(A Government of India Enterprise)<br />

2/1, RUSSEL STREET,<br />

KANKARIA CENTRE<br />

5 TH FLOOR<br />

KOLKATA - 700071<br />

5 th July 2007<br />

1


<strong>CO</strong>MPANY PROFILE<br />

2


THE <strong>CO</strong>MPANY<br />

Bridge & Roof is a multidisciplinary engineering construction company having maintained its<br />

growth and profitability against stiff competition from Public as well as Private Sector<br />

Companies. Established in 1920, through last 87 years, Bridge & Roof has grown into a<br />

premier multi-disciplinary Engineering and Construction Organization in India as well as rest<br />

of South East Asia. Its activities include Civil Construction, Mechanical Construction,<br />

Tankage, Piling, Roads and Highways, EPC/Turnkey Contracts, Laying of Cross Country<br />

Pipelines, etc. It also has a workshop at Howrah, West Bengal engaged in Structural<br />

Fabrication, Manufacture of Bailey Bridges, Containers and Wagons, etc. Today, Bridge &<br />

Roof is one of the leading and most versatile construction organization in the the country with<br />

high degree of expertise and substantial in-house resources both in dedicated man-power and<br />

modern equipment and machinery.<br />

As on May’07 the company is executing 110 numbers of orders at around 50 different work<br />

locations all over India.<br />

3


Civil<br />

• Area Grading<br />

• Piling, Soil Densification<br />

• Sub-structure & Super-structure<br />

for Major Industrial Projects<br />

• High-Rise & Industrial Buildings<br />

• Chimneys, Prilling Towers and<br />

Silos<br />

• Concrete Road Bridges and<br />

Flyovers<br />

• Airport Terminals and Runway<br />

• Ports and Jetties<br />

Mechanical<br />

• Crude & Product Storage Tanks<br />

• Piping<br />

• Equipment Erection<br />

•Blast Furnace<br />

• Heaters and Reformers<br />

• Stainless Steel Silo<br />

• Boiler Erection Work<br />

• Structural Steel Work<br />

– Industrial and Technological<br />

Structures<br />

– Pot and Pot Superstructure for<br />

Aluminium Plant<br />

– Flare Stack and Steel Chimney<br />

– Loading Gantry<br />

– Steel Bridge (Railways /<br />

Roadways)<br />

– Space Frame Structure<br />

Construction<br />

Services<br />

LSTK /EPC /<br />

Turnkey Projects<br />

• Oil Terminals and Depots<br />

• Cross Country Piping<br />

• LPG and LNG Terminals<br />

• Ports and Jetties<br />

• Environmental Projects<br />

• Fire Fighting / Protection<br />

System<br />

• Combined Cycle Power<br />

Project<br />

• Heaters and Reformers<br />

• Cooling Towers<br />

• Retail and Jubilee Outlets<br />

Roads<br />

and<br />

Highways<br />

Major<br />

Areas of<br />

Business<br />

Plant<br />

Turnaround<br />

and Inspection<br />

Jobs<br />

Products<br />

At<br />

Howrah<br />

Works<br />

• Bailey Type Unit Bridge<br />

• Railway Wagon<br />

• All types of Light,<br />

Medium and Heavy Steel<br />

Structures<br />

• Steel Bridge Girders for<br />

Railways and Roads<br />

• Pressure Vessel and<br />

medium size Heat<br />

Exchanger<br />

• LPG Bullet Tank<br />

• Bunk House<br />

• Marine Freight Container<br />

• Truck Mounted Domestic<br />

Container<br />

4


<strong>CO</strong>RPORATE ORGANOGRAM<br />

BOARD OF DIRECTORS<br />

MANAGING DIRECTOR<br />

<strong>CO</strong>MPANY SECRETARY<br />

PROJECT DIVISION<br />

WORKS DIVISION<br />

FINANCE DIVISION<br />

<strong>CO</strong>RPORATE DIVISION<br />

DIRECTOR (PROJECT<br />

MANAGEMENT)<br />

DOMESTIC<br />

PROJECTS<br />

OVERSEAS<br />

PROJECTS<br />

CIVIL<br />

MECHANICAL<br />

TURNKEY<br />

ROADS &<br />

HIGHWAYS<br />

EAST<br />

WEST<br />

NORTH<br />

SOUTH<br />

MARKETING<br />

MANUFACTURING<br />

DESIGN &<br />

ENGINEERING<br />

MARKETING<br />

EXECUTION<br />

DIRECTOR<br />

(FINANCE)<br />

FINANCE<br />

AC<strong>CO</strong>UNTS<br />

TAXATION<br />

PERSONNEL<br />

MANAGEMENT<br />

SERVICES<br />

INTERNAL<br />

AUDIT<br />

VIGILANCE<br />

DESIGN &<br />

ENGINEERING<br />

<strong>CO</strong>MMERCIAL<br />

SECTION<br />

PROCUREMENT<br />

<strong>CO</strong>NTRACTS<br />

RESEARCH &<br />

DEVELOPMENT<br />

LEGAL AFFAIRS<br />

5


GROWTH STRATEGY<br />

6


TURNOVER<br />

The company has registered a turnover of Rs. 610.44 Crores<br />

during 2006-07 thereby achieving a growth of 20% over the<br />

last year’s performance i.e. Rs. 510.32 Crores.<br />

7


PROFIT BEFORE TAX (PBT)<br />

The Company has earned a Profit Before Tax of Rs. 7.09<br />

Crores in 2006-07 against Rs. 3.11 Crores during 2005-06<br />

which is more than double over last year’s performance.<br />

8


THE <strong>CO</strong>MPANY<br />

Major Sectors of<br />

Business Operations<br />

Areas of Specialization<br />

OTHERS<br />

15%<br />

RAILWAYS<br />

2%<br />

POWER<br />

21%<br />

ROAD<br />

4%<br />

NON-<br />

FERROUS<br />

2%<br />

FERROUS<br />

4%<br />

PETROCHEMI<br />

CALS<br />

7%<br />

OIL & GAS<br />

45%<br />

• Floating Roof Tanks<br />

• Steel and Concrete Bridges<br />

• Mechanized Construction of<br />

Highways<br />

• Railway Wagons<br />

• Bailey Type Unit Bridges<br />

Turnover : Rs. 610 Crores<br />

2006-2007<br />

9


MARKET SHARE<br />

10


ORDER BOOKING<br />

LAST FIVE YEARS ACTUAL <strong>AND</strong><br />

PROJECTION FOR NEXT THREE YEARS<br />

1500<br />

RS./CRORES<br />

1400<br />

1250<br />

1000<br />

1103<br />

950<br />

1150<br />

750<br />

500<br />

375<br />

568<br />

446<br />

709<br />

250<br />

0<br />

2002- 2003- 2004- 2005- 2006-<br />

03 04 05 06 07<br />

------------------------ Actuals ----------------------------<br />

2007-<br />

08<br />

2008-<br />

09<br />

2009-<br />

10<br />

-------------Projection---------------<br />

11


SECTORWISE ORDER BOOKING<br />

POWER<br />

24%<br />

OTHERS<br />

1%<br />

RAILWAYS<br />

5%<br />

NON-FERROUS<br />

1%<br />

FERROUS<br />

16%<br />

Orders Booked = Rs. 446 Crores<br />

2004-2005<br />

ROAD<br />

0%<br />

RAILWAYS<br />

10%<br />

PETRO-<br />

CHEMICALS<br />

3%<br />

OIL & GAS<br />

50%<br />

NON-FERROUS<br />

13%<br />

RAILWAYS<br />

1%<br />

OTHERS<br />

8%<br />

POWER<br />

24%<br />

FERROUS<br />

30%<br />

ROAD<br />

28%<br />

NON-FERROUS<br />

3% FERROUS<br />

1%<br />

PETROCHE-<br />

MICALS<br />

7%<br />

OIL & GAS<br />

28%<br />

Orders Booked = Rs. 709 Crores<br />

2005-2006<br />

OTHERS<br />

18%<br />

POWER<br />

1%<br />

OIL & GAS<br />

16%<br />

Orders Booked = Rs. 1103 Crores<br />

2006-2007<br />

PETROCHEMICA<br />

LS<br />

12%<br />

12


CUSTOMER ORGANISATION<br />

13


MAJOR CLIENTS<br />

Domestic Clients & Their Engineering Consultants<br />

Orders in Hand<br />

Rs./Crores<br />

Public Sector 794 (62%)<br />

Private Sector 487 (38%)<br />

Total 1281 (100%)<br />

14


Steel Sector<br />

MAJOR CLIENTS<br />

Domestic Clients & Their Engineering Consultants<br />

Non-Ferrous Sector<br />

Steel Authority of India Ltd.<br />

Rashtriya Ispat Nigam Limited, Visakhapatnam Steel Plant.<br />

Bhusan Steel & Strips Limited.<br />

Tata Iron & Steel Co. Limited.<br />

Jindal Steel & Power Limited.<br />

Grasim Industries Limited, Vikram Ispat.<br />

Usha Ispat Limited.<br />

Malavika Steel Limited<br />

PWD / CPWD<br />

State Electricity Board<br />

Oil (Hydrocarbon)<br />

Sector<br />

Bharat Petroleum Corporation Ltd.<br />

Chennai Petroleum Corporation Ltd.<br />

Gas Authority of India Ltd.<br />

Hindustan Petroleum Corporation Ltd.<br />

Indian Oil Corporation Ltd.<br />

Indian Petrochemicals Corporation Ltd.<br />

Oil & Natural Gas Corporation Ltd.<br />

Haldia Petrochemicals Ltd.<br />

Indian Oiltanking Ltd.<br />

Mangalore Refineries & Petrochemicals Ltd.<br />

Petronet MHB Ltd.<br />

Reliance Group<br />

ESSAR Group<br />

Power Sector<br />

Bharat Heavy Electricals Ltd.<br />

Damodar Valley Corporation<br />

National Thermal Power Corporation<br />

Dept. of Atomic Energy, Govt. of India.<br />

Bhava Atomic Research Centre<br />

State Electricity Boards<br />

Engineering Consultants<br />

M. N. Dastur & Company (P) Ltd.<br />

Metallurgical & Engineering Consultants (I) Ltd.<br />

Engineers India Limited<br />

Development Consultants Pvt. Limited.<br />

Projects & Development India Limited.<br />

Tata Consultancy Services.<br />

Tata Consulting Engineers.<br />

Consulting Engineering Services.<br />

Kothari & Associates.<br />

STUP Consultants Pvt. Ltd.<br />

Desien Pvt. Limited<br />

National Hydro Electric Power Corporation.<br />

Sterlite Industries Ltd.<br />

National Aluminium Co. Ltd.<br />

Indian Aluminium Company Ltd (HINDAL<strong>CO</strong>)<br />

Others<br />

Associated Cement Company<br />

Grasim Industries Ltd.<br />

ICI India Ltd.<br />

Orissa Cement Ltd.<br />

Airports Authority of India<br />

Cochin Shipyard Ltd.<br />

Delhi Metro Rail Corporation Ltd.<br />

Director General Border Roads<br />

Garden Reach Shipbuilders & Engineers<br />

Gujarat Narmada Valley Fertilizers Co. Ltd.<br />

Indian Farmers Fertilizer Co-operative<br />

Indian Railways<br />

IR<strong>CO</strong>N International Ltd.<br />

Kandla Port Trust<br />

Kolkata Port Trust<br />

National Fertilizers Ltd.<br />

National Highways Authority of India<br />

Nuclear Power Corporation<br />

Delhi Metro Rail Corporation<br />

PWD / CPWD<br />

15


Overseas Clients<br />

MAJOR CLIENTS<br />

TAISEI Corporation, Japan<br />

Mill Ltd., Nepal<br />

Caltex, Dubai<br />

Development Consultants International Ltd., Hong Kong<br />

Embassy of India, Kathmandu, Nepal<br />

Her Britannic Majesty’s Dept. of Environment, U.K.<br />

Hetauda Cement Industries Ltd., Nepal<br />

His Majesty’s Govt. of Nepal, Ministry of Works and Transport<br />

Intertec Contracting A/C, Denmark<br />

Myanmar Oil Corpn., Burma<br />

Ministry of Electricity and Water, Al Bucheeri Industrial Services, Abu Dhabi, U.A.E<br />

Bahrain Petroleum Co., Bahrain<br />

Butwal Spinning Govt. of Kuwait<br />

Ministry of Housing and Construction, Iraq<br />

Ministry of Municipalities, Iraq<br />

Nepal Oil Corpn. Ltd., Nepal<br />

Penden Cement Authority Ltd., Bhutan<br />

Royal Govt. of Bhutan, Ministry of Communications<br />

State Electric Co. Ltd., Maldives<br />

State Fertilizer Mfg. Corpn. of Sri Lanka<br />

Swiss Govt. Directorate for Development Corpn., Switzerland<br />

CAITC, China<br />

16


VOLUME OF SALES<br />

17


VOLUME OF SALES<br />

IN IRS./MILLIONS<br />

YEAR 2002-2003 2003-2004 2004-2005 2005-2006 2006-2007<br />

SALES 3666 3936 4514 5065 6130<br />

18


TYPICAL PROJECT<br />

ORGANISATION<br />

19


TYPICAL SITE ORGANISATION CHART<br />

Controlling Dy. General Manager /<br />

Asst. General Manager<br />

(At Corporate / Zonal Office)<br />

Project Manager / Sr. Resident Manager<br />

Planning &<br />

Billing Engineer<br />

Resident<br />

Engineer<br />

(Civil Works)<br />

Resident<br />

Engineer<br />

(Strl. Steel Works /<br />

Equipment Erection)<br />

Resident<br />

Engineer<br />

(LP/HP Piping)<br />

Quality<br />

Control<br />

Engineer<br />

Maintenance<br />

Engineer<br />

Safety<br />

Officer<br />

Accountant<br />

Store<br />

Assistant<br />

Administration<br />

Site<br />

Engineers<br />

Site<br />

Engineers<br />

Site<br />

Engineers<br />

Quality<br />

Control<br />

Assistants<br />

Assistants<br />

Assistants<br />

Account<br />

Assistants<br />

Store<br />

Clerks<br />

Clerks,<br />

Typist,<br />

Durwan,<br />

Peon, etc<br />

Supervisors<br />

Supervisors<br />

Supervisors<br />

20


PROJECT MONITORING SYSTEM<br />

Urgent action, if needed, taken<br />

by Controlling Officer (in<br />

consultation with HOD if<br />

needed) and site advised for<br />

necessary action<br />

SITE REPORTS<br />

Various<br />

Weekly / Monthly<br />

Reports<br />

Corrective Actions to be taken<br />

communicated to the site<br />

<strong>CO</strong>NTROLLING<br />

OFFICER<br />

HOD<br />

At<br />

Head Office /<br />

Zonal Office<br />

MS DEPT<br />

At<br />

Head Office<br />

Compiles Report<br />

from all Sites<br />

Finance<br />

Dept.<br />

At Head<br />

Office<br />

Director (Finance)<br />

Director<br />

(Project Management)<br />

Managing Director<br />

21


PROJECT SCHEDULING<br />

<strong>AND</strong> PLANNING<br />

22


PROJECT PLANNING <strong>AND</strong> SCHEDULING<br />

Project Planning and Reviewing is a priority area of Project Implementation in the company.<br />

On time and within Cost Budget is the primary target during execution of projects.<br />

‣ Planning<br />

Defining Activities, Preparing a Work Breakdown Structure and co-ordination between tasks, preparing<br />

work schedules, assigning and allocating resources to the activities, determining project costs and<br />

developing an acceptable cost budget is worked out before the start of the project<br />

‣ Controlling<br />

Track work progress and actual costs, compare physical progress and costs to target, evaluate performance<br />

by updating the schedule on a regular basis and comparing it with the target plan, ensuring optimum<br />

utilization of resources, keeping record of actual work duration and cost. Analyze data via reports and<br />

graphs and take corrective measure if required to prevent time and cost overrun by readjusting the work<br />

schedule and resource allocation<br />

‣ Managing<br />

Communication between project team involved in the execution, controlling managers and management of<br />

the company and the client is of primary importance. Presenting timely and accurate information to the<br />

correct person who can take remedial measures keeps the project on target.<br />

23


EMPLOYEE STRENGTH<br />

The company has a strong reserve of qualified and experienced man-power for<br />

execution of construction projects. The company has on its roll 1443 numbers of<br />

permanent employees as on 01-06-2007. During the execution of specific projects,<br />

the company hires services of skilled and unskilled workforce, depending on the<br />

nature and duration of the project<br />

Permanent Employee Strength as on 01-06-2007<br />

Projects Howrah Works Total Company<br />

Officers 556 90 646<br />

Staff & Sub-Staff 443 92 535<br />

Workers 6 258 264<br />

TOTAL 1005 440 1445<br />

24


MAJOR EQUIPMENT RESOURCES<br />

Batching Plant and Truck Mixer<br />

Excavator-cum-Loader and Dumper<br />

Driven Pile Rig<br />

Batch Type<br />

Hot Mix Plant<br />

Tower Crane<br />

Crawler Crane<br />

Vibratory Road Roller<br />

Tandem Vibratory Road Roller<br />

Paver Finisher with Sensor<br />

Stone Crushing cum<br />

Screening Plant<br />

25


QUALITY MANAGEMENT<br />

Quality Policy<br />

It is the policy of B&R to identify customer needs and to ensure “Total Customer Satisfaction” through<br />

sustained endeavor by maintaining quality, delivery schedule and trouble free services.<br />

Quality Objectives<br />

To maintain control check points for all activities to preserve and enforce the established quality<br />

standards.<br />

To monitor quality order to provide a measure of the effectiveness of the total quality effort and<br />

to identify the areas requiring remedial quality planning and action.<br />

To encourage a continuing communication with the clients to assure that the established quality<br />

standards are as per requirements.<br />

To encourage a continuing exchange of quality experiences and recommendations between field<br />

and Head Office / Zonal Office operations.<br />

To maintain and motivate quality consciousness among all employees of the company by<br />

sponsoring technical management training and professional advancement programs.<br />

To ensure necessary environment and infrastructure at all required levels.<br />

26


ISO – 9001:2000<br />

ISO Certificate for Tanks<br />

ISO Certificate for<br />

Bailey Bridge & Wagons<br />

Bridge & Roof Co. (India) Ltd. is one of the<br />

very few construction companies whose<br />

storage tank construction has been accredited<br />

with ISO-9001:2000 certificate from M/s DNV,<br />

Holland With this high level of quality in tank<br />

construction, Bridge & Roof can easily be<br />

placed at par with any international company<br />

so far as quality is concerned.<br />

B&R has also been accredited<br />

with an ISO-9001:2000<br />

Certificate for Manufacture and<br />

Supply of Railways Wagons and<br />

Design, Manufacture and Supply<br />

of Bailey Bridge being<br />

manufactured at Howrah<br />

Workshop.<br />

27


SAFETY POLICY<br />

• Promotion and Development of Consciousness for Health, Safety,<br />

Environment and Fire Protection among all personnel working at<br />

Construction Projects.<br />

• Implementation of Health, Safety and Environmental System<br />

requirements through extensive and regular training and periodic<br />

compliance checks.<br />

• Regular safety meetings and updation programmes at project sites<br />

and offices involving workers and officers to develop, sustain and<br />

increase behavioural and attitudinal awareness towards safety.<br />

• To continuously check and improve upon the safety standards.<br />

• Maintaining all Documents and Records of safety meetings,<br />

Training and Implementation as per Construction Safety manual.<br />

• Ensuring safety during Design Engineering<br />

28


SPECIFIC EXPERIENCE<br />

IN <strong>CO</strong>NSTRUCTION<br />

OF<br />

THERMAL POWER PLANT<br />

29


CIVIL <strong>CO</strong>NSTRUCTION<br />

(Sub-structure including Piling &<br />

Superstructure)<br />

PILING (VARIOUS TYPE)<br />

T.G. POWER HOUSE, BOILER,<br />

BUNKER FOUNDATIONS & SUPER<br />

STRUCTURE<br />

OFFSITE & UTILITIES<br />

<strong>CO</strong>AL H<strong>AND</strong>LING PLANT<br />

E.S.P.<br />

<strong>CO</strong>OLING TOWER<br />

SWITCH YARD AREA<br />

TAILRACE OUT LET WORKS<br />

WORK AREAS<br />

MECHANICAL WORKS<br />

STRUCTURAL WORK (POWER<br />

HOUSE, BUNKER, <strong>CO</strong>AL<br />

H<strong>AND</strong>LING PLANT)<br />

ERECTION OF BOILER (NON<br />

PRESSURE PART, PRESSURE<br />

PART, ROTARY EQUIPMENTS,<br />

E.S.P.)<br />

FABRICATION & LAYING OF<br />

<strong>CO</strong>OLING WATER PIPE LINE<br />

SWITCH YARD ERECTION<br />

EQUIPMENT ERECTION<br />

RELATED TO HYDEL POWER<br />

PROJECTS (LIKE RADIAL GATE,<br />

EMBEDDED PART, TRASH ETC.)<br />

LP/ HP PIPE LINE<br />

ERECTION OF EQUIPMENT OF<br />

<strong>CO</strong>AL H<strong>AND</strong>LING PLANT<br />

CRITICAL PIPING OF BOILER<br />

WORK<br />

WATER TREATMENT PALNT<br />

30


MAJOR WORKS EXECUTED<br />

FOR<br />

THERMAL POWER PLANTS IN <strong>INDIA</strong><br />

31


Sl.<br />

No.<br />

MAJOR WORKS EXECUTED FOR THERMAL POWER PLANTS IN <strong>INDIA</strong><br />

Description Owner Period Value<br />

( IRs / Million)<br />

1. Erection, Testing & Commissioning of<br />

various Hydro Mechanical Equipment<br />

2. Replacement of existing Kerosene Tank<br />

Roof Duct Plate (V1901A) at Manali<br />

3. Erection, Testing & Commissioning of<br />

Boiler Main at 1X210 MW Mejia TPS<br />

(Unit-IV) (6863 MT)<br />

4. Structural Steel Work in Boiler & Bunker<br />

Bay (Part-B) of 2X500 MW Units at<br />

Simhadri Thermal Power Station<br />

5. Structural Steel Work Fabrication &<br />

Erection Work for 2X500 MW Units<br />

Simhadri Thermal Power Station (7998<br />

MT)<br />

Tungabhadra Steel<br />

Products Ltd.,<br />

Tamilnadu Petroproducts<br />

Limited,<br />

Bharat Heavy Electricals<br />

Ltd.<br />

Bharat Heavy Electricals<br />

Ltd.,<br />

Simplex Concrete Piles (I)<br />

Ltd.,<br />

6. Fabrication, Erection & Painting of Bharat Heavy Electricals<br />

Structural Steel Work of Power House Ltd.<br />

Building (Unit - II) at 2X210 MW<br />

Bakreswar Thermal Power Project<br />

7. Fabrication, Erection of Structural Steel National Thermal Power<br />

Works Part-I (TG Bay, Deaerator bay, Corpn. Ltd.,<br />

Control Tower Bay) for Vindhyachal Super<br />

Thermal Power Project Stage-II (2 X 500<br />

MW) (14700 MT)<br />

2003-2006 18.68<br />

2004-2005 3.03<br />

2002-2004 57.15<br />

1999-2003 343.70<br />

1999-2000 84.09<br />

1997-2000 65.93<br />

1995-1998<br />

103.47<br />

32


Sl.<br />

No.<br />

MAJOR WORKS EXECUTED FOR THERMAL POWER PLANTS IN <strong>INDIA</strong><br />

Description Owner Period Value<br />

( IRs / Million)<br />

8. Structural Steel Works Package for<br />

Feroze Gandhi Unchahar Thermal Power<br />

Project, Stage-II (2 X 210 MW Units)<br />

(16000 MT)<br />

9. Detailing, Fabrication, Despatch &<br />

Erection of Structural Steel Work for Mill<br />

Bay for Mejia Thermal Power Station<br />

Unit-I,II & III (3 X 210 MW) (12800 MT)<br />

10. Fabrication & Erection of Structural Steel<br />

Work in Unit-V area (2X500 MW Stage) &<br />

Erection of TP-15 Structure (3800 MT)<br />

National Thermal<br />

Power Corpn. Ltd.<br />

Damodar Valley<br />

Corpn., Electricity<br />

Dept.,<br />

National Thermal<br />

Power Corpn. Ltd.<br />

1995-1998 112.81<br />

1993-1997 186.87<br />

1991-1993 25.75<br />

11.<br />

Site Fabrication & Erection of Structural<br />

steel Part-A (T.G. Bay, Deaerator Bay &<br />

Control Bay for Unit-IV)for Farakka Super<br />

Thermal Power Project Stage-II(2 X 500<br />

MW)(8000 MT)<br />

National Thermal<br />

Power Corpn. Ltd.<br />

1987-1992<br />

54.08<br />

12.<br />

Structural Fabrication & Erection Works<br />

of in connection with General Civil Works<br />

Part-II Package for Farakka Super<br />

Thermal Power Project Stage-II(2 X 500<br />

MW)<br />

National Thermal<br />

Power Corpn. Ltd.<br />

1988-1992<br />

20.43<br />

33


Sl.<br />

No.<br />

15.<br />

16.<br />

17.<br />

MAJOR WORKS EXECUTED FOR THERMAL POWER PLANTS IN <strong>INDIA</strong><br />

Description Owner Period Value<br />

( IRs / Million)<br />

13. Supply,Fabrication & Erection of Structural<br />

Bunkers & Misc. Steelwork for Bokaro 'B'<br />

Thermal Power Station Unit-II & II I(2 X<br />

210 MW) (9340 MT)<br />

14. Supply, Fabrication & Erection of Structural<br />

Steelwork for Farakka Super Thermal<br />

Power Project Part-II(6400 MT)<br />

Supply,Fabrication & Erection of Structural<br />

Steelwork in T.G. & B.C. Bay & Floor<br />

Beams for Ramagundam Super Thermal<br />

Power Project Stage-I(3 X 200 MW)(6200<br />

MT)<br />

Supply,Fabrication & Erection of Structural<br />

Steelwork in Bunker Bay for Korba Super<br />

Thermal Power Project Stage-I(3 X 200<br />

MW)(6800 MT)<br />

Fabrication & Erection of Structural Steel<br />

for Thermal Power Station Stage - II (2 x<br />

200 MW) (7800 MT).<br />

Damodar Valley<br />

Corpn., Electricity<br />

National Thermal<br />

Power Corpn. Ltd.<br />

National Thermal<br />

Power Corpn. Ltd.,<br />

National Thermal<br />

Power Corpn. Ltd.,<br />

U.P. State Electricity<br />

Board<br />

1982-1990 18.91<br />

1981-1986 48.40<br />

1980-1981<br />

1979-1980<br />

1975-1979<br />

39.01<br />

33.90<br />

31.44<br />

34


OTHER WORKS EXECUTED FOR THERMAL POWER PLANTS IN <strong>INDIA</strong><br />

Sl.<br />

No.<br />

7<br />

8<br />

Description Owner Period Value<br />

( IRs / Million)<br />

1 Piling Work (RCC Cast-in-situ Driven Piles and RCC Precast<br />

Piles)<br />

2 Main Civil Works for the Purulia Pumped Storage Project at<br />

Upper Dam, Lower Dam, Power Intake, Tailrace Outlet and other<br />

incidental works<br />

3 Pile Foundation Package-A for LILO of 400 KV D/C Dadri -<br />

Ballabgarh Transmission Line at Maharanibagh, New Delhi<br />

associated with Tata Hydro Electric Project<br />

4 Pile foundation package for River Crossing Locations for 400 KV<br />

D.C. Vishnuprayag - Mujaffarnagar Transmission line (Cast - in -<br />

situ Bored Pile, Dia - 1.0 M, Length - 35.0 M, Nos. - 51)<br />

5 Civil, Structural and Architectural Work of Chlorination Plant<br />

Building, Pipe/Cables Trestles including trestle foundations,<br />

miscellaneous foundations etc. for 1X210 MW Mejia TPS (Unit-<br />

IV) Project<br />

6 Civil, Structural and Architectural Work of Clarified Water Pump<br />

House, Clarified Water Storage Tank, DM make up water pump<br />

house, filtered water pump house, misc. foundations, etc. for<br />

1X210 MW Mejia TPS (Unit-IV) Project<br />

Civil, Structural & Architectural Construction Work for Ash<br />

Handling System of DVC Mejia Thermal Power Station Unit - IV<br />

(1 X 210 MW)<br />

Execution and Handing Over of Civil Works for 400 / 220 / 110<br />

KV Sub Station<br />

Hooghly Metcoke & Power<br />

Co. Ltd.<br />

DC Industrial Plant<br />

Services Pvt. Ltd.<br />

Bharat<br />

Ltd.<br />

Heavy Electricals<br />

2006-2007 79.43<br />

Taisei Corporation 2002-2006 303.69<br />

Power Grid Corporation of<br />

India Ltd.<br />

Power Grid Corpoartion of<br />

India Ltd.<br />

Bharat<br />

Ltd.<br />

Bharat<br />

Ltd.<br />

Heavy Electricals<br />

Heavy Electricals<br />

2005-2006 66.96<br />

2004-2005 33.48<br />

2003-2005 11.03<br />

2003-2005 6.56<br />

2003-2005<br />

2003-2005<br />

16.06<br />

89.60<br />

35


Sl.<br />

No.<br />

13<br />

14<br />

15<br />

OTHER WORKS EXECUTED FOR THERMAL POWER PLANTS IN <strong>INDIA</strong><br />

Description Owner Period Value<br />

( IRs / Million)<br />

9 Civil, Structural and Architectural Work of Chlorination Plant<br />

Building, Pipe/Cables Trestles including trestle foundations,<br />

miscellaneous foundations etc. for 1X210 MW Mejia TPS (Unit-IV)<br />

Project<br />

10 Civil, Structural and Architectural Work of Clarified Water Pump House,<br />

Clarified Water Storage Tank, DM make up water pump house, filtered<br />

water pump house, misc. foundations, etc. for 1X210 MW Mejia TPS<br />

(Unit-IV) Project<br />

11 Civil, Structural & Architectural Construction Work for Ash Handling<br />

System of DVC Mejia Thermal Power Station Unit - IV (1 X 210<br />

MW)<br />

12 Construction of all Civil Works related to Piling and Foundation including<br />

supply of all materials except those proposed to be supplied by BHEL of<br />

4x30.5 MW GTG, 4x110 TPH HRSG & 2x235 TPH Utility Boilers of<br />

Integrated Power Project at IOCL Panipat Refine<br />

Civil, Structural & Architectural Work of Main Power House, Other<br />

Areas between Transformer Yard & Chimney Area and Design,<br />

Supply, Handling, Erection, Testing, Commissioning of Building<br />

Elevator at 1X210 MW Mejia TPS (Unit-IV)<br />

Civil works for Starter Ash Dyke Package for Talcher Super<br />

Thermal Power Project, Stage-II(4 x 500 MW) (Bidding Document /<br />

Specification No. : CS-4330-331-9)<br />

RTPS Unit - 7 - Civil & Structural works for Station Building at<br />

Raichur Thermal Power Station.<br />

Bharat<br />

Ltd.<br />

Bharat<br />

Ltd.<br />

Bharat<br />

Ltd.<br />

Heavy Electricals<br />

Heavy Electricals<br />

DC Industrial Plant<br />

Services Pvt. Ltd.<br />

Bharat<br />

Ltd.<br />

Heavy Electricals<br />

Heavy Electricals<br />

National Thermal Power<br />

Corpn. Ltd.<br />

Karnataka Power Corpn.<br />

Ltd.<br />

2003-2005 11.03<br />

2003-2005 6.56<br />

2003-2005 16.06<br />

2003-2005 188.31<br />

2002-2005<br />

2000-2003<br />

2000-2003<br />

217.96<br />

145.23<br />

342.72<br />

36


OTHER WORKS EXECUTED FOR THERMAL POWER PLANTS IN <strong>INDIA</strong><br />

Sl.<br />

No.<br />

19<br />

20<br />

21<br />

22<br />

23<br />

24<br />

25<br />

Description Owner Period Value<br />

( IRs / Million)<br />

16 Civil, Structural & Architectural Work for Ash Handling System of 1<br />

X 210 MW Unit#7, Stage - IV for Raichur Thermal Power Station<br />

17 Construction of Civil & Structural and Architectural works for GTG,<br />

HRSG, STG etc. at Valuthur 1 x 95 MW Combined Cycle Power<br />

Project (TNEB)<br />

Ground Improvement by Stone Columns for Left Side<br />

Embankment of Diversion Drain Package - A <strong>AND</strong> B<br />

Civil & Architectural Work of Power House Building (Unit II) at<br />

2X210 MW Bakreswar Thermal Power Project<br />

Construction of Grid Control Building at 400 / 220 / 33 KV Switch<br />

Yard at Bakreswar Thermal Power Project<br />

Civil works of foundation Part - I (Piling & Foundation) package for<br />

Feroze Gandhi Unchahar Thermal Power Project, Stage - II (2x210<br />

MW)<br />

Civil Works for 220 KV. Switchyard for 2X210 MW at Feroz Gandhi<br />

Thermal Power Project<br />

Construction of various structures, units building for Combined<br />

Cycle Power Project<br />

General Civil work Part - II package for Super Thermal Power<br />

Project Stage - II (2x500 mw units) (i/c Bore Cast - in - Situ Piling<br />

work)<br />

DC Industrial Plant<br />

Services Pvt. Ltd.<br />

Bharat<br />

Ltd.<br />

Bharat<br />

Ltd.<br />

Bharat<br />

Ltd.<br />

National Thermal Power<br />

Corpn. Ltd.<br />

Bharat<br />

Ltd.<br />

heavy Electricals<br />

18 Construction of Ash Bund for Bakreswar Thermal Power Project Bharat Heavy Electricals<br />

Ltd.<br />

National Thermal Power<br />

Corporation Ltd.<br />

Heavy Electricals<br />

Heavy Electricals<br />

Heavy Electricals<br />

Essar Projects Ltd.<br />

National Thermal Power<br />

Corpn. Ltd.<br />

2002-2003 29.55<br />

2001-2002 107.05<br />

1998-2002 207.19<br />

2001-2001<br />

1997-2001<br />

1997-1998<br />

1995-1998<br />

1996-1998<br />

1995-1996<br />

1988-1993<br />

27.63<br />

68.36<br />

27.05<br />

97.04<br />

18.70<br />

56.18<br />

92.60<br />

37


Sl.<br />

No.<br />

29<br />

30<br />

31<br />

32<br />

33<br />

34<br />

OTHER WORKS EXECUTED FOR THERMAL POWER PLANTS IN <strong>INDIA</strong><br />

General Civil works for 2X10 MW Captive Power Plant<br />

Description Owner Period Value<br />

( IRs / Million)<br />

26 Civil, Structural & Architectural Works for Construction of<br />

Circulating Water & Low Water Pump House Pipe Racks Time<br />

and Security Building and Fire Fighting Station & Road and<br />

Drainage System for 1x67.5 MW Units for Power Project<br />

27 Civil works for Coal Handling package for Super Thermal Power<br />

Project Stage - II (2x500 mw units)<br />

28 Construction of Civil works of Power House etc. for Bokaro 'B'<br />

Thermal Power Station Unit I, II & III of 210 MW each<br />

Civil works for Power House Complex for 2X10 MW Captive<br />

Power Plant<br />

Site Improvement Work Including Roads and Drains for 2X10 MW<br />

Captive Power Plant at Chinakuri<br />

Civil & Structural works i/c all equipment foundations in Turbo-<br />

Generator Bay of Main Station Building for Second Thermal<br />

Power Station(3 X 210 M.W. Units)<br />

Civil works in foundation for Main Power House, Boiler, ESP, CW<br />

Pump House, CW ducts, Machine Foundations & Superstructure<br />

of CW Pump House for 2 X 110 MW Thermal Power Station<br />

Civil works for Second Thermal Power Station-3 X 210 MW<br />

Units,Stage I-Circulating Water Sustem-Group 'A' -R.C.C.<br />

Pressure Tunnels<br />

Indian Aluminium Co.<br />

Ltd.<br />

National Thermal Power<br />

Corpn. Ltd.<br />

Dishergarh Power Supply<br />

Co. Ltd.<br />

Dishergarh Power Supply<br />

Co. Ltd.<br />

Dishergarh Power Supply<br />

Co. Ltd.<br />

Neyveli Lignite Corpn.<br />

Ltd.<br />

Bharat Heavy Electricals<br />

Ltd.<br />

Neyveli Lignite Corpn.<br />

Ltd.<br />

1990-1993 67.95<br />

1988-1992 90.29<br />

Damodar Valley Corpn. 1980-1991 225.67<br />

1989-1991<br />

1988-1990<br />

1988-1990<br />

1981-1986<br />

1980-1984<br />

1981-1984<br />

18.16<br />

13.30<br />

14.23<br />

51.60<br />

33.00<br />

67.50<br />

38


OTHER WORKS EXECUTED FOR THERMAL POWER PLANTS IN <strong>INDIA</strong><br />

Sl.<br />

No.<br />

37<br />

38<br />

Description Owner Period Value<br />

( IRs / Million)<br />

35 Civil works for Kota Thermal Power Station Project<br />

(2X110 MW Units)<br />

36 Civil works in Foundation for 220/132 KV Substation,Grid<br />

Control Building,Transformer & Super<br />

Structure of Grid Control Building for 2X110 MW<br />

Thermal power Station<br />

Balance Civil works for Unit-V & VI in Thermal Power<br />

Station Expansion Stage-II Proj.<br />

Civil Works for Coal Handling Plant for Obra Thermal<br />

Power Station Extn. Stage-II & III<br />

Rajasthan State Electricity<br />

Board<br />

Orissa State Electricity Board<br />

U.P. State Electricity Board<br />

1979-1983 27.00<br />

Bharat Heavy Electricals Ltd. 1981-1982 17.00<br />

1979-1981<br />

1974-1978<br />

14.40<br />

37.20<br />

39


Sl.<br />

No.<br />

5<br />

6<br />

7<br />

8<br />

9<br />

10<br />

MAJOR WORKS UNDER EXECUTION FOR THERMAL POWER PLANTS IN <strong>INDIA</strong><br />

Description Owner Period Value<br />

( IRs / Million)<br />

1 Main Plant Civil Works and Phase-I for 2X330 MW Power Plant Adani Power Pvt. Ltd. 2006-2008 182.13<br />

2 Construction of Pre-Treatment Plant, Raw and CW Make-up Water<br />

System Package for Rihand Super Thermal Power Project Stage-II<br />

(2X500 MW) on Lumpsum Turnkey Basis<br />

3 Civil & Architectural Work for Main Plant Civil Package of 2 X 250 MW<br />

Unit V & VI at Mejia Thermal Power Station<br />

4 Civil Works in Main Plant Area of 2 X 250 MW Guru Hargobind<br />

Thermal Power Project (GHTP) Stage-II at Lehra Mohabbat, Bhatinda<br />

Erection, Testing & Commissioning of complete Boiler Unit No. 5 at<br />

1X250 MW Mejia TPS (15,772 MT)<br />

Civil, Architectural and Structural Steel Work of 2 X 210 MW<br />

Bakreswar Thermal Power Project Unit 4 & 5 (MP-3)<br />

Civil, Structural and Architectural Works for TG, Power Block Boiler,<br />

ESP and ESP Control Room, etc. for 1X500 MW Sanjay Gandhi<br />

Thermal Power Plant<br />

Civil, Architectural & Structural Work for Ash Handling System of<br />

Sanjay Gandhi T.P.P. 1X500 MW, Unit-5<br />

Erection, Testing & Commissioning of Boiler including structures,<br />

Pressure Parts, Non-Pressure parts, Electrostatic Precipitator,<br />

Rotating Machines, Piping etc. finish painting, assistance for<br />

conducting PG test up to handing over of Unit No. 6, 1X250 MW<br />

Civil, Architectural & Structural Steel works for Coal Handing Plant<br />

package of 2 x 250 MW Mejia TPP Unit - V & VI<br />

National<br />

Power<br />

Ltd.<br />

Thermal<br />

Corporation<br />

Simplex Concrete<br />

Piles (I) Ltd.<br />

Bharat Heavy<br />

Electricals Ltd.<br />

Bharat Heavy<br />

Electricals Ltd.<br />

Bharat Heavy<br />

Electricals Ltd.<br />

Bharat Heavy<br />

Electricals Ltd.<br />

United Conveyor<br />

Corp. (India) Pvt. Ltd.<br />

Bharat Heavy<br />

Electricals Ltd.<br />

Bharat Heavy<br />

Electricals Ltd.<br />

2002-2007 148.70<br />

2004-2008 300.00<br />

2004-2007 170.27<br />

2004-2007<br />

2005-2008<br />

2003-2007<br />

2005-2007<br />

2005-2007<br />

2005-2007<br />

108.00<br />

677.44<br />

1035.69<br />

42.45<br />

108.20<br />

347.06<br />

40


MAJOR WORKS UNDER EXECUTION FOR THERMAL POWER PLANTS IN <strong>INDIA</strong><br />

Sl.<br />

No.<br />

12<br />

13<br />

14<br />

15<br />

16<br />

17<br />

18<br />

Civil Works Pertaining to Coal & Coke Handling system<br />

Description Owner Period Value<br />

( IRs / Million)<br />

11 Erection, Testing & Commissioning of Boiler including Structures,<br />

Pressure Parts, Non Pressure Parts, Air Pre-Heater & Piping of 2 x<br />

210 MW, Unit - 4 & 5, Bakreswar<br />

Civil, Structural, Architectural & Finishing Work of BOP auxilliaries<br />

for 2X250 MW Unit# 1 & 2<br />

Main Civil Works for 2x45 MW CPP - Hooghly Metcoke Power Co.<br />

Ltd.<br />

Construction of all Civil, Steel Structure & Architecture works in main<br />

plant area and BOPs related to buildings and foundations including<br />

supply of all materials except those proposed to be supplied by<br />

BHEL for 2 X 125 MW Units at Barsingsar TPP of M/s.<br />

Execution and Handing over of Civil Works and Earthing Works for<br />

400 KV Substation<br />

Civil Work for Control Room for Weigh Bridge, First Aid Station,<br />

Worker's Canteen, Car Park, Cycle & Scooter Stand, Electrical Sub-<br />

Station with Outdoor Cable Trench & Local Control building<br />

Installation of Cast-in-situ Driven & Bored RCC Pile, Testing, Civil<br />

Foundation Works, Area Grading in compliance with Storm Water<br />

Drainage System including Dismantling of Existing Stairs / Steel<br />

Structures, etc. and other Misc.Civil Work for 1X250 MW Un<br />

Bharat Heavy<br />

Electricals Ltd.<br />

Bharat Heavy<br />

Electricals Ltd.<br />

Tata Projects Ltd.<br />

Bharat Heavy<br />

Electricals Ltd.<br />

Hooghly Met Coke &<br />

Power Co. Ltd.<br />

Bharat Heavy<br />

Electricals Ltd.<br />

Hooghly Met Coke &<br />

Power Co. Ltd.<br />

Bharat Heavy<br />

Electricals Ltd.<br />

2005-2008 183.35<br />

2005-2007<br />

2006-2008<br />

2006-2009<br />

2006-2007<br />

2006-2007<br />

2006-2007<br />

2006-2007<br />

137.05<br />

117.64<br />

547.36<br />

50.44<br />

120.50<br />

17.46<br />

124.14<br />

41


SELF ASSESSED CAPABILITY<br />

42


SELF ASSESSED EXECUTION CAPABILITIES IN SINGLE PROJECT<br />

KEY ACTIVITY<br />

(Including all other related activities & Ancillary activities)<br />

PER YEAR CAPACITY IN<br />

A SINGLE PROJECT<br />

MONTHLY<br />

CAPACITY<br />

(PEAK PERIOD)<br />

‣<strong>CO</strong>NCRETING (SUB-STRUCTURE & SUPER<br />

STRUCTURE)<br />

1,00,000 CUM 12,000 CUM<br />

‣FABRICATION & ERECTION OF STRUCTURAL<br />

WORKS<br />

25000 MT 2500 MT<br />

‣PIPING WORK OF VARIOUS THICKNESS & SIZES 10000 MT 800 MT<br />

Note: The capabilities may be augmented depends upon the magnitude of the work.<br />

43


PICTORIAL PRESENTATION<br />

OF<br />

SPECIFIC WORKS<br />

EXECUTED / UNDER EXECUTION<br />

FOR<br />

IMPLEMENTATION OF<br />

THERMAL POWER PLANT<br />

44


Power Plant Constructed / Under Construction By<br />

<strong>BRIDGE</strong> <strong>AND</strong> <strong>ROOF</strong> <strong>CO</strong>. (I) LTD.<br />

Civil, Structural and Architectural<br />

Works for TG, Power Block Boiler,<br />

ESP and ESP Control Room etc. for<br />

1x500 MW Sanjay Gandhi Thermal<br />

Power Plant at BHEL, Birsinghpur<br />

45


Power Plant Constructed / Under Construction By<br />

<strong>BRIDGE</strong> <strong>AND</strong> <strong>ROOF</strong> <strong>CO</strong>. (I) LTD.<br />

Erection, Testing & Commissioning of Boiler Main<br />

(130 MT at Elevation 56M) at 1x210 MW Mejia TPS<br />

(Unit-IV) of DVC<br />

46


Power Plant Constructed / Under Construction By<br />

<strong>BRIDGE</strong> <strong>AND</strong> <strong>ROOF</strong> <strong>CO</strong>. (I) LTD.<br />

29800 MT of Structural<br />

Steel work in Power House,<br />

Switch Yard and Mill Bay for<br />

Mejia Thermal Power<br />

Project of DVC<br />

View of Power House of Mejia<br />

Thermal Power Station of M/s.<br />

BHEL at Bankura, West Bengal<br />

47


Power Plant Constructed / Under Construction By<br />

<strong>BRIDGE</strong> <strong>AND</strong> <strong>ROOF</strong> <strong>CO</strong>. (I) LTD.<br />

Electro Static Precipitator<br />

Structures - Structural Work in<br />

progress at Farakka for NTPC<br />

A view from the North East Side of<br />

the Track Hopper Raft below 12.0<br />

m from G.L. at Farakka Super<br />

Thermal Power Project for NTPC<br />

48


Power Plant Constructed / Under Construction By<br />

<strong>BRIDGE</strong> <strong>AND</strong> <strong>ROOF</strong> <strong>CO</strong>. (I) LTD.<br />

Mill Bay Structure for NTPC<br />

Unchahar Super Thermal<br />

Power Station<br />

Power House Building Unit-I at<br />

NTPC Simhadri<br />

49


Power Plant Constructed / Under Construction By<br />

<strong>BRIDGE</strong> <strong>AND</strong> <strong>ROOF</strong> <strong>CO</strong>. (I) LTD.<br />

Erection of 27M x 7.5M x<br />

6.5M Conveyor Gallery at a<br />

height of 70.0 M at NTPC<br />

Simahdri<br />

Switch Yard for Bakreswar Thermal<br />

Power Station<br />

50


Power Plant Constructed / Under Construction By<br />

<strong>BRIDGE</strong> <strong>AND</strong> <strong>ROOF</strong> <strong>CO</strong>. (I) LTD.<br />

Structural Steel Work for<br />

Bakreswar Thermal Power<br />

Station for WBPDC<br />

Upper Dam Diversion Culvert Works<br />

for Purulia Pumped Storage Project<br />

for M/s. Taisel Corporation at<br />

Purulia, West Bengal<br />

51


Power Plant Constructed / Under Construction By<br />

<strong>BRIDGE</strong> <strong>AND</strong> <strong>ROOF</strong> <strong>CO</strong>. (I) LTD.<br />

Tailrace Outlet Works for Purulia<br />

Pumped Storage Project for M/s.<br />

Taisel Corporation at Purulia, West<br />

Bengal<br />

Upper Dam Diversion Culvert Works<br />

for Purulia Pumped Storage Project<br />

for M/s. Taisel Corporation at<br />

Purulia, West Bengal<br />

52


Power Plant Constructed / Under Construction By<br />

<strong>BRIDGE</strong> <strong>AND</strong> <strong>ROOF</strong> <strong>CO</strong>. (I) LTD.<br />

Out Let Trash Rack Line 3-4 for<br />

Purulia Pumped Storage Project for<br />

M/s. Taisel Corporation at Purulia,<br />

under State Electricity Board, West<br />

Bengal<br />

Outside View of Cell of KARP<br />

Project at IGCAR, Kalpakkam<br />

53


VISION<br />

IN LINE WITH THE HUGE DEVELOPMENT <strong>AND</strong> INVESTMENT IN<br />

INFRASTRUCTURAL SECTOR, B&R IS <strong>CO</strong>MMITTED TO AGGRESSIVE GROWTH .<br />

THE MARKET SCENARIO FOR <strong>CO</strong>NSTRUCTION HAS PICKED UP <strong>AND</strong> THIS<br />

BOOM IS EXPECTED TO <strong>CO</strong>NTINUE FOR FEW MORE YEARS. IN ORDER TO<br />

TAKE ADVANTAGE OF THIS BOOM, B&R HAS AUGMENTED ITS RESOURCE<br />

BASE <strong>AND</strong> PLANS TO INCREASE ITS TURNOVER TO MORE THAN RS. 2,500<br />

CRORES BY THE YEAR 2015.<br />

VISION OF B&R IN THE ERA OF GLOBALIZATION <strong>AND</strong> LIBERALIZATION IS<br />

TO EMERGE AS A LEADER IN <strong>CO</strong>NSTRUCTION <strong>AND</strong> PROJECT MANAGEMENT<br />

SERVICES IN <strong>INDIA</strong> <strong>AND</strong> SELECTED FOREIGN MARKETS <strong>AND</strong> PROVIDE<br />

LATEST TECHNOLOGY OF INTERNATIONAL ST<strong>AND</strong>ARD TO ITS CUSTOMERS<br />

<strong>CO</strong>UPLED WITH HIGHEST LEVEL OF CUSTOMER SATISFACTION THROUGH<br />

REQUISITE CUSTOMER SERVICE.<br />

54


VISION<br />

<strong>BRIDGE</strong> & <strong>ROOF</strong> <strong>CO</strong>. (I) LTD. IS KEEN TO AUGMENT IN VARIOUS <strong>CO</strong>RE<br />

SECTORS IN FUTURE.<br />

AUGMENTATION IN POWER SECTOR WILL BE ONE OF THE KEY FACTOR OF<br />

FUTURE EXPANSION.<br />

IDENTIFIED AREAS OF AUGMENTATION<br />

1) VARIOUS TYPES OF CIVIL WORKS IN HYDEL POWER PROJECT.<br />

2) FABRICATION, INSTALLATION, <strong>CO</strong>MMISSIONING OF HYDRO<br />

MECHANICAL & HYDRO ELECTRICAL EQUIPMENTS.<br />

3) FABRICATION & ERECTION OF TRANSMISSION/ DISTRIBUTION TOWER<br />

4) SUPPLY, PROCUREMENT, FABRICATION, ERECTION & <strong>CO</strong>MMISSIONING<br />

OF MATERIAL H<strong>AND</strong>LING SYSTEM.<br />

5) RAW WATER TREATMENT PLANT.<br />

55


VISION<br />

RESOURCE PLANNING IS ALSO ONE OF THE KEY FACTOR FOR<br />

AUGMENTATION.<br />

WE EXPECT TO INCREASE OF ABOUT 20% - 30% STAKE IN POWER SECTOR<br />

FROM THE PRESENT SCENARIO.<br />

TO INCREASE, WE ARE PLANNING TO AUGMENT THE VARIOUS RESOURCES<br />

IN TERMS OF MACHINERIES & MANPOWER.<br />

ADVANCED & HIGHER CAPACITY OF MACHINERIES, LIFTING TOOLS &<br />

EXPERIENCED <strong>AND</strong> DEDICATED MANPOWER <strong>CO</strong>MPRISING OF SUPERVISORY<br />

PERSONNEL, SKILLED MANPOWER HAVE ALREADY BEEN FOCUSED FOR<br />

AUGMENTATION .<br />

56


THANK YOU !<br />