Sl.<br />
No.<br />
MAJOR WORKS EXECUTED FOR THERMAL POWER PLANTS IN <strong>INDIA</strong><br />
Description Owner Period Value<br />
( IRs / Million)<br />
1. Erection, Testing & Commissioning of<br />
various Hydro Mechanical Equipment<br />
2. Replacement of existing Kerosene Tank<br />
Roof Duct Plate (V1901A) at Manali<br />
3. Erection, Testing & Commissioning of<br />
Boiler Main at 1X210 MW Mejia TPS<br />
(Unit-IV) (6863 MT)<br />
4. Structural Steel Work in Boiler & Bunker<br />
Bay (Part-B) of 2X500 MW Units at<br />
Simhadri Thermal Power Station<br />
5. Structural Steel Work Fabrication &<br />
Erection Work for 2X500 MW Units<br />
Simhadri Thermal Power Station (7998<br />
MT)<br />
Tungabhadra Steel<br />
Products Ltd.,<br />
Tamilnadu Petroproducts<br />
Limited,<br />
Bharat Heavy Electricals<br />
Ltd.<br />
Bharat Heavy Electricals<br />
Ltd.,<br />
Simplex Concrete Piles (I)<br />
Ltd.,<br />
6. Fabrication, Erection & Painting of Bharat Heavy Electricals<br />
Structural Steel Work of Power House Ltd.<br />
Building (Unit - II) at 2X210 MW<br />
Bakreswar Thermal Power Project<br />
7. Fabrication, Erection of Structural Steel National Thermal Power<br />
Works Part-I (TG Bay, Deaerator bay, Corpn. Ltd.,<br />
Control Tower Bay) for Vindhyachal Super<br />
Thermal Power Project Stage-II (2 X 500<br />
MW) (14700 MT)<br />
2003-2006 18.68<br />
2004-2005 3.03<br />
2002-2004 57.15<br />
1999-2003 343.70<br />
1999-2000 84.09<br />
1997-2000 65.93<br />
1995-1998<br />
103.47<br />