27.07.2014 Views

Power Transmission and Distribution - Infraline

Power Transmission and Distribution - Infraline

Power Transmission and Distribution - Infraline

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Experience <strong>Power</strong> Contro<br />

New Trends in City SCADA<br />

– Central Board of Irrigation & <strong>Power</strong>, India<br />

© <strong>Power</strong> <strong>Transmission</strong> & <strong>Distribution</strong> Energy Automatio


SIEMENS is one of the largest companies in its field<br />

119.0<br />

in bns. of €<br />

in bns. of €<br />

Total sales<br />

Sales in electrical engineering <strong>and</strong> electronics<br />

er 150<br />

rs of<br />

erience<br />

77.8<br />

73.9<br />

75.2<br />

67.7<br />

67.4<br />

65.6<br />

63.7<br />

61.6<br />

58.5<br />

55.9<br />

54.5<br />

30.9<br />

49.2<br />

43.6<br />

49.0<br />

43.4<br />

38.8<br />

39.1 38.<br />

GE IBM Siemens<br />

Hitachi<br />

Matsushita<br />

Hewlett-<br />

Packard<br />

Sony<br />

Samsung<br />

Electronics<br />

Toshiba<br />

Del<br />

Page 2 July-07 <strong>Power</strong> <strong>Transmission</strong> <strong>and</strong> <strong>Distribution</strong>


<strong>Power</strong> <strong>Transmission</strong> <strong>and</strong> <strong>Distribution</strong> (PTD)<br />

Our Product Range & Type of Business<br />

pe of<br />

siness<br />

Services<br />

%<br />

roducts<br />

%<br />

ystems<br />

Turnkey Solutions<br />

• Complete power<br />

transmission <strong>and</strong><br />

distribution systems<br />

• Transformer<br />

substations<br />

• HVDC systems<br />

• <strong>Power</strong> distribution<br />

systems, urban<br />

networks<br />

Systems<br />

• High-voltage switchgear<br />

• Static var compensation<br />

equipment<br />

• Decentralized energy supply<br />

systems<br />

• Medium-voltage switchgear<br />

• Substations<br />

• Load-center substations<br />

• <strong>Power</strong> systems control<br />

• Energy management systems<br />

• Substation control systems<br />

• Protection systems<br />

• Recording systems<br />

• Energy meter management<br />

• IT-solutions for generation-,<br />

transmission-, <strong>and</strong> distribution<br />

companies <strong>and</strong> energy suppliers<br />

<strong>and</strong> traders<br />

Products<br />

• High-voltage<br />

components<br />

• Medium-voltage<br />

components<br />

• Transformers,<br />

reactors<br />

Services<br />

• Maintenance <strong>and</strong><br />

spare parts<br />

• Installation, retrof<br />

<strong>and</strong> monitoring<br />

• Outsourcing proje<br />

<strong>and</strong> operation<br />

• Network analysis<br />

<strong>and</strong> consulting<br />

• Energy concepts<br />

<strong>and</strong> innovation<br />

• Education <strong>and</strong><br />

training<br />

Page 3 July-07 <strong>Power</strong> <strong>Transmission</strong> <strong>and</strong> <strong>Distribution</strong>


omplete Solutions with Vertical <strong>and</strong> Horizontal<br />

teroperability<br />

tegrated utility<br />

usiness operation<br />

F&C<br />

Marketing<br />

Enterprise Bus<br />

Asset<br />

management Data<br />

warehouse<br />

...<br />

Energy Sales<br />

& Care<br />

Business<br />

Services<br />

dded value network<br />

anagement & optimization<br />

pplications <strong>and</strong> systems)<br />

etwork control &<br />

pervision<br />

ingle-or multi-utility)<br />

ommunication<br />

ield data acquisition,<br />

cal control & automation<br />

Partner,<br />

market, etc.<br />

Advanced applications<br />

(EMS, DMS, EBM, Trading)<br />

DB<br />

$ Trader<br />

Local<br />

automation<br />

Multi-site<br />

SCADA<br />

etc.<br />

Substation<br />

automation<br />

Network<br />

planning<br />

Protection<br />

Network<br />

information<br />

Private & public networks<br />

RTUs<br />

...<br />

Meter data<br />

management<br />

Information<br />

gateway<br />

Meters<br />

xxxx x xxx xxx xx<br />

Gateway<br />

<strong>Power</strong><br />

Exchange<br />

IT Integration<br />

Administration<br />

Operation, BPO<br />

E-Commerce<br />

Maintenance<br />

Page 4 July-07 <strong>Power</strong> <strong>Transmission</strong> <strong>and</strong> <strong>Distribution</strong>


Overview<br />

Dynamic Environment <strong>and</strong><br />

Technology<br />

Page 5 July-07 <strong>Power</strong> <strong>Transmission</strong> <strong>and</strong> <strong>Distribution</strong>


Markets, market development <strong>and</strong> characteristics<br />

Long-distance<br />

transmission<br />

Higher voltage<br />

levels<br />

Isolated<br />

small grids<br />

High<br />

investments<br />

Formation of<br />

interconnected<br />

networks<br />

More investments<br />

in distribution<br />

<strong>Transmission</strong><br />

bottlenecks<br />

Decentralized power<br />

supplies<br />

Dem<strong>and</strong> for<br />

clean power<br />

<strong>and</strong> high quality<br />

Least cost<br />

planning<br />

New<br />

technologies<br />

& trends<br />

Energy<br />

imports<br />

Saturated<br />

markets<br />

Developing countries<br />

Emerging countries<br />

Industrialized countries<br />

Page 6 July-07 <strong>Power</strong> <strong>Transmission</strong> <strong>and</strong> <strong>Distribution</strong><br />

y Automation Page 6


Market Environment –pressure for radical changes<br />

Deregulation<br />

• new players <strong>and</strong> trading<br />

• competition <strong>and</strong> new strategies<br />

• cost pressure<br />

• improvement of productivity<br />

• increased customer orientation<br />

• Reporting to Regulator<br />

Globalization<br />

• mergers & acquisitions<br />

• Change in number of utilities<br />

• global markets <strong>and</strong> shares<br />

• share holder value<br />

Private Investment<br />

• fast return on investment<br />

• highest profit <strong>and</strong> minimized risks<br />

• investment only, where cash is<br />

made<br />

• diversification <strong>and</strong> multi utilities<br />

New Technologies<br />

• Information Technology<br />

• e-Business<br />

• Communications<br />

Page 7 July-07 <strong>Power</strong> <strong>Transmission</strong> <strong>and</strong> <strong>Distribution</strong>


Need for SCADA/ Automation ?<br />

For Indian Utilities, changes are<br />

happening very fast<br />

It t is time to Raise the Bar<br />

No o choice but to improve performance<br />

Page 8 July-07 <strong>Power</strong> <strong>Transmission</strong> <strong>and</strong> <strong>Distribution</strong>


What do Utilities need from SCADA/ Automation ?<br />

•On-line Network Status Status<br />

•More Reliable <strong>and</strong> <strong>and</strong> More More Economic Energy Energy <strong>Distribution</strong><br />

•Reduced Duration of of Outages<br />

•Increased Reliability of of Operations<br />

•Archival Data Data for for Regulators <strong>and</strong> <strong>and</strong> Load Load Forecasting<br />

•More Comprehensive <strong>and</strong> <strong>and</strong> Efficient Management of of Customers Relations<br />

•Integration with with other other IT IT Applications- GIS, GIS, ERP, ERP, etc. etc.<br />

•Possibility to to use use Multi-Vendor Products – Industry St<strong>and</strong>ard Protocols<br />

•Back Up Up Control Centre Centre (( for for Emergencies ))<br />

•Monitoring of of Unscheduled Interchanges – e.g. e.g. ABT ABT<br />

Page 9 July-07 <strong>Power</strong> <strong>Transmission</strong> <strong>and</strong> <strong>Distribution</strong>


Latest Trends for City SCADA (1)<br />

High B<strong>and</strong>width Communication Network<br />

• Fibre Optic<br />

• Ethernet Radio<br />

• Digital PLCC<br />

SCADA Plus DMS / EMS Applications<br />

• Jumpers, Cuts & Grounds)<br />

• Trace functions (Up, down, between, etc.)<br />

• Switching Procedure Management<br />

• Outage Management System incl. Trouble Call system<br />

• Crew Management System<br />

• Fault Isolation <strong>and</strong> Service Restoration<br />

• <strong>Distribution</strong> <strong>Power</strong> Flow<br />

• Graphical Query<br />

• State Estimator<br />

• Forecast Applications, Etc<br />

Integration with I.T. Applications<br />

Linked to Corporate IT world ERP, Billing, GIS<br />

Page 10 July-07 <strong>Power</strong> <strong>Transmission</strong> <strong>and</strong> <strong>Distribution</strong>


Latest Trends for City SCADA (2)<br />

Back Up Control Centre<br />

• For Redundancy in case of Emergencies (Natural Calamities or Law & Order)<br />

• Network Operations can be taken up region wise or time of day wise<br />

Integration with Multi Party Field Devices<br />

• Vendor independence a reality with st<strong>and</strong>ards such as IEC-60870-104 or IEC 618<br />

• RTU or IEDs monitoring network upto 11kV<br />

Dispatcher Training Simulator<br />

• Invaluable experience for Operators for learning<br />

• Real Data available for practice<br />

• Store historical events <strong>and</strong> re-create scenarios<br />

Video Projection System<br />

• Operators can view the entire network<br />

• A number of screens including video can be viewed at same time<br />

• Less strain on Operators<br />

Page 11 July-07 <strong>Power</strong> <strong>Transmission</strong> <strong>and</strong> <strong>Distribution</strong>


Application Portfolio <strong>and</strong> addressed Market Segments<br />

T<br />

M<br />

S<br />

Energy Trading<br />

Risk Management<br />

Energy Sales,<br />

Customer Management<br />

Trading<br />

Generation<br />

ES<br />

ET<br />

SA<br />

PA<br />

RM<br />

ITS<br />

DW<br />

HFD<br />

TS Interchange Transaction<br />

A Scheduling Applications<br />

A <strong>Power</strong> Applications<br />

NA <strong>Transmission</strong> Network Applications<br />

TS Dispatcher Training Simulator<br />

SCADA<br />

CFE<br />

UI<br />

BS<br />

FA<br />

DTS<br />

CA<br />

SCADA<br />

SDM<br />

Tools<br />

TNA<br />

MS<br />

DNA<br />

VVC<br />

OFR<br />

<strong>Transmission</strong><br />

<strong>Distribution</strong><br />

FISR<br />

OMS<br />

CMS<br />

NTLO<br />

TCS<br />

• CFE<br />

• CA<br />

• SCADA<br />

• MS<br />

• DNA<br />

• VVC<br />

• FISR<br />

• OMS<br />

• CMS<br />

• TCS<br />

• OFR<br />

• NTLO<br />

• BS<br />

• SDM<br />

• UI<br />

• DW<br />

• HFD<br />

• FA<br />

Communication Front-End<br />

Communication Apps<br />

Supervisory Control<br />

Multi-site<br />

Base System<br />

Source Data Management<br />

User Interface<br />

Data Warehouse<br />

Historical <strong>and</strong> Future Data<br />

Forecast Applications<br />

<strong>Distribution</strong> Network Application<br />

Volt/Var Control<br />

Fault Isolation/System Restoration<br />

Outage Management<br />

Crew Management System<br />

Trouble Call System<br />

Optimal Feeder Reconfiguration<br />

Non-Technical Losses<br />

Page 12 July-07 <strong>Power</strong> <strong>Transmission</strong> <strong>and</strong> <strong>Distribution</strong>


St<strong>and</strong>ardised Data Interfaces to SINAUT Spectrum<br />

IEC 60870-5<br />

IEC 60870-6 (ICCP)<br />

SDM<br />

Field<br />

Data<br />

HIS<br />

SQL<br />

IDDUG<br />

Engineering<br />

Data<br />

Archived<br />

Data<br />

ODBC<br />

SQL<br />

SQL<br />

ODB<br />

Real-time<br />

Data<br />

Generation<br />

Application<br />

Data<br />

Schedule<br />

Data<br />

DWH<br />

ODBC/<br />

SQL<br />

DWH<br />

DWH<br />

ODB<br />

SQL<br />

Data Warehouse<br />

Operational Database<br />

Structured Query Language<br />

ODBC/<br />

SQL<br />

Page 13 July-07 <strong>Power</strong> <strong>Transmission</strong> <strong>and</strong> <strong>Distribution</strong>


Example: Main/Regional Configuration<br />

Information Network<br />

(RTUs, ICCP, ...)<br />

Main<br />

Control Center<br />

Regional<br />

Control Center<br />

Regional<br />

Control Center<br />

Regional<br />

Control Center<br />

Information Network<br />

(RTUs, ICCP, ...)<br />

Information Network<br />

(RTUs, ICCP, ...)<br />

Information Network<br />

(RTUs, ICCP, ...)<br />

Page 14 July-07 <strong>Power</strong> <strong>Transmission</strong> <strong>and</strong> <strong>Distribution</strong>


Example: Main/Backup Configuration<br />

Main<br />

Control Center<br />

Backup<br />

Control Center<br />

Information Network<br />

(RTUs, ICCP, ...)<br />

Information Network<br />

(RTUs, ICCP, ...)<br />

Information Network<br />

(RTUs, ICCP, ...)<br />

Page 15 July-07 <strong>Power</strong> <strong>Transmission</strong> <strong>and</strong> <strong>Distribution</strong>


Suggested Phase-Wise<br />

Implementation for City SCADA<br />

Page 16 July-07 <strong>Power</strong> <strong>Transmission</strong> <strong>and</strong> <strong>Distribution</strong>


Function packages<br />

Phase 1<br />

SCADA Network<br />

Management Package<br />

SCADA<br />

SCADA<br />

Archiving Archiving<br />

& Reporting<br />

Reporting<br />

Schematic<br />

Schematic<br />

Displays<br />

Displays<br />

Communication<br />

Communication<br />

Page 17 July-07 <strong>Power</strong> <strong>Transmission</strong> <strong>and</strong> <strong>Distribution</strong>


uggested Implementation Roadmap Phase 1<br />

High Voltage<br />

Medium Voltage<br />

Low Voltage<br />

Remote<br />

Terminal Unit<br />

Subsystem<br />

SCADA/DMS SCADA/DMS<br />

System<br />

System<br />

HV Network<br />

HV Network<br />

HV/MV Substations<br />

HV/MV Substations<br />

Feeder Head<br />

Feeder Switches<br />

Head Switches<br />

Communication<br />

Communication<br />

RTUs in<br />

RTUs the<br />

in HV/MV<br />

the Substations<br />

HV/MV Substations<br />

Communication Front<br />

Communication End<br />

Front End<br />

GIS GIS<br />

System<br />

System<br />

MV Network<br />

MV Network<br />

Street maps<br />

Street maps<br />

Customer Customer<br />

Care Care<br />

&<br />

Billing Billing<br />

System (Optional)<br />

System (Optional)<br />

Benefits<br />

More<br />

More<br />

Reliable<br />

Reliable<br />

<strong>and</strong><br />

<strong>and</strong><br />

More<br />

More<br />

Economic<br />

Economic<br />

Energy<br />

Energy<br />

<strong>Distribution</strong><br />

<strong>Distribution</strong><br />

More efficient planning due to archived<br />

More efficient planning due to archived<br />

information.<br />

information.<br />

Less <strong>and</strong> shorter outages lead to increased<br />

Less <strong>and</strong> shorter outages lead to increased<br />

revenue.<br />

revenue.<br />

Increased operation security based on<br />

Increased operation security based on<br />

telemetered information.<br />

telemetered information.<br />

Reduced Reduced<br />

Duration Duration<br />

of of<br />

Outages<br />

Outages<br />

Faster orientation<br />

Faster for<br />

orientation field<br />

for crews<br />

field crews<br />

More More<br />

Comprehensive Comprehensive<br />

<strong>and</strong> <strong>and</strong><br />

More More<br />

Efficient<br />

Efficient<br />

Management Management<br />

of of<br />

Customers<br />

Customers<br />

More satisfied<br />

More customers<br />

satisfied customers<br />

Page 18 July-07 <strong>Power</strong> <strong>Transmission</strong> <strong>and</strong> <strong>Distribution</strong>


SINAUT Spectrum System Architecture SCADA/DMS<br />

Phase 1<br />

Operator Console<br />

Operator Console<br />

System Administrator<br />

Console<br />

User<br />

Interface<br />

. . .<br />

User<br />

Interface<br />

Engineering<br />

Programming<br />

Data -<br />

Administration<br />

Spare<br />

Redundancy<br />

LAN-Segments<br />

UI<br />

UI<br />

UI<br />

Source Data<br />

Management<br />

SDM<br />

Archive HIS<br />

Administration<br />

ADM<br />

Tele-control<br />

Tele-control<br />

Interface<br />

Interface<br />

TCI<br />

TCI<br />

SCADA<br />

Functions<br />

SCADA<br />

Functions<br />

SCADA<br />

SCADA<br />

Office LAN<br />

to/from RTUs<br />

PC<br />

PC<br />

Possible additional components<br />

Redundant components<br />

(hot-st<strong>and</strong>by-redundancy)<br />

GIS<br />

Customer Care &<br />

Billing System<br />

Page 19 July-07 <strong>Power</strong> <strong>Transmission</strong> <strong>and</strong> <strong>Distribution</strong>


Function packages<br />

Phase 2<br />

SCADA Network<br />

Management Package<br />

SCADA<br />

SCADA<br />

Archiving Archiving<br />

& Reporting<br />

Reporting<br />

Schematic<br />

Schematic<br />

Displays<br />

Displays<br />

Communication<br />

Communication<br />

Geographical<br />

Geographical<br />

Displays<br />

Displays<br />

Efficient Network<br />

Management Package<br />

Fault Fault<br />

Isolation Isolation<br />

&<br />

Service Service<br />

Restoration<br />

Restoration<br />

Outage Outage<br />

Management<br />

Management<br />

System<br />

System<br />

Switching Switching<br />

Procedure<br />

Procedure<br />

Management<br />

Management<br />

Reliable Network<br />

Management Package<br />

Optimal Optimal<br />

Feeder<br />

Feeder<br />

Reconfiguration<br />

Reconfiguration<br />

Volt/Var<br />

Volt/Var<br />

Var Dispatch<br />

Dispatch<br />

<strong>Distribution</strong> <strong>Distribution</strong><br />

<strong>Power</strong><br />

<strong>Power</strong><br />

Flow<br />

Flow<br />

Page 20 July-07 <strong>Power</strong> <strong>Transmission</strong> <strong>and</strong> <strong>Distribution</strong>


Suggested Implementation Roadmap Phase 2<br />

Subsystem<br />

Benefits<br />

igh High Voltage<br />

Medium Voltage<br />

Low Voltage<br />

Remote<br />

Terminal Unit<br />

edium Voltage<br />

ow Voltage<br />

SCADA/ SCADA/<br />

DMS DMS<br />

System<br />

System<br />

MV Network<br />

MV Network<br />

MV/LV <strong>Distribution</strong><br />

MV/LV transformers<br />

<strong>Distribution</strong> transformers<br />

GIS Import<br />

GIS (MV<br />

Import Network)<br />

(MV Network)<br />

Communication<br />

Communication<br />

RTUs at<br />

RTUs important<br />

at switches<br />

important switches<br />

(remote controllable)<br />

(remote in<br />

controllable) the<br />

in MV<br />

the MV<br />

network <strong>and</strong><br />

network at<br />

<strong>and</strong> important<br />

at important<br />

distribution transformers<br />

distribution transformers<br />

Outage Outage<br />

Management<br />

Management<br />

Trouble Call<br />

Trouble &<br />

Call Crew<br />

& Management<br />

Crew Management<br />

Fault Location<br />

Fault Location<br />

DMS DMS<br />

Applications<br />

Applications<br />

Fault Isolation<br />

Fault &<br />

Isolation Service<br />

& Service<br />

Restoration<br />

Restoration<br />

<strong>Distribution</strong> <strong>Power</strong><br />

<strong>Distribution</strong> Flow<br />

<strong>Power</strong> Flow<br />

Faster Faster<br />

Reconfiguration Reconfiguration<br />

of of<br />

the the<br />

network<br />

network<br />

Shorter outages due to remote control at<br />

Shorter outages due to remote control at<br />

important MV switching points<br />

important MV switching points<br />

Reduction of staff in remote outstations<br />

Reduction of staff in remote outstations<br />

More efficient planning due to archived<br />

More efficient planning due to archived<br />

information.<br />

information.<br />

Faster Faster<br />

Re-Supply Re-Supply for for<br />

Customers<br />

Customers<br />

More efficient<br />

More use<br />

efficient of<br />

use working<br />

of crews<br />

working crews<br />

Increased reliability<br />

Increased from<br />

reliability integrated<br />

from workflows<br />

integrated workflows<br />

Increased Increased<br />

Reliability Reliability<br />

of of<br />

Operational<br />

Operational<br />

Planning<br />

Planning<br />

All important<br />

All switching<br />

important based<br />

switching on<br />

based on<br />

before-the<br />

before-the-fact<br />

the-fact<br />

load flow<br />

load checks<br />

flow checks<br />

Page 21 July-07 <strong>Power</strong> <strong>Transmission</strong> <strong>and</strong> <strong>Distribution</strong>


SINAUT Spectrum System Architecture SCADA/DMS<br />

Phase 2<br />

Operator Console<br />

Operator Console<br />

System Administrator<br />

Console<br />

Remote<br />

Console<br />

Communication<br />

with other<br />

control centers<br />

(ICCP, ELCOM)<br />

User<br />

Interface<br />

. . .<br />

User<br />

Interface<br />

Engineering<br />

Programming<br />

Data<br />

Administration<br />

Communication<br />

Communication<br />

Applications<br />

Applications<br />

Spare<br />

Redundancy<br />

LAN-<br />

Segments<br />

UI<br />

UI<br />

UI<br />

CA<br />

CA<br />

Source Data<br />

Management<br />

SDM<br />

Archive HIS<br />

Administration<br />

ADM<br />

Tele-control<br />

Tele-control<br />

Interface<br />

Interface<br />

TCI<br />

TCI<br />

SCADA<br />

Functions<br />

SCADA<br />

Functions<br />

SCADA<br />

SCADA<br />

Office LAN<br />

<strong>Distribution</strong><br />

Management<br />

System<br />

DMS<br />

Bridge<br />

to/from RTUs<br />

PC<br />

PC<br />

Possible additional components<br />

Redundant components<br />

(hot-st<strong>and</strong>by-redundancy)<br />

GIS<br />

Customer Care &<br />

Billing System<br />

Page 22 July-07 <strong>Power</strong> <strong>Transmission</strong> <strong>and</strong> <strong>Distribution</strong>


Timeper<br />

Implementation Roadmap Time Schedule<br />

PHASE 1 PHASE 2<br />

Small DMS Networks<br />

Medium/Large DMS Networks<br />

12 Month<br />

18 Month<br />

24 Month<br />

36 Month<br />

Page 23 July-07 <strong>Power</strong> <strong>Transmission</strong> <strong>and</strong> <strong>Distribution</strong>


Communication between RTU <strong>and</strong> SCADA/DMS<br />

• Fiber Optic Cable<br />

• <strong>Power</strong> Line Carrier<br />

• Radio Frequency<br />

• Dial-Up RTU<br />

Page 24 July-07 <strong>Power</strong> <strong>Transmission</strong> <strong>and</strong> <strong>Distribution</strong>


Advantages of an integrated OMS solution compared<br />

to a GIS-based OMS solution<br />

Automatic Creation of Outages after SCADA Events<br />

• Integrated within the SCADA system<br />

High Performance<br />

• It is designed as an online system<br />

• No performance impact by continuous daily data changes<br />

(like in a GIS system)<br />

• No performance impact by other users - only electrical outages <strong>and</strong> cre<br />

are h<strong>and</strong>led<br />

High Availability concept<br />

• Hot St<strong>and</strong>by Redundancy<br />

• No Data Loss of outages in the network<br />

Page 25 July-07 <strong>Power</strong> <strong>Transmission</strong> <strong>and</strong> <strong>Distribution</strong>


Integration of external systems (e.g. OMS)<br />

• Siemens has rich experience with the integration of external systems, e.g.<br />

• Outage Management System<br />

• Customer Care <strong>and</strong> Billing System<br />

• Trouble Call System<br />

• GIS<br />

• Asset Management System<br />

• Siemens has done most integration projects especially for DMS customers<br />

• Applied interface technologies<br />

• ASCII File Transfer<br />

• XML File Transfer<br />

• ORACLE Access<br />

• Middleware (e.g. TIBCO, Sagavista, ...)<br />

Page 26 July-07 <strong>Power</strong> <strong>Transmission</strong> <strong>and</strong> <strong>Distribution</strong>


eference list of projects with integration of<br />

xternal systems<br />

ENELVEN – Venezuela<br />

Interface to SAP via Middleware, GPS Interface<br />

BIRKANAET – Stockholm, Sweden<br />

Outage Request /Trouble Calls Input via Internet,Customer Announcement for planned wo<br />

MERALCO – Manila, Philippines<br />

Interface to a Workforce Management, Trouble Call /Maintenance Management Tool<br />

IBERDROLA – Bilbao, Spain<br />

Integration of a customer specific Outage <strong>and</strong> Trouble Call Management system<br />

Linz AG – Austria<br />

Integration of Trouble Calls for different areas (Electricity, Water, Gas)<br />

NDPL<br />

Integration with GE Small World GIS<br />

Page 27 July-07 <strong>Power</strong> <strong>Transmission</strong> <strong>and</strong> <strong>Distribution</strong>


PTD Energy Automation (PTD EA)<br />

Fit for the Energy Market with the EA Products & Solution<br />

Control Center & EMM Solutions<br />

Spectrum <strong>Power</strong> Family<br />

Substation Automation<br />

SICAM PAS<br />

ommunication<br />

roducts & Solutions<br />

ower Link<br />

All-in-One Integrated Solutions<br />

PTD Energy Automation<br />

Protection<br />

SIPROTEC Family<br />

<strong>Power</strong> Quality<br />

SIMEAS Family<br />

Field Device<br />

SICAM RTU<br />

Page 28 July-07 <strong>Power</strong> <strong>Transmission</strong> <strong>and</strong> <strong>Distribution</strong>


References & Benefits<br />

Page 29 July-07 <strong>Power</strong> <strong>Transmission</strong> <strong>and</strong> <strong>Distribution</strong>


SINAUT® Spectrum<br />

International Locations of >400 SINAUT Spectrum Projects<br />

2<br />

2<br />

31<br />

1<br />

5<br />

6<br />

2<br />

12 4<br />

2 10 7 12<br />

1<br />

55<br />

3 4 18<br />

62<br />

1<br />

3<br />

12<br />

11<br />

4<br />

23 7 8<br />

3<br />

7 2 2<br />

1<br />

1 5 4<br />

7 2 1<br />

1<br />

3<br />

6<br />

1<br />

3<br />

3<br />

7<br />

1<br />

7<br />

1<br />

13<br />

2<br />

10<br />

5<br />

1<br />

4<br />

6<br />

8<br />

2<br />

1<br />

2<br />

1<br />

1<br />

1<br />

1<br />

2<br />

1<br />

Benefit from the experience of more than 18001<br />

Control Systems delivered for a<br />

Customer Segments <strong>and</strong> in all regions of the world<br />

Page 30 July-07 <strong>Power</strong> <strong>Transmission</strong> <strong>and</strong> <strong>Distribution</strong>


iemens always in the forefront of <strong>Power</strong> System<br />

ontrol in India<br />

1980s – SCADA for NREB, EREB <strong>and</strong><br />

MSEB R-30 based systems<br />

1990s – CESC Ltd, REL (BSES Ltd),<br />

MSEB, RSEB, TISCO<br />

2000 onwards<br />

MSEB EMS<br />

NDPL<br />

CESC Ltd<br />

PGCIL – GEB Baroda city<br />

..<br />

…<br />

….<br />

GEB GEB Baroda<br />

MSEB MSEB<br />

NDPL NDPL<br />

CESC CESC<br />

Page 31 July-07 <strong>Power</strong> <strong>Transmission</strong> <strong>and</strong> <strong>Distribution</strong>


North Delhi <strong>Power</strong> Limited<br />

Special servers for Delhi's Earthquake Zone<br />

Page 32 July-07 <strong>Power</strong> <strong>Transmission</strong> <strong>and</strong> <strong>Distribution</strong>


CESC Ltd, Kolkata – First City in India to have SCADA System<br />

Phase wise implementation


Practical examples <strong>and</strong> references of PTD EA<br />

<strong>Power</strong>Grid Singapore<br />

SCADA&DMS for the entire 22kV network, with more than 3,000 substation RTUs (commissioned 1988)<br />

Extension to the 6.6kV network started 1994 with additional more than1,000 substation RTUs<br />

(Siemens DCS 3000)<br />

Unique communication solution for 6.6 kV substation RTUs using Siemens <strong>Distribution</strong> Line Carrier<br />

cable sheath<br />

Commissioning<br />

SCADA/DMS on 22 kV<br />

Extension to<br />

6.6 kV<br />

Average interruption time experienced by customers in a year<br />

Page 34 July-07 <strong>Power</strong> <strong>Transmission</strong> <strong>and</strong> <strong>Distribution</strong>


<strong>Power</strong> Grid Singapore<br />

Page 35 July-07 <strong>Power</strong> <strong>Transmission</strong> <strong>and</strong> <strong>Distribution</strong>


Page 36 July-07 <strong>Power</strong> <strong>Transmission</strong> <strong>and</strong> <strong>Distribution</strong>


Load Dispatch Centre – EnBW<br />

Transportnetze AG (EnBW) Stuttgart, Germany<br />

Page 37 July-07 <strong>Power</strong> <strong>Transmission</strong> <strong>and</strong> <strong>Distribution</strong>


Practical examples <strong>and</strong> references of PTD EA<br />

Iberdrola S.A. - Spain<br />

BILBAO<br />

VALLADOLID<br />

CACERES<br />

MADRID<br />

TOLEDO<br />

6 SINAUT Spectrum EMS/DMS Systems<br />

(implementation started in 2001)<br />

Data preparation <strong>and</strong> import from GIS<br />

Renewal of existing communication<br />

infrastructure<br />

Export interface for network planning<br />

VALENCIA<br />

MURCIA<br />

ALICANTE<br />

7 million customers served<br />

32 Provinces<br />

23.800 km high voltage lines<br />

193.000 km medium / low voltage lines<br />

946 Substations<br />

87.000 transformation centres<br />

2.62 2.49 2.45<br />

Page 38 July-07 <strong>Power</strong> <strong>Transmission</strong> <strong>and</strong> <strong>Distribution</strong><br />

Average duration of<br />

power cuts per hour<br />

3<br />

2.5<br />

2<br />

1.5<br />

1<br />

0.5<br />

0<br />

SINAUT Spectrum<br />

in operation<br />

1.87<br />

1.51<br />

1.22<br />

1999 2000 2001 2002 2003 2004


Siemens <strong>Power</strong> <strong>Transmission</strong> <strong>and</strong> <strong>Distribution</strong><br />

Energy Automation<br />

Thank you for your<br />

attention<br />

Vikram G<strong>and</strong>otra<br />

Chief Manager (Marketing)<br />

Large Control Centres<br />

Energy Automation<br />

Siemens Ltd<br />

Contact:-<br />

vikram.g<strong>and</strong>otra@siemens.com<br />

Page 39 July-07 <strong>Power</strong> <strong>Transmission</strong> <strong>and</strong> <strong>Distribution</strong>

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!