Time to complete:<br />
35 days<br />
Cost to complete: XCD 350<br />
Comment:<br />
Flat fee for industrial connections XCD 350<br />
Procedure<br />
7<br />
Request water service<br />
Time to complete:<br />
Cost to complete:<br />
Comment:<br />
1 day<br />
no charge<br />
In St. George’s, most buildings connect to the sewerage system. Outside <strong>of</strong> St. George’s,<br />
septic tanks are used.<br />
Procedure<br />
8<br />
Receive water inspection<br />
Time to complete:<br />
Cost to complete:<br />
Comment:<br />
1 day<br />
no charge<br />
In St. George’s, most buildings connect to the sewerage system. Outside <strong>of</strong> St. George’s,<br />
septic tanks are used.<br />
Procedure<br />
9<br />
Obtain Water and Sewage Connection<br />
Time to complete:<br />
7 days<br />
Cost to complete: XCD 120<br />
Comment:<br />
In St. George’s, most buildings connect to the sewerage system. Outside <strong>of</strong> St. George’s,<br />
septic tanks are used.<br />
Procedure<br />
10<br />
Obtain Fixed Telephone Line<br />
Time to complete:<br />
7 days<br />
Cost to complete: XCD 250<br />
Comment:<br />
56