zehnder nova
zehnder nova
zehnder nova
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
Technical parameters / Vertical models<br />
<strong>zehnder</strong> <strong>nova</strong> completto - <strong>zehnder</strong> <strong>nova</strong> durchbruch<br />
When ordering radiators with lateral connections,<br />
it is always necessary to indicate on which side the connections will be located (left or right).<br />
Completto<br />
NV NVL NVV<br />
34*<br />
2<br />
2<br />
3<br />
3<br />
4<br />
4<br />
2 3 4<br />
35<br />
V<br />
50<br />
R<br />
Innengew. Size of female R 1/2" thread R 1 /2“<br />
26<br />
45<br />
26<br />
58<br />
26<br />
92<br />
The drawing shows left-side connection.<br />
Durchbruch<br />
3 4<br />
2<br />
NV NVL NVV<br />
118*<br />
35<br />
Innengew. Size of female R 1/2"<br />
50 thread R 1 /2“<br />
26<br />
26<br />
26<br />
V R<br />
45<br />
58<br />
92<br />
The drawing shows left-side connection.<br />
*The valve location may be modified per request (for an additional cost);<br />
standard location – 118 mm from the radiator’s top or bottom edge.<br />
V = water supply, R = water return<br />
Distance to the wall and distance from the wall to connection centerline depend upon mounting mode and mounting type.<br />
19