logframe 2007 - Research ICT Africa
logframe 2007 - Research ICT Africa
logframe 2007 - Research ICT Africa
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
33<br />
OVI<br />
number<br />
R45a11.<br />
R45a12.<br />
OVI formulation OVI description Source of<br />
information<br />
5 administrative buildings are built at central<br />
level<br />
5 administrative buildings are built at district<br />
level<br />
R45B11. 10 administrative buildings have been<br />
rehabilitated at central level.<br />
R45B12. 305 administrative buildings have been<br />
rehabilitated at district level<br />
R46. 5 areas16 have been appropriately 17<br />
restructured over the period <strong>2007</strong>-2011.<br />
R47a. 100% infrastructure sites have been<br />
accompanied by awareness raising campaign<br />
for all workers on the fight against AIDS over<br />
the period <strong>2007</strong>-2011<br />
Number of new administrative buildings built at<br />
central level<br />
Number of new administrative buildings built at<br />
District level<br />
Number of new administrative buildings rehabilitated<br />
at central level<br />
Number of new administrative buildings rehabilitated<br />
at District level<br />
Both qualitative and quantitative variable tracking if<br />
yes or not the expected number of areas has been<br />
restructured<br />
The ratio of the number of infrastructure sites which<br />
were accompanied by awareness raising campaign<br />
on the fight against AIDS times one hundred divided<br />
by the total number of sites constructed.<br />
Responsible for<br />
data collection<br />
Frequency of<br />
data collection<br />
Baseline<br />
value in<br />
2006<br />
(except<br />
other given<br />
specific<br />
indication)<br />
Mininfra Reports Mininfra Annually NA 5<br />
District Reports<br />
Mininfra DB<br />
Districts<br />
Mininfra DB<br />
Districts<br />
Mininfra DB<br />
Districts<br />
Mininfra<br />
Districts<br />
Mininfra<br />
Districts<br />
Mininfra<br />
Annually NA 5<br />
Annually NA 10<br />
Annually NA 305<br />
Target<br />
value for<br />
2011<br />
(except<br />
other given<br />
specific<br />
indication)<br />
Comment on<br />
availability of<br />
baseline<br />
value<br />
Mininfra DB Mininfra Annually ? 5 A baseline is<br />
required before<br />
the end of <strong>2007</strong>.<br />
Mininfra DB Mininfra Annually ? 100% A baseline is<br />
required before<br />
the end of <strong>2007</strong>.<br />
R47b.<br />
100% of studies on Housing and City<br />
Planning Infrastructure development have<br />
integrated the environment component over the<br />
period <strong>2007</strong>-2011<br />
The ratio of studies on Housing and City Planning<br />
infrastructure development, which have integrated<br />
the environment component times one hundred<br />
divided by the total number of cities.<br />
Mininfra DB Mininfra Annually ? 100% A baseline is<br />
required before<br />
the end of <strong>2007</strong>.<br />
R481<br />
280 technicians are trained over the period<br />
<strong>2007</strong>-2011<br />
Number of technicians trained<br />
MININFRA/Housing<br />
and City Planning<br />
Mininfra Annually NA 280<br />
R491<br />
A digital cartographic data base has been put in<br />
place<br />
Boolean indicator tracking if yes or not a digital<br />
cartographic data base is in place and is operational<br />
MININFRA/Housing<br />
and City Planning<br />
Mininfra Annually NA YES<br />
16 Although these seem to be few, in this case it is big areas such as Gitega or Kimisagara in Kigali that are targeted.<br />
17 The qualifier ‘appropriate’ means that 10% of new households have been connected to water and electricity; 30 linear km of roads have been improved; 10 % of houses in restructured areas are connected to drainage canals