CARDS TWINNING PROJECT FICHE
CARDS TWINNING PROJECT FICHE
CARDS TWINNING PROJECT FICHE
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
other stakeholders is well<br />
defined<br />
meetings<br />
At local (governorate) level;<br />
pilot in a governorate<br />
- Work flow and<br />
performance of the<br />
Labour Inspectorate at the<br />
local level is developed;<br />
- Work performance<br />
improvement plan for the<br />
labour inspectorate at<br />
governorate level is<br />
prepared (including<br />
relevant institutional and<br />
human capacities' reform<br />
measures);<br />
- Organizational<br />
modifications of modes of<br />
operation of the labour<br />
inspectorate and other<br />
actors are initiated;<br />
- Relevant human<br />
capacities' reform<br />
measures are initiated;<br />
- Work performance of<br />
Labour Inspectorate of the<br />
selected governorate is<br />
improved against well<br />
defined benchmarks;<br />
- Evaluation report on pilot<br />
results is developed;<br />
- Performance reports are<br />
produced<br />
- Human Resource<br />
development plan is<br />
formulated and put into action<br />
- Train the trainer is conducted<br />
- Set of training materials and<br />
guidelines are developed.<br />
25