<strong>New</strong> nursery schools for Feldkirch<br />
Modular nursery school system: high flexibility, short construction time,<br />
ecologically sound performance<br />
Floors, walls and ceilings were built with solid<br />
wooden elements, the large windows extend<br />
from floor to ceiling in some places.<br />
At the heart of the Vorarlberg education<br />
policy is the earliest possible<br />
provision of comprehensive play<br />
activities to our children. The need for<br />
nursery school group accommodation<br />
has risen sharply with the adoption by<br />
the regional government of its latest<br />
forward-looking nursery school education<br />
and teaching plan. In conjunction<br />
with the local Feldkirch council and<br />
architects Atelier Rainer + Amann, our<br />
response has been the development of<br />
a modular system for the cost-effective<br />
and rapid construction of nursery<br />
school rooms.<br />
pILot project successFULLy<br />
completed<br />
Three new modular nursery schools<br />
have already been erected in Feldkirch<br />
by <strong>Rhomberg</strong> as the general contractor.<br />
The buildings are built entirely of<br />
wood. Work on site started in June,<br />
completion followed in October 2010.<br />
Special characteRIstics<br />
The wooden construction involved<br />
the use of prefabricated wall panels<br />
with a high-quality natural finish. This<br />
allowed the entire wooden construction<br />
(floors, walls and ceilings) for each<br />
nursery school to be assembled in only<br />
two weeks. All recesses, penetrations<br />
and empty ducts for cables and pipes<br />
(electrical and heating, ventilation and<br />
sanitary fittings) were made and preinstalled<br />
in the factory.<br />
Elisabeth Frener<br />
"The whole building<br />
was constructed<br />
using dry materials –<br />
long drying out or curing<br />
times were therefore<br />
avoided. A detailed construction<br />
programme allowed different trades<br />
to work in parallel in confined spaces<br />
and ensured the smooth progress of<br />
the works in the shortest possible<br />
time. The repetition factor in the three<br />
nursery schools led to an optimisation<br />
of construction time and quality."<br />
Jürgen Heinlein<br />
Dates & facts<br />
Scope of work Construction of three nursery<br />
schools in wooden construction as a general<br />
contractor including detailed design<br />
Nursery school “Oberer Riegel” one exercise<br />
and three group rooms, social rooms, office<br />
Nursery school “Im Grisseler” one exercise<br />
and two group rooms, social rooms, office<br />
Nursery school “Alvierstrasse” Extension<br />
to existing building, two group rooms, social<br />
rooms, office<br />
Construction period June to September 2010,<br />
three months per nursery school<br />
Contract value about EUR 2.4 million in total<br />
Project manager Jürgen Heinlein<br />
The young artists each create an image of a beautiful life.<br />
"What do you need to be happy?"<br />
<strong>Rhomberg</strong> seeks dialoGUe with nURsery<br />
schools<br />
We wanted to ask the youngest in our communities for<br />
their opinions, suggestions and ideas on the theme of living<br />
quality to cast light on this edition of <strong>New</strong> <strong>Dimensions</strong> from<br />
all sides.<br />
The Feldkirch nursery school helped us in our project. The<br />
children answered our questions about the criteria for living<br />
quality with innumerable fascinating paintings – which did<br />
not make it easy for us to choose the best eight for our<br />
postcards.<br />
We would like to express our sincere thanks to all our little<br />
artists, the organisers and nursery school teachers.<br />
26<br />
NEW DIMENSIONS| GENERAL CONTRACTOR