05.07.2014 Views

Doing Business 2009 - Government of Grenada

Doing Business 2009 - Government of Grenada

Doing Business 2009 - Government of Grenada

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Time to complete:<br />

35 days<br />

Cost to complete: XCD 350<br />

Comment:<br />

Flat fee for industrial connections XCD 350<br />

Procedure<br />

7<br />

Request water service<br />

Time to complete:<br />

Cost to complete:<br />

Comment:<br />

1 day<br />

no charge<br />

In St. George’s, most buildings connect to the sewerage system. Outside <strong>of</strong> St. George’s,<br />

septic tanks are used.<br />

Procedure<br />

8<br />

Receive water inspection<br />

Time to complete:<br />

Cost to complete:<br />

Comment:<br />

1 day<br />

no charge<br />

In St. George’s, most buildings connect to the sewerage system. Outside <strong>of</strong> St. George’s,<br />

septic tanks are used.<br />

Procedure<br />

9<br />

Obtain Water and Sewage Connection<br />

Time to complete:<br />

7 days<br />

Cost to complete: XCD 120<br />

Comment:<br />

In St. George’s, most buildings connect to the sewerage system. Outside <strong>of</strong> St. George’s,<br />

septic tanks are used.<br />

Procedure<br />

10<br />

Obtain Fixed Telephone Line<br />

Time to complete:<br />

7 days<br />

Cost to complete: XCD 250<br />

Comment:<br />

56

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!