Sl.<br />

No.<br />

MAJOR WORKS EXECUTED FOR THERMAL POWER PLANTS IN <strong>INDIA</strong><br />

Description Owner Period Value<br />

( IRs / Million)<br />

1. Erection, Testing & Commissioning of<br />

various Hydro Mechanical Equipment<br />

2. Replacement of existing Kerosene Tank<br />

Roof Duct Plate (V1901A) at Manali<br />

3. Erection, Testing & Commissioning of<br />

Boiler Main at 1X210 MW Mejia TPS<br />

(Unit-IV) (6863 MT)<br />

4. Structural Steel Work in Boiler & Bunker<br />

Bay (Part-B) of 2X500 MW Units at<br />

Simhadri Thermal Power Station<br />

5. Structural Steel Work Fabrication &<br />

Erection Work for 2X500 MW Units<br />

Simhadri Thermal Power Station (7998<br />

MT)<br />

Tungabhadra Steel<br />

Products Ltd.,<br />

Tamilnadu Petroproducts<br />

Limited,<br />

Bharat Heavy Electricals<br />

Ltd.<br />

Bharat Heavy Electricals<br />

Ltd.,<br />

Simplex Concrete Piles (I)<br />

Ltd.,<br />

6. Fabrication, Erection & Painting of Bharat Heavy Electricals<br />

Structural Steel Work of Power House Ltd.<br />

Building (Unit - II) at 2X210 MW<br />

Bakreswar Thermal Power Project<br />

7. Fabrication, Erection of Structural Steel National Thermal Power<br />

Works Part-I (TG Bay, Deaerator bay, Corpn. Ltd.,<br />

Control Tower Bay) for Vindhyachal Super<br />

Thermal Power Project Stage-II (2 X 500<br />

MW) (14700 MT)<br />

2003-2006 18.68<br />

2004-2005 3.03<br />

2002-2004 57.15<br />

1999-2003 343.70<br />

1999-2000 84.09<br />

1997-2000 65.93<br />

1995-1998<br />

103.47<br />

32