amount of the organic leaving the system through the aqueous raffinate solution.<br />

Some of the methods used have included operational adjustments,<br />

Jameson Cell, coalescing packs and picket fencing. Each of these solutions<br />

has had some effect on the amount of organic entrainments lost through the<br />

raffinate. Implementation of the methods above has led to significantly<br />

reduce organic entrainment at two Phelps Dodge, SXEW plants in New<br />

Mexico. Similar methods were adopted at other Phelps Dodge sites with<br />

continued success. This paper provides insight as to the methods tested and<br />

results recorded for the two New Mexico sites.<br />

2:45 PM<br />

The Effect of Particle Size and Other Process Variables in the Stripping<br />

of Gold Cyanide from Activated Carbons<br />

F. Elnathan, S. Zheng, C. Lin and J. Miller; Metallurgical Engineering<br />

Department, College of Mines and Earth Sciences University of Utah, Salt<br />

Lake City, UT<br />

Activated carbon is being used extensively for the recovery of gold from<br />

cyanidation plants. However, gold losses on fine activated carbon particles<br />

and the attendant high carbon inventories are quite significant. The effect of<br />

particle size and other process variables on the stripping of gold cyanide from<br />

activated carbon has been studied and will be discussed with respect to chemistry<br />

and procedures for elution.<br />

3:05 PM<br />

Hydrometallurgical Design Considerations at the Safford Leach Project<br />

L. Todd; Freeport McMoRan Americas, Safford, AZ<br />

The Safford Leach Project located in Graham County, Arizona began construction<br />

in 2006 and will begin production in early 2008 at an annual design<br />

production rate of 109,000 tonnes of cathode copper. The project includes<br />

open pit mining, three-stage crushing, agglomeration with sulfuric acid,<br />

conveyor stacking, heap leaching, solution extraction and electrowinning to<br />

produce cathode copper from low-grade oxide ores. The project employs a<br />

number of design features to control project capital and operating costs and<br />

incorporates experience from existing properties. Design considerations of<br />

the hydrometallurgical recovery circuit are discussed in this paper.<br />

3:25 PM<br />

Improvement of Silver Leaching from High Silver Grade Ores Using<br />

the Celp<br />

G. Deschenes; CANMET, Ottawa, ON, Canada<br />

The leaching of silver from high purity silver, high purity silver minerals<br />

(acanthite, stephanite and pyrargyrite) and a mixture of silver minerals was<br />

determined under various conditions and compared to a new leaching process<br />

called “CANMET Enhanced Leaching Process (CELP)”. In the absence of<br />

sulphide minerals, increased dissolved oxygen of the slurry produced the<br />

fastest silver leaching kinetics. For a slurry containing acanthite, a 23% improvement<br />

in silver extraction (from 76% to 99%) was obtained with the<br />

CELP whereas silver extraction increased from 75% to 90% for the slurry<br />

with pyrargyrite. No improvement was obtained for the slurry with stephanite<br />

(99% extraction in 72 hours). However, the silver leaching rate was much<br />

faster with the CELP. The slurries containing the mixtures of minerals<br />

showed improvements of 21% Ag (from 75% to 96%) and 37% Ag (from<br />

56% to 93%) with the CELP. Leaching of a high grade gold/silver ore with<br />

the CELP resulted in higher silver and gold extractions while using a lower<br />

cyanide concentration.<br />

3:45 PM<br />

Electrochemical Study of Gold Cementation onto Copper in Thiosulfate<br />

Solutions<br />

J. Lee 1 and B. Hiskey 2 ; 1 Newmont Metallurgical Services, Newmont<br />

Mining, Englewood, CO and 2 Materials Science and Engineering, University<br />

of Arizona, Tucson, AZ<br />

The electrochemistry of gold cementation in thiosulfate solution with rotating<br />

disk electrode and electrochemical quartz crystal nanobalance has been<br />

investigated. Sodium thiosulfate of 0.25M solution is used for standard condition<br />

at pH 9.5 and initial gold and copper concentrations are changed.<br />

Mixed potential was recorded under various conditions to investigate passivation<br />

phenomena. The characteristics of the potential curves vary according to<br />

the parameters showing different passivation patterns. Evans’ diagrams were<br />

plotted by superimposing polarization diagrams of the gold reduction and<br />

copper oxidation. Corrosion currents increased with increasing gold concentration,<br />

disk rotating speed, and thiosulfate concentration as expected by<br />

kinetic study.<br />

32<br />

Mineral Valuation:<br />

Recent Case Histories and Analysis of Methods<br />

2:00 PM • Monday, February 25<br />

Chairs: E. Moritz, Gustavson Associates, Boulder, CO<br />

J. Gustavson, Gustavson Associates, Boulder, CO<br />

2:05 PM<br />

When Partial Takings Take More Than You Think<br />

R. Frahme; Appraisal, Gustavson Associates, Boulder, CO<br />

Appraisers are often asked to develop an opinion of the value of a partial taking.<br />

It is incumbent upon the appraiser, in the review of the condemnation<br />

documents, to form an independent opinion of the larger parcel(s), the part(s)<br />

to be taken and the remainder(s). Sometimes, the project causes the remainder(s)<br />

to have no economic value. In such cases, the purported “partial taking”<br />

may be tantamount to a total taking and must be appraised as such. This<br />

paper relates some of an appraiser’s experiences in such determinations.<br />

2:25 PM<br />

Use of Comparables Sales in Appraising Coalbed Methane Properties<br />

E. Moritz; Gustavson Associates, Boulder, CO<br />

There has been a surge in interest in the acquisition and development of<br />

coalbed methane properties. Depending on the location, coalbed methane<br />

projects require economies of scale and other considerations in order to be<br />

attractive. The appraisal of such acreage can be complex especially if the<br />

acreage is undeveloped and some distance from production. This paper<br />

describes the use of comparable sales as one method to approach a value in<br />

the appraisal of coalbed methane properties. Case histories from certain areas<br />

of the Rocky Mountains are presented.<br />

2:45 PM<br />

Property in Transition — Appraisal of Mining and Upscale Residential<br />

Use, Saguaro National Park, AZ<br />

J. Gustavson; Gustavson Associates, Boulder, CO<br />

The claim named Comet 1 is located on Yuma Mine Road near Tucson. The<br />

Saguaro National Park nearly surrounds the parcel with unfriendly, private<br />

neighbors to the north. A Validation Examination was provided. Patenting<br />

was recommended by BLM for gold-lead mining. Interior found no legal reason<br />

why the mining patent would not be issued. Appraisal includes other<br />

value since residential land value will surpass that of mining. Maximally productive<br />

use then changes to residential. FMV is estimated as the sum of transitional<br />

mining and long-term residential use. The former was estimated on a<br />

lease basis similar to appraisal in temporary takings, where Fair Market<br />

Rental Value may be estimated. Claim changed to residential use after 5 years<br />

of mining. Adjustment was made for availability of access through mining<br />

use. Cost of access by necessity and construction of road are included in the<br />

mining use. Reclamation for residential purpose is included. Value was adjusted<br />

based on appreciation in Tucson residential market. The transitional<br />

value and the long-term value were added, yielding the FMV. Both private<br />

owner of claim and NPS agreed to the FMV for purchase by the NPS.<br />

Mining & Exploration: Surface Mining: Big Pits<br />

2:00 PM • Monday, February 25<br />

Chair: T. Swendseid, Phelps Dodge Sierrita Inc, Green Valley, AZ<br />

2:05 PM<br />

Suncor’s Big Rocks, A review of mine productivity initiatives<br />

L. Hale; Mining, Suncor Energy, Fort McMurray, AB, Canada<br />

Suncor Energy operates a large open pit mine as part of an integrated oil production<br />

facility in Northern Alberta. The 2008 mine plan calls for over 450<br />

million tonnes. Mining Oilsand presents a unique set of challenges and a<br />

combination of specialized equipment and mining techniques make this an<br />

interesting application of technology. This paper will introduce Suncor<br />

Energy and review our mine hauler tire life program and a number of productivity<br />

initiatives that were successful in allowing our mine to meet our aggressive<br />

growth and production plans.