27.07.2014 Views

TEXMACO LIMITED - Infraline

TEXMACO LIMITED - Infraline

TEXMACO LIMITED - Infraline

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>TEXMACO</strong> <strong>LIMITED</strong><br />

An ISO 9001 Company<br />

Hydro-Mechanical and Steel Structural Division<br />

A Symphony<br />

in Engineering Excellence


Importance of Hydro Power for targeted growth<br />

‣ Hydro Power represents important source of energy, accounting for some 20% of all world electricity<br />

supply.<br />

‣ Hydro electricity is a clean and renewable source of energy. As per national electricity policy,maximum<br />

emphasis is on full development of the feasible hydro potential in the country.<br />

‣ Hydro Power Potential in the Country:<br />

- Potential - 2,50,000 MW<br />

- Present Capacity - 27,000 MW representing barely 11% of Potential.<br />

There is an urgent need to augment Hydro Power Capacity, GOI, therefore, has launched Hydro Power<br />

initiative for 50,000 MW in May, 2003<br />

‣ Hydro - thermal mix of 50 : 50 in 1960 has come down to 25 : 75 at present against an optimal mix of<br />

40 : 60, resulting a serious imbalance in power system.<br />

‣ Hydro power has distinct advantage over other form of commercial power and is the energy source of<br />

future.<br />

‣ Out of 50,000 MW initiative launched by GOI,around 70% of project sites are in north eastern / eastern<br />

region.<br />

‣ Texmaco is best placed logistically to partner the Government of India in tapping these huge hydel<br />

resources scheduled to be developed in 11 th & 12 th plan periods.


Texmaco’s Growth<br />

• Texmaco has grown to multi-disciplinary engineering complex in last 67<br />

years and are serving to the core infrastructure projects.<br />

• Promoted by the renowned Industrial House of Birlas, Texmaco is market<br />

leader in the field of Hydro-Mechanical Equipment, Railway Freight Cars<br />

and Steel Foundry Products.<br />

• It is also a leading producer of Industrial Boilers, Sugar Mill Machinery<br />

and other engineering products to International Standards, significantly<br />

contributing to development of infrastructure of the Nation.<br />

• It has an outstanding success record in execution of prestigious mega<br />

projects financed by National and International Institutions such as<br />

World Bank, Asian Development Bank etc.


Infrastructure Facilities<br />

The Company is situated in Kolkata, comprising five manufacturing units. Around<br />

2000 Workmen and Staff are manning these Works.<br />

Area<br />

PARTICULARS<br />

AGARPARA WORKS<br />

SODEPUR WORKS<br />

PANIHATI WORKS<br />

BELGHARIA WORKS<br />

AREA UNDER SHED WITH<br />

CRANEAGE FACILITY<br />

78,000 Sq.m<br />

20,994 Sq.m<br />

11,330 Sq.m<br />

74,200 Sq.m<br />

OPEN AREA FOR<br />

STORAGE<br />

84,664 Sq.m<br />

96,365 Sq.m<br />

40,094 Sq.m<br />

28,600 Sq.m<br />

TOTAL<br />

1,84,524 Sq.m<br />

2,49,723 Sq.m<br />

• 10,000 MT of steel of various sections, sizes and specifications can be stored in<br />

the yard.<br />

• Average 5000 MT of assorted steel materials & components are received and<br />

despatched every month.


Texmaco’s role in the field of Hydro Power Sector<br />

‣ <strong>TEXMACO</strong> <strong>LIMITED</strong> entered in the field of Design, Manufacture, Supply, Erection &<br />

Commissioning of Hydro-mechanical Equipment by signing a Technical Collaboration<br />

Agreement with VOEST ALPINE of Austria in 1954. Since then, <strong>TEXMACO</strong> has executed<br />

large number of contracts in India and abroad for Design, Manufacture, Supply, Erection &<br />

Commissioning of Hydro-mechanical Equipment involving different types of Gates,<br />

Penstock, Cranes / Hoists, Trash Rack Cleaning Machine etc.<br />

‣ Over the years, <strong>TEXMACO</strong> has developed in-house expertise in Design and Manufacturing,<br />

based on CAD and CAM techniques and has erected and commissioned equipment at<br />

some of the World’s most difficult sites. <strong>TEXMACO</strong> today justifiably can be compared to<br />

the best in the World for these activities, which is quite evident by award of jobs funded by<br />

International Agencies like World Bank, ADB and others.<br />

- Texmaco has one of the best infrastructure, manufacturing capabilities including<br />

CNC machining etc with in-house testing and inspection facilities meeting stringent<br />

QA plans.<br />

- Texmaco is managed by well qualified and experienced Managers, Engineers and<br />

skilled workforce for manufacturing and erection / commissioning activity.<br />

- Texmaco has also successfully undertaken jobs for rehabilitation of old Hydro<br />

Plants.


chievement of Hydro-mechanical Division of Texmaco in last six decades<br />

• Projects executed / under execution : 62<br />

in India & abroad<br />

• Cumulative Capacity : 10,333 MW (Which is 33% of total<br />

hydel capacity of India<br />

• Cumulative tonnage of Steelwork : 1,06,555 t.<br />

• Radial Gate : Largest size of 15.0 m x 21.79 m<br />

executed for Chamera Stg-II H E<br />

Project of NHPC.<br />

: 88.59 Mtr. High Head Radial Gates<br />

under execution for Subansiri<br />

Lower H E Project<br />

• Single largest Hydro –mechanical Package : Around Rs.320 Crore under<br />

execution for Subansiri Lower HE P.


List of Hydel Projects Executed / Under Execution<br />

Name of the Project<br />

State/Country<br />

Capacity in<br />

MW<br />

Rupar Barrage Project<br />

Panchet Dam<br />

Rihand Dam Project<br />

Obre Dam Project<br />

Hirakud Dam<br />

Ramganga River Project<br />

Kyrdemkulai H E Project<br />

Augs Ii H E Project<br />

Lower Lagyap H E Project<br />

N’kula Falls ‘B’ H E Project<br />

Jaldhaka H E Project<br />

Wadi Ghan Dam<br />

Tenom Pangi Power Project<br />

Gumti Project<br />

Salal Stg-i H E Project<br />

Khandong H E Project<br />

Karbi Langpi H E Project<br />

Umium Umtru Stg-ii<br />

Rammam H E Project<br />

Chandil Dam<br />

Punjab<br />

West Bengal<br />

Uttar Pradesh<br />

Uttar Pradesh<br />

Orrisa<br />

Uttar Pradesh<br />

Meghalaya<br />

Philippines<br />

Sikkim<br />

Africa<br />

West Bengal<br />

Libya<br />

Malaysia<br />

Tripura<br />

J&k<br />

Assam<br />

Assam<br />

Meghalaya<br />

West Bengal<br />

Jharkhand<br />

30<br />

80<br />

300<br />

99<br />

72<br />

198<br />

60<br />

30<br />

30<br />

124<br />

66<br />

50<br />

66<br />

105<br />

345<br />

50<br />

100<br />

60<br />

52.5<br />

130


List of Hydel Projects Executed / Under Execution<br />

Name of the Project<br />

Karbi Langpi H E Project<br />

Umium Umtru Stg-ii<br />

Rammam H E Project<br />

Chandil Dam<br />

Umium Umtru Stg-iv<br />

Sardar Sarovar<br />

Kopili H E Project<br />

Yuipanglui H E Project<br />

Teesta Canal Fall Project<br />

Kaligandaki ‘A’ H E Project<br />

Ranganadi H E Project<br />

Dhouliganga H E Project<br />

Baglihar H E Project<br />

Vishnuprayag H E Project<br />

Chamera Stg-ii H E Project<br />

Tala H E Project<br />

Purulia Pumped Storage Project<br />

Teesta Stg-v H E Project<br />

Parbati Stg-ii H E Project<br />

Teeta Low Dam Stg-iii H E Project<br />

Sewa Stg-ii H E Project<br />

Subansiri Lower H E Project<br />

Assam<br />

Meghalaya<br />

West Bengal<br />

Jharkhand<br />

Meghalaya<br />

Gujarat<br />

Assam<br />

Mizoram<br />

West Bengal<br />

Nepal<br />

Arunachal Pradesh<br />

Uttaranchal<br />

J&k<br />

Uttaranchal<br />

Himachal Pradesh<br />

Bhutan<br />

West Bengal<br />

Sikkim<br />

Himachal Pradesh<br />

West Bengal<br />

J&k<br />

Arunachal Pradesh<br />

State/Country<br />

TOTAL<br />

Capacity in MW<br />

100<br />

60<br />

52.5<br />

130<br />

60<br />

250<br />

100<br />

4.5<br />

67.5<br />

144<br />

405<br />

280<br />

450<br />

400<br />

300<br />

1020<br />

900<br />

510<br />

800<br />

132<br />

120<br />

2000<br />

10,333


List of few High Head Gate Projects executed / under execution<br />

Name of the Project<br />

Country<br />

Size in<br />

Meter<br />

Head<br />

Type of Hoist<br />

Rihand Dam<br />

India<br />

4.7 x 8.5<br />

53.0<br />

Rope Drum<br />

Wadi Ghan Dam<br />

Libya<br />

1.8 x 2.3<br />

58.4<br />

Hydraulic<br />

N’Kula Falla ‘B’ Project<br />

Afiraca<br />

3.0 x 6.0<br />

20<br />

Hydraulic<br />

Sardar Sarovar<br />

(Narmada)<br />

India<br />

5.2 x 6.8<br />

44.1<br />

Hydraulic<br />

Teesa Canal Fall<br />

India<br />

8.15 x 9.12<br />

20.5<br />

Hydraulic<br />

Baglihar<br />

India<br />

3.5 x 11.0<br />

130<br />

Hydraulic<br />

Tala H E Project<br />

Bhutan<br />

3.66 x 5.2<br />

105.8<br />

Rope Drum


High Head Gates<br />

Tenom Pangi Power Project, Malaysia<br />

Wadi Ghan Dam, Libya<br />

Tala Hydroelectric Project, Bhutan<br />

Dhouliganga H.E.Project, Uttaranchal


List of few Radial Gates executed / under execution<br />

Name of the Project<br />

Country<br />

Size in<br />

Meter<br />

Head<br />

Type of<br />

Hoist<br />

Year of<br />

Completion<br />

Panchet Dam<br />

India<br />

12.75 x 12.5<br />

12.75<br />

Rope Drum<br />

1956<br />

Obra Dam<br />

Uttar Pradesh<br />

12.2 x 10.4<br />

10.35<br />

Rope Drum<br />

1969<br />

Ramganga River Project<br />

Uttar Pradesh<br />

14.0 x 14.6<br />

17.10<br />

Rope Drum<br />

1976<br />

N’Kula Falla ‘B’ Project<br />

Afiraca<br />

15.24 x 11.25<br />

11.5<br />

Hydraulic / Chain<br />

1982<br />

Salal Stg-I<br />

India<br />

15.24 x 9.32<br />

15.7<br />

Rope Drum<br />

1987<br />

Umium Umtru Stg-IV<br />

India<br />

14.0 x 12.5<br />

12.5<br />

Rope Drum<br />

1992<br />

Kaligandaki ‘A’<br />

Nepal<br />

15.0 x 20.42<br />

19.45<br />

Hydraulic<br />

2000<br />

Chamera Stg-II<br />

India<br />

15.0 x 21.79<br />

21.79<br />

Hydraulic<br />

2003<br />

Tala H E Project<br />

Bhutan<br />

6.5 x 15.9<br />

47.57<br />

Hydraulic<br />

2004<br />

Vishnuprayag<br />

India<br />

14.0 x 14.4<br />

14.1<br />

Hydraulic<br />

Under execution<br />

Teesta Stg-V<br />

India<br />

9.0 x 15.96<br />

42.16<br />

Hydraulic<br />

Under execution<br />

Teesta Low Dam Stg-III<br />

India<br />

14.0 x 14.0<br />

27<br />

Hydraulic<br />

Under execution<br />

Subansiri Lower<br />

India<br />

11.5 x 14.0<br />

82.59<br />

Hydraulic<br />

Under execution


Spillway Radial Gates<br />

Salal H.E.Project (345 MW) J&K<br />

Chamera Stg-II H E Project ( 300 MW),Himachal<br />

Pradesh<br />

Tala H.E.Project (1020 MW) Bhutan


List of few Penstock Projects executed / under execution:<br />

Name of the<br />

Project<br />

State/Country<br />

Diameter<br />

in Meter<br />

Head in<br />

Meter<br />

Type of Material<br />

Year of<br />

Completion<br />

Kyrdemkulai H E Project<br />

Meghalaya<br />

2.60<br />

260<br />

ASTM A 285 Gr.C<br />

1978<br />

Jaldhaka H E Project<br />

West Bengal<br />

2.134<br />

59<br />

ASTM A 285 Gr.C<br />

1983<br />

Tenom Pangi Power<br />

Project<br />

Malaysia<br />

3.50<br />

105<br />

ASTM A 537 Gr.A<br />

1985<br />

Karbi Langpi H E Project<br />

Assam<br />

2.60<br />

213<br />

ASTM A 537 Gr.B<br />

1990<br />

Chandil Dam<br />

Jharkhand<br />

3.30<br />

22<br />

TISTEN-42<br />

1991<br />

Umium Umtru Stg-IV<br />

Meghalaya<br />

2.59<br />

167<br />

ASTM A 285 Gr.C<br />

1992<br />

Rammam Hydel Project<br />

West Bengal<br />

1.30<br />

620<br />

ASTM 537 Class-I<br />

1994<br />

Kopili H E Project<br />

Assam<br />

2.75<br />

217<br />

SAILMA 350 HI<br />

1996<br />

Ranganadi H E Project<br />

Arunachal Pradesh<br />

5.80<br />

440<br />

ASTM 517 Gr.F, A537 &<br />

SAILMA 350<br />

2001<br />

Purulia Pumped Storage<br />

Proj<br />

West Bengal<br />

7.70<br />

233<br />

ASTM 517 Gr.F,<br />

A 841 Cl.I&II<br />

2004<br />

Teesta Stg-V H E Project<br />

Sikkim<br />

4.7<br />

178<br />

ASTM 537 Class-I<br />

Under execution<br />

Sewa Stg-II H E Project<br />

J & K<br />

2.4<br />

618<br />

IS 2002 & ASTM 517 Gr.F<br />

Under Execution<br />

Subansiri Lower H E<br />

Project<br />

Arunachal Pradesh<br />

8.0<br />

145<br />

ASTM A 537 Cl-I<br />

Under Execution


Penstock<br />

Rammam Hydel Project (52.5 MW), West Bengal<br />

(The steepest slope in a difficult terrain)<br />

Purulia Pumped Storage Project (9005 MW), West Bengal


‣ We undertake turnkey jobs of engineering,<br />

manufacturing, erection and commissioning.<br />

‣ We are here to compete with the best in the world.<br />

We maintain the best quality of the products to<br />

suit the proper application and to give the<br />

optimum performance.<br />

‣ We deliver on time. In case of Chamera Stg-II<br />

Project of NHPC & Purulia Pumped Storage<br />

Project of WBSEB, we have completed the project<br />

ahead of schedule, as per project requirement


Texmaco’s Plan to support Govt. of India in<br />

Development of Hydro Projects<br />

CLIENT CAN DEPEND ON <strong>TEXMACO</strong> BECAUSE:<br />

Texmaco is adequately equipped to carry out work in the<br />

area of hydro-mechanical equipment & steel structure<br />

for the following reasons.<br />

Infrastructure & Facilities<br />

Quality Assurance<br />

On Time Delivery<br />

Project Management<br />

Therefore, a considerable volume of quality work can be<br />

produced within shortest possible time.


Challenge of Hydro Power Development<br />

Constraints:<br />

Corrective:<br />

- Land acquisition<br />

- Environmental and other approval / clearance.<br />

- Law and Order issue.<br />

- Geographical surprises.<br />

- Time and cost overrun because of above.<br />

- Develop a clear understanding of constraints, drawing from<br />

analytical as well as local knowledge.<br />

- Minimise negative impact through appropriate design.<br />

- Residual negative impact to be appropriately mitigated and<br />

compensated.<br />

- Suitable on-going project management and monitoring system<br />

as per requirement.


For giving your valuable time.<br />

For giving your valuable time.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!