2:25<br />

No passenger trains run on the line.<br />

2.13 LAND ZONING AND PLANNING<br />

The proposed <strong>Bengalla</strong> <strong>Mine</strong> development is located approximately 3 km west <strong>of</strong> Muswellbrook township and<br />

lies within the Muswellbrook Council Local Government Area. The provisions <strong>of</strong> three environmental planning<br />

instruments apply to the subject land; the Muswellbrook Local <strong>Environmental</strong> Plan 1985, the Hunter Regional<br />

<strong>Environmental</strong> Plan 1989 and the Hunter Regional <strong>Environmental</strong> Plan 1989 - Heritage. The <strong>Bengalla</strong> <strong>Mine</strong><br />

project has been reviewed in light <strong>of</strong> these relevant planning instruments and is considered to comply in all<br />

respects.<br />

Muswellbrook Local <strong>Environmental</strong> Plan 1985<br />

The local government land use zonings which apply to the project area are shown in Figure 2.14.<br />

The area to be affected by open cut mining and surface facilities is zoned 1 (a) Rural "A" and 7 (L1)<br />

Environment Protection General "L1" (Alluvial Area). A corridor <strong>of</strong> Zone No. 5 (b) Special Uses (Railways)<br />

passes through the subject area and will not be affected by the mine development except where the mine rail<br />

loop joins the existing Muswellbrook - Ulan Railway line.<br />

The objectives <strong>of</strong> Zone No. 1 (a) include the intention that actual or potential productive land should not be<br />

withdrawn from production. Objective (d) relating to Zone No. 1 (a) land specifically encourages mining to<br />

occur in an environmentally acceptable manner. Mining is a permissible form <strong>of</strong> development within this zone,<br />

subject to Development Consent being obtained.<br />

The objectives <strong>of</strong> Zone No. 7 (L1) are generally to ensure that prime alluvial and agricultural land is preserved<br />

for agricultural use and that developments <strong>of</strong> a non-agricultural nature will result in minimal environmental<br />

impact.<br />

Provision exists within Clause 17 (2)(b) <strong>of</strong> Muswellbrook Local <strong>Environmental</strong> Plan 1985 for consent to be<br />

granted for mining development in the 7 (L1) zone, provided the various conditions in Clauses 17, 34 (l)(b) and<br />

35 are satisfied. These conditions relate to Council's assessment <strong>of</strong> likely environmental impact resulting from<br />

the development, whether the development is permissible in an adjoining rural zone and whether the land is<br />

genuinely a physical part <strong>of</strong> the alluvial plain. The proposed development is considered to meet the<br />

BENGALLA EIS. F156<br />

NOVEMBER <strong>1993</strong>