13.06.2014 Views

Development and Verification of Nuclear Calculation Methods for ...

Development and Verification of Nuclear Calculation Methods for ...

Development and Verification of Nuclear Calculation Methods for ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

- 4 -<br />

Page<br />

7. CEB, A Cell Burn-up Programme 37<br />

7.1. The Isotopic Burn-up Method 37<br />

7. 2. The Burn-up Procedure BURN , 38<br />

7.3. The CEB Programme 40<br />

8. CDB, A Combined Cell Collision Probability <strong>and</strong> Over-all<br />

Diffusion Theory Burn-up Programme 42<br />

8.1. The Local - Global Coupling Method 42<br />

8. 2. Non-Uni<strong>for</strong>m Doppler <strong>and</strong> Danc<strong>of</strong>f Effects 45<br />

8.3. The CDB Programme 47<br />

9. <strong>Verification</strong>; <strong>Calculation</strong>s Compared with Measurements <strong>for</strong><br />

the Yankee Reactor 49<br />

9.1. Description <strong>of</strong> the Yankee Core 49<br />

-—__9 JL 2. Fuel Sample Measurements 50<br />

10. Unit Cell <strong>Calculation</strong>s 52<br />

10.1. Unit Cell Description 52<br />

10. 2. Treatment <strong>of</strong> Fission Products 52<br />

10.3. <strong>Calculation</strong> Procedure 53<br />

10.4. Reactivity Characteristics 54<br />

10.5. Isotopic Abundances 55<br />

10.6. Isotopic Concentrations 56<br />

11. Over-all <strong>Calculation</strong>s 57<br />

11.1. Quarter Core <strong>and</strong> Assembly Descriptions 58<br />

11.2. Treatment <strong>of</strong> Non-Fuel Regions 58<br />

11.3. <strong>Calculation</strong> Procedure 60<br />

11.4. Reactivity Conditions 61<br />

11.5. Assembly Average Burn-ups <strong>and</strong> Isotopic Inventories .. 62<br />

11.6. Isotopic Distributions Across Some Assemblies 63<br />

11.7. Isotopic Inventories <strong>of</strong> Selected Fuel Rods 67<br />

12. Single Assembly <strong>Calculation</strong>s 69<br />

12.1. <strong>Calculation</strong> Procedure 69<br />

12.2. Isotopic Distributions Across the Assembly 70<br />

12.3. Plutonium Build-up in Centre <strong>and</strong> Corner Rods 71<br />

12.4. Isotonic Inventories <strong>of</strong> Selected Fuel Rods 74

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!