18.06.2014 Views

IWMP-1 - Commissionerate of Rural Development Gujarat State ...

IWMP-1 - Commissionerate of Rural Development Gujarat State ...

IWMP-1 - Commissionerate of Rural Development Gujarat State ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

DETAILED PROJECT REPORT (DPR) 2009-10<br />

The main agri. Crop <strong>of</strong> the taluka is bajara<br />

Bajra Productivity (Kg / Ha)<br />

The Antrol project area has low productivity because <strong>of</strong> the following reasons:<br />

i) Full dependence on monsoon:<br />

Antrol village is dependent on monsoon. Water is essential input in agriculture. Due to the absence <strong>of</strong> proper irrigation facility,90% <strong>of</strong><br />

the total cultivated area depends on the uncertain monsoon. Therefore, the suceess or failure <strong>of</strong> the monsoon determines the success or<br />

failure <strong>of</strong> agriculture production.The rainfall is unreliable due to two factors: untimely and inadequate.<br />

PIA – DWDU, BANASKANTHA _ANTROL CLUSTER Page 34

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!