logframe 2007 - Research ICT Africa
logframe 2007 - Research ICT Africa
logframe 2007 - Research ICT Africa
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
14<br />
OVI<br />
number<br />
R121<br />
OVI formulation OVI description Source of information Responsible for<br />
data collection<br />
Adoption of a Transport Master-plan<br />
for Rwanda by 2009.<br />
R122 Five projects of international<br />
connections were completed or<br />
initiated over the period <strong>2007</strong>-2011<br />
R123<br />
Three lake projects of development<br />
fluvio were completed (2) or were<br />
initiated (1) over the period <strong>2007</strong>-<br />
2011<br />
Summarized Boolean indicator<br />
tracking if yes or not Transport<br />
Master-plan for Rwanda has been<br />
defined and adopted by 2009<br />
The five planned projects are:<br />
Regional airports rehabilitated /<br />
upgraded; the new airport built at<br />
Bugesera and is operational from the<br />
year 2012; Extension of the railroad<br />
from Isaka to Kigali built and<br />
operational from the year 2014; A dry<br />
port on the Northern and central<br />
corridors (Isaka, Kampala) built and<br />
operational as the year 2015; and<br />
Extension of the oil pipeline from<br />
Kampala to Kigali<br />
The three planned projects are (6<br />
quays of accosting arranged on the<br />
Lake Kivu and other lakes from here<br />
the year 2010; A shipyard built on the<br />
Lake Kivu as from the year 2010;<br />
Akagera river made navigable as<br />
from the year 2015.<br />
Frequency of<br />
data collection<br />
Baseline<br />
value in 2006<br />
(except other<br />
given specific<br />
indication)<br />
MININFRA reports MININFRA Annual NA YES<br />
MININFRA through:<br />
• Feasibility study & design reports and<br />
contract documents<br />
• Signed contracts for construction<br />
• Bi-lateral / Regional agreements for<br />
construction<br />
• Project Completion reports<br />
MININFRA through:<br />
• Feasibility study & design reports and<br />
contract documents<br />
• Signed contracts for construction<br />
• Bi-lateral / Regional agreements for<br />
construction<br />
• Project Completion reports<br />
MININFRA Annual Na<br />
(non applicable)<br />
MININFRA Annual Na 3<br />
Target<br />
value for<br />
2011<br />
(except<br />
other given<br />
specific<br />
indication )<br />
5<br />
Comment on<br />
availability of<br />
baseline<br />
value