logframe 2007 - Research ICT Africa
logframe 2007 - Research ICT Africa
logframe 2007 - Research ICT Africa
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
10<br />
Logic of intervention Objectively verifiable Indicator Source of verification Assumptions (Risks)<br />
Specific objectives by subsector<br />
and implementation or<br />
result indicator<br />
R15<br />
The cost of transport of<br />
passengers and goods nationally<br />
and internationally reduced by<br />
10% in real terms over the<br />
period <strong>2007</strong>-2011.<br />
R16<br />
A set of appropriated measures<br />
(3 kinds of measures) are in<br />
place so that the delivery of<br />
transport infrastructure and<br />
services has contributed to the<br />
fight against the Spread of<br />
HIV/AIDS, Environmental<br />
Degradation, and Gender<br />
Inequality over the period <strong>2007</strong>-<br />
2011.<br />
TRANSPORT : 10 OVI<br />
• Border and customs procedures simplified and standardized<br />
regionally.<br />
• Time of transit for goods and passengers reduced by 10% on<br />
National Road corridors.<br />
• The cost of container transport from Kigali to Mombassa<br />
reduced by 10% in real terms by 2011<br />
• The cost of a bus ticket from Kigali to Kampala reduced by<br />
10% in real terms by 2011<br />
• 4 service and rest areas with devices of fight against the<br />
AIDS were arranged on the corridors of the truck-drivers<br />
over the period <strong>2007</strong>-2011.<br />
• 5 clauses introduced to contract documents for protection of<br />
the environment, gender quality, HIV/AIDS prevention and<br />
employment creation.<br />
• At least 0.5 % of total amount contract dedicated to<br />
HIV/AIDS, Gender and environmental protection<br />
• National statistical report,<br />
• Corridor’s Agencies report,<br />
• Ports Authorities reports,<br />
• SSATP survey report<br />
• MININFRA standard construction<br />
contract<br />
• Signed contract documents<br />
• Contract progress and completion<br />
reports,<br />
• Corridor’s Agencies report<br />
• Survey to the international driver’s<br />
association<br />
• Regional co-operation,<br />
• Transport policy harmonized in the<br />
region<br />
• International Roads in good<br />
conditions<br />
• Govt support for customs reform and<br />
one stop border operational<br />
• Clauses adopted and enforced<br />
• Effective supervision of contracts<br />
• Fund of Construction of 4 services<br />
and rest areas on corridor’s roads