27.07.2014 Views

TEXMACO LIMITED - Infraline

TEXMACO LIMITED - Infraline

TEXMACO LIMITED - Infraline

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

List of few High Head Gate Projects executed / under execution<br />

Name of the Project<br />

Country<br />

Size in<br />

Meter<br />

Head<br />

Type of Hoist<br />

Rihand Dam<br />

India<br />

4.7 x 8.5<br />

53.0<br />

Rope Drum<br />

Wadi Ghan Dam<br />

Libya<br />

1.8 x 2.3<br />

58.4<br />

Hydraulic<br />

N’Kula Falla ‘B’ Project<br />

Afiraca<br />

3.0 x 6.0<br />

20<br />

Hydraulic<br />

Sardar Sarovar<br />

(Narmada)<br />

India<br />

5.2 x 6.8<br />

44.1<br />

Hydraulic<br />

Teesa Canal Fall<br />

India<br />

8.15 x 9.12<br />

20.5<br />

Hydraulic<br />

Baglihar<br />

India<br />

3.5 x 11.0<br />

130<br />

Hydraulic<br />

Tala H E Project<br />

Bhutan<br />

3.66 x 5.2<br />

105.8<br />

Rope Drum

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!