FOUNDATIONS<br />

Civil engineer and grout specialist<br />

Sub-soil testing / minimum depth consideration<br />

Concrete formulation and curing time<br />

Curb height / load bearing footing shape<br />

Foundation bolts and rebar<br />

“Deep block” rule of thumb: 5X weight<br />

Concrete preparation for grout<br />

Translational = in-phase Torsional = out-of-phase<br />

Vibratory effects on adjacent structures / members<br />

Arya / O’Neill / Pincus “Design of Structures and<br />

Foundations for Vibrating Machines” 1979 Gulf<br />

Publishing<br />

Brad Cassolato, P.Eng. WCI Ltd. 403-475-2534 cassolato@shaw.ca<br />