300 telecenters per Sector???; improvement of<br />

bandwidth which has increased from X Gbps to Y Gbps)<br />

within <strong>2007</strong>-2011 EDPRS period.<br />

• Karisimbi integrated project in place and providing network<br />

coverage of at least X% by 2011 (or earlier???)<br />

• X regional <strong>ICT</strong> infrastructure projects have been<br />

implemented within <strong>2007</strong>-2011 EDPRS period

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!