logframe 2007 - Research ICT Africa
logframe 2007 - Research ICT Africa
logframe 2007 - Research ICT Africa
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
25<br />
OVI<br />
number<br />
OVI formulation OVI description Source of<br />
information<br />
R2a1. A programme to facilitate access of all<br />
categories to energy has been defined and<br />
implemented over the period <strong>2007</strong>-2011.<br />
Boolean indicator tracking if yes or not a<br />
facilitation programme for access of all<br />
categories to energy has been defined<br />
and implemented.<br />
Responsible for<br />
data collection<br />
Frequency of<br />
data collection<br />
Baseline<br />
value in<br />
2006<br />
(except<br />
other given<br />
specific<br />
indication)<br />
Mininfra Report Mininfra Annually NA YES<br />
Target<br />
value for<br />
2011<br />
(except<br />
other given<br />
specific<br />
indication)<br />
Comment on availability<br />
of baseline value<br />
R2a2.<br />
R2b1.<br />
R31<br />
R41<br />
130 000 new households have access to<br />
electricity over the period <strong>2007</strong>-2011<br />
ELECTROGAZ new intervention plan has<br />
been successfully implemented (audit before<br />
implementation) over the period <strong>2007</strong>-2011<br />
20MW of energy have been saved annually<br />
over the period <strong>2007</strong>-2011 through: 800.000<br />
low consumption lights; 30 invertors, 10<br />
installations of low energy consumption<br />
equipment<br />
The number of new schools having access to<br />
energy is 1000 over the period <strong>2007</strong>-2011.<br />
The number of new households having<br />
access to electricity<br />
Boolean indicator tracking if yes or not<br />
the new ELECTROGAZ intervention<br />
plan has been successfully<br />
implemented.<br />
Absolute number of MW saved<br />
Absolute number of new schools having<br />
access to energy<br />
Mininfra DB<br />
Mininfra Report<br />
Mininfra Annually 70.000<br />
(en 2005)<br />
200.000<br />
(+130.000)<br />
Mininfra Report Mininfra Annually NA YES<br />
Mininfra DB<br />
Mininfra Report<br />
Mininfra DB<br />
Mininfra Report<br />
Mininfra Annually NA 20 MW<br />
Cfr CEDP Baseline, which<br />
sets the number of electricity<br />
subscribers at 70.187 at the<br />
end of 2005.<br />
Mininfra Annually ? 1000 A baseline is required<br />
R42<br />
The number of new health centres having<br />
access to energy is 120 over the period <strong>2007</strong>-<br />
2011.<br />
Absolute number of new health centres<br />
having access to energy<br />
Mininfra DB<br />
Mininfra Report<br />
Mininfra Annually ? 120 A baseline is required<br />
R43<br />
The number of new administration offices<br />
having access to energy is 300.<br />
Absolute number of new offices having<br />
access to energy<br />
Mininfra DB<br />
Mininfra Report<br />
Mininfra Annually ? 300 A baseline is required<br />
R51<br />
20 energy service, supply, installation, and<br />
maintenance companies have been created<br />
over the period <strong>2007</strong>-2011;<br />
Absolute number of energy, supply,<br />
installation and maintenance service<br />
companies created<br />
Mininfra DB<br />
Mininfra Report<br />
Mininfra Annually NA 20<br />
R52<br />
300 technicians have been trained over the<br />
period <strong>2007</strong>-2011<br />
Absolute number of technicians trained<br />
Mininfra DB<br />
Mininfra Report<br />
Mininfra Annually NA 300