<strong>TEXMACO</strong> <strong>LIMITED</strong><br />
An ISO 9001 Company<br />
Hydro-Mechanical and Steel Structural Division<br />
A Symphony<br />
in Engineering Excellence
Importance of Hydro Power for targeted growth<br />
‣ Hydro Power represents important source of energy, accounting for some 20% of all world electricity<br />
supply.<br />
‣ Hydro electricity is a clean and renewable source of energy. As per national electricity policy,maximum<br />
emphasis is on full development of the feasible hydro potential in the country.<br />
‣ Hydro Power Potential in the Country:<br />
- Potential - 2,50,000 MW<br />
- Present Capacity - 27,000 MW representing barely 11% of Potential.<br />
There is an urgent need to augment Hydro Power Capacity, GOI, therefore, has launched Hydro Power<br />
initiative for 50,000 MW in May, 2003<br />
‣ Hydro - thermal mix of 50 : 50 in 1960 has come down to 25 : 75 at present against an optimal mix of<br />
40 : 60, resulting a serious imbalance in power system.<br />
‣ Hydro power has distinct advantage over other form of commercial power and is the energy source of<br />
future.<br />
‣ Out of 50,000 MW initiative launched by GOI,around 70% of project sites are in north eastern / eastern<br />
region.<br />
‣ Texmaco is best placed logistically to partner the Government of India in tapping these huge hydel<br />
resources scheduled to be developed in 11 th & 12 th plan periods.
Texmaco’s Growth<br />
• Texmaco has grown to multi-disciplinary engineering complex in last 67<br />
years and are serving to the core infrastructure projects.<br />
• Promoted by the renowned Industrial House of Birlas, Texmaco is market<br />
leader in the field of Hydro-Mechanical Equipment, Railway Freight Cars<br />
and Steel Foundry Products.<br />
• It is also a leading producer of Industrial Boilers, Sugar Mill Machinery<br />
and other engineering products to International Standards, significantly<br />
contributing to development of infrastructure of the Nation.<br />
• It has an outstanding success record in execution of prestigious mega<br />
projects financed by National and International Institutions such as<br />
World Bank, Asian Development Bank etc.
Infrastructure Facilities<br />
The Company is situated in Kolkata, comprising five manufacturing units. Around<br />
2000 Workmen and Staff are manning these Works.<br />
Area<br />
PARTICULARS<br />
AGARPARA WORKS<br />
SODEPUR WORKS<br />
PANIHATI WORKS<br />
BELGHARIA WORKS<br />
AREA UNDER SHED WITH<br />
CRANEAGE FACILITY<br />
78,000 Sq.m<br />
20,994 Sq.m<br />
11,330 Sq.m<br />
74,200 Sq.m<br />
OPEN AREA FOR<br />
STORAGE<br />
84,664 Sq.m<br />
96,365 Sq.m<br />
40,094 Sq.m<br />
28,600 Sq.m<br />
TOTAL<br />
1,84,524 Sq.m<br />
2,49,723 Sq.m<br />
• 10,000 MT of steel of various sections, sizes and specifications can be stored in<br />
the yard.<br />
• Average 5000 MT of assorted steel materials & components are received and<br />
despatched every month.
Texmaco’s role in the field of Hydro Power Sector<br />
‣ <strong>TEXMACO</strong> <strong>LIMITED</strong> entered in the field of Design, Manufacture, Supply, Erection &<br />
Commissioning of Hydro-mechanical Equipment by signing a Technical Collaboration<br />
Agreement with VOEST ALPINE of Austria in 1954. Since then, <strong>TEXMACO</strong> has executed<br />
large number of contracts in India and abroad for Design, Manufacture, Supply, Erection &<br />
Commissioning of Hydro-mechanical Equipment involving different types of Gates,<br />
Penstock, Cranes / Hoists, Trash Rack Cleaning Machine etc.<br />
‣ Over the years, <strong>TEXMACO</strong> has developed in-house expertise in Design and Manufacturing,<br />
based on CAD and CAM techniques and has erected and commissioned equipment at<br />
some of the World’s most difficult sites. <strong>TEXMACO</strong> today justifiably can be compared to<br />
the best in the World for these activities, which is quite evident by award of jobs funded by<br />
International Agencies like World Bank, ADB and others.<br />
- Texmaco has one of the best infrastructure, manufacturing capabilities including<br />
CNC machining etc with in-house testing and inspection facilities meeting stringent<br />
QA plans.<br />
- Texmaco is managed by well qualified and experienced Managers, Engineers and<br />
skilled workforce for manufacturing and erection / commissioning activity.<br />
- Texmaco has also successfully undertaken jobs for rehabilitation of old Hydro<br />
Plants.
chievement of Hydro-mechanical Division of Texmaco in last six decades<br />
• Projects executed / under execution : 62<br />
in India & abroad<br />
• Cumulative Capacity : 10,333 MW (Which is 33% of total<br />
hydel capacity of India<br />
• Cumulative tonnage of Steelwork : 1,06,555 t.<br />
• Radial Gate : Largest size of 15.0 m x 21.79 m<br />
executed for Chamera Stg-II H E<br />
Project of NHPC.<br />
: 88.59 Mtr. High Head Radial Gates<br />
under execution for Subansiri<br />
Lower H E Project<br />
• Single largest Hydro –mechanical Package : Around Rs.320 Crore under<br />
execution for Subansiri Lower HE P.
List of Hydel Projects Executed / Under Execution<br />
Name of the Project<br />
State/Country<br />
Capacity in<br />
MW<br />
Rupar Barrage Project<br />
Panchet Dam<br />
Rihand Dam Project<br />
Obre Dam Project<br />
Hirakud Dam<br />
Ramganga River Project<br />
Kyrdemkulai H E Project<br />
Augs Ii H E Project<br />
Lower Lagyap H E Project<br />
N’kula Falls ‘B’ H E Project<br />
Jaldhaka H E Project<br />
Wadi Ghan Dam<br />
Tenom Pangi Power Project<br />
Gumti Project<br />
Salal Stg-i H E Project<br />
Khandong H E Project<br />
Karbi Langpi H E Project<br />
Umium Umtru Stg-ii<br />
Rammam H E Project<br />
Chandil Dam<br />
Punjab<br />
West Bengal<br />
Uttar Pradesh<br />
Uttar Pradesh<br />
Orrisa<br />
Uttar Pradesh<br />
Meghalaya<br />
Philippines<br />
Sikkim<br />
Africa<br />
West Bengal<br />
Libya<br />
Malaysia<br />
Tripura<br />
J&k<br />
Assam<br />
Assam<br />
Meghalaya<br />
West Bengal<br />
Jharkhand<br />
30<br />
80<br />
300<br />
99<br />
72<br />
198<br />
60<br />
30<br />
30<br />
124<br />
66<br />
50<br />
66<br />
105<br />
345<br />
50<br />
100<br />
60<br />
52.5<br />
130
List of Hydel Projects Executed / Under Execution<br />
Name of the Project<br />
Karbi Langpi H E Project<br />
Umium Umtru Stg-ii<br />
Rammam H E Project<br />
Chandil Dam<br />
Umium Umtru Stg-iv<br />
Sardar Sarovar<br />
Kopili H E Project<br />
Yuipanglui H E Project<br />
Teesta Canal Fall Project<br />
Kaligandaki ‘A’ H E Project<br />
Ranganadi H E Project<br />
Dhouliganga H E Project<br />
Baglihar H E Project<br />
Vishnuprayag H E Project<br />
Chamera Stg-ii H E Project<br />
Tala H E Project<br />
Purulia Pumped Storage Project<br />
Teesta Stg-v H E Project<br />
Parbati Stg-ii H E Project<br />
Teeta Low Dam Stg-iii H E Project<br />
Sewa Stg-ii H E Project<br />
Subansiri Lower H E Project<br />
Assam<br />
Meghalaya<br />
West Bengal<br />
Jharkhand<br />
Meghalaya<br />
Gujarat<br />
Assam<br />
Mizoram<br />
West Bengal<br />
Nepal<br />
Arunachal Pradesh<br />
Uttaranchal<br />
J&k<br />
Uttaranchal<br />
Himachal Pradesh<br />
Bhutan<br />
West Bengal<br />
Sikkim<br />
Himachal Pradesh<br />
West Bengal<br />
J&k<br />
Arunachal Pradesh<br />
State/Country<br />
TOTAL<br />
Capacity in MW<br />
100<br />
60<br />
52.5<br />
130<br />
60<br />
250<br />
100<br />
4.5<br />
67.5<br />
144<br />
405<br />
280<br />
450<br />
400<br />
300<br />
1020<br />
900<br />
510<br />
800<br />
132<br />
120<br />
2000<br />
10,333
List of few High Head Gate Projects executed / under execution<br />
Name of the Project<br />
Country<br />
Size in<br />
Meter<br />
Head<br />
Type of Hoist<br />
Rihand Dam<br />
India<br />
4.7 x 8.5<br />
53.0<br />
Rope Drum<br />
Wadi Ghan Dam<br />
Libya<br />
1.8 x 2.3<br />
58.4<br />
Hydraulic<br />
N’Kula Falla ‘B’ Project<br />
Afiraca<br />
3.0 x 6.0<br />
20<br />
Hydraulic<br />
Sardar Sarovar<br />
(Narmada)<br />
India<br />
5.2 x 6.8<br />
44.1<br />
Hydraulic<br />
Teesa Canal Fall<br />
India<br />
8.15 x 9.12<br />
20.5<br />
Hydraulic<br />
Baglihar<br />
India<br />
3.5 x 11.0<br />
130<br />
Hydraulic<br />
Tala H E Project<br />
Bhutan<br />
3.66 x 5.2<br />
105.8<br />
Rope Drum
High Head Gates<br />
Tenom Pangi Power Project, Malaysia<br />
Wadi Ghan Dam, Libya<br />
Tala Hydroelectric Project, Bhutan<br />
Dhouliganga H.E.Project, Uttaranchal
List of few Radial Gates executed / under execution<br />
Name of the Project<br />
Country<br />
Size in<br />
Meter<br />
Head<br />
Type of<br />
Hoist<br />
Year of<br />
Completion<br />
Panchet Dam<br />
India<br />
12.75 x 12.5<br />
12.75<br />
Rope Drum<br />
1956<br />
Obra Dam<br />
Uttar Pradesh<br />
12.2 x 10.4<br />
10.35<br />
Rope Drum<br />
1969<br />
Ramganga River Project<br />
Uttar Pradesh<br />
14.0 x 14.6<br />
17.10<br />
Rope Drum<br />
1976<br />
N’Kula Falla ‘B’ Project<br />
Afiraca<br />
15.24 x 11.25<br />
11.5<br />
Hydraulic / Chain<br />
1982<br />
Salal Stg-I<br />
India<br />
15.24 x 9.32<br />
15.7<br />
Rope Drum<br />
1987<br />
Umium Umtru Stg-IV<br />
India<br />
14.0 x 12.5<br />
12.5<br />
Rope Drum<br />
1992<br />
Kaligandaki ‘A’<br />
Nepal<br />
15.0 x 20.42<br />
19.45<br />
Hydraulic<br />
2000<br />
Chamera Stg-II<br />
India<br />
15.0 x 21.79<br />
21.79<br />
Hydraulic<br />
2003<br />
Tala H E Project<br />
Bhutan<br />
6.5 x 15.9<br />
47.57<br />
Hydraulic<br />
2004<br />
Vishnuprayag<br />
India<br />
14.0 x 14.4<br />
14.1<br />
Hydraulic<br />
Under execution<br />
Teesta Stg-V<br />
India<br />
9.0 x 15.96<br />
42.16<br />
Hydraulic<br />
Under execution<br />
Teesta Low Dam Stg-III<br />
India<br />
14.0 x 14.0<br />
27<br />
Hydraulic<br />
Under execution<br />
Subansiri Lower<br />
India<br />
11.5 x 14.0<br />
82.59<br />
Hydraulic<br />
Under execution
Spillway Radial Gates<br />
Salal H.E.Project (345 MW) J&K<br />
Chamera Stg-II H E Project ( 300 MW),Himachal<br />
Pradesh<br />
Tala H.E.Project (1020 MW) Bhutan
List of few Penstock Projects executed / under execution:<br />
Name of the<br />
Project<br />
State/Country<br />
Diameter<br />
in Meter<br />
Head in<br />
Meter<br />
Type of Material<br />
Year of<br />
Completion<br />
Kyrdemkulai H E Project<br />
Meghalaya<br />
2.60<br />
260<br />
ASTM A 285 Gr.C<br />
1978<br />
Jaldhaka H E Project<br />
West Bengal<br />
2.134<br />
59<br />
ASTM A 285 Gr.C<br />
1983<br />
Tenom Pangi Power<br />
Project<br />
Malaysia<br />
3.50<br />
105<br />
ASTM A 537 Gr.A<br />
1985<br />
Karbi Langpi H E Project<br />
Assam<br />
2.60<br />
213<br />
ASTM A 537 Gr.B<br />
1990<br />
Chandil Dam<br />
Jharkhand<br />
3.30<br />
22<br />
TISTEN-42<br />
1991<br />
Umium Umtru Stg-IV<br />
Meghalaya<br />
2.59<br />
167<br />
ASTM A 285 Gr.C<br />
1992<br />
Rammam Hydel Project<br />
West Bengal<br />
1.30<br />
620<br />
ASTM 537 Class-I<br />
1994<br />
Kopili H E Project<br />
Assam<br />
2.75<br />
217<br />
SAILMA 350 HI<br />
1996<br />
Ranganadi H E Project<br />
Arunachal Pradesh<br />
5.80<br />
440<br />
ASTM 517 Gr.F, A537 &<br />
SAILMA 350<br />
2001<br />
Purulia Pumped Storage<br />
Proj<br />
West Bengal<br />
7.70<br />
233<br />
ASTM 517 Gr.F,<br />
A 841 Cl.I&II<br />
2004<br />
Teesta Stg-V H E Project<br />
Sikkim<br />
4.7<br />
178<br />
ASTM 537 Class-I<br />
Under execution<br />
Sewa Stg-II H E Project<br />
J & K<br />
2.4<br />
618<br />
IS 2002 & ASTM 517 Gr.F<br />
Under Execution<br />
Subansiri Lower H E<br />
Project<br />
Arunachal Pradesh<br />
8.0<br />
145<br />
ASTM A 537 Cl-I<br />
Under Execution
Penstock<br />
Rammam Hydel Project (52.5 MW), West Bengal<br />
(The steepest slope in a difficult terrain)<br />
Purulia Pumped Storage Project (9005 MW), West Bengal
‣ We undertake turnkey jobs of engineering,<br />
manufacturing, erection and commissioning.<br />
‣ We are here to compete with the best in the world.<br />
We maintain the best quality of the products to<br />
suit the proper application and to give the<br />
optimum performance.<br />
‣ We deliver on time. In case of Chamera Stg-II<br />
Project of NHPC & Purulia Pumped Storage<br />
Project of WBSEB, we have completed the project<br />
ahead of schedule, as per project requirement
Texmaco’s Plan to support Govt. of India in<br />
Development of Hydro Projects<br />
CLIENT CAN DEPEND ON <strong>TEXMACO</strong> BECAUSE:<br />
Texmaco is adequately equipped to carry out work in the<br />
area of hydro-mechanical equipment & steel structure<br />
for the following reasons.<br />
Infrastructure & Facilities<br />
Quality Assurance<br />
On Time Delivery<br />
Project Management<br />
Therefore, a considerable volume of quality work can be<br />
produced within shortest possible time.
Challenge of Hydro Power Development<br />
Constraints:<br />
Corrective:<br />
- Land acquisition<br />
- Environmental and other approval / clearance.<br />
- Law and Order issue.<br />
- Geographical surprises.<br />
- Time and cost overrun because of above.<br />
- Develop a clear understanding of constraints, drawing from<br />
analytical as well as local knowledge.<br />
- Minimise negative impact through appropriate design.<br />
- Residual negative impact to be appropriately mitigated and<br />
compensated.<br />
- Suitable on-going project management and monitoring system<br />
as per requirement.