16.06.2014 Views

Barnsley CCG Mins 12 April 12.pdf - NHS Rotherham

Barnsley CCG Mins 12 April 12.pdf - NHS Rotherham

Barnsley CCG Mins 12 April 12.pdf - NHS Rotherham

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>NHS</strong> BARNSLEY<br />

The Commissioner for Quality Improvement<br />

Framework would continue to operate in 20<strong>12</strong>/13 and<br />

the report listed the value of CQUINS Schemes agreed<br />

with each provider.<br />

It was emphasised that the robust monitoring<br />

arrangements already in place with BHNFT and<br />

SWYPFT would continue during 20<strong>12</strong>/13 based on<br />

monthly contract review meetings.<br />

BCAC <strong>12</strong>/60<br />

<strong>NHS</strong> BARNSLEY SINGLE INTEGRATED PLAN<br />

The Assistant Chief Operating Officer – Service<br />

Improvement referred to the update report relating to<br />

the Single Integrated Plan which had been submitted<br />

to the <strong>NHS</strong> South Yorkshire and Bassetlaw Cluster in<br />

March 20<strong>12</strong>.<br />

The SIP incorporated the national requirements set out<br />

in the Department of Health Operating Framework for<br />

20<strong>12</strong>/13 together with <strong>NHS</strong> <strong>Barnsley</strong>’s local strategic<br />

goals. The document was supported by a suite of<br />

supporting submissions as follows:-<br />

QIPP, including organisational transition milestones;<br />

Workforce;<br />

Finance;<br />

Activity;<br />

Operating Framework Outcomes Trajectories;<br />

Plan on a Page.<br />

Particular attention was drawn to the Plan on a Page<br />

appended to the report. This identified the specific<br />

actions within the Plan which it was proposed to<br />

pursue in 20<strong>12</strong>/13 in respect of the seven specific<br />

initiatives on which the Plan was based. This<br />

represented the key actions to be taken by <strong>NHS</strong><br />

<strong>Barnsley</strong> in conjunction with partner organisations to<br />

improve quality and deliver the 20<strong>12</strong>/13 QIPP<br />

Programme.<br />

The second draft of the SIP had been submitted to the<br />

Cluster and would form part of the <strong>NHS</strong> South<br />

Yorkshire and Bassetlaw SIP submission to the North<br />

of England SHA. Feedback on the second draft was<br />

currently awaited.<br />

L:\Cluster Board\Cluster Board 20<strong>12</strong>\20<strong>12</strong> 05 21\19 - <strong>Barnsley</strong> <strong>CCG</strong> <strong>Mins</strong> <strong>12</strong> <strong>April</strong> <strong>12</strong>.doc<br />

<strong>NHS</strong> <strong>Barnsley</strong>, local leader of the <strong>NHS</strong>. The legal name of <strong>NHS</strong> <strong>Barnsley</strong> is <strong>Barnsley</strong> Primary Care Trust.<br />

8

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!