6.3.5.2 Existing Utilities ....................................................................... 6-10<br />

6.3.5.3 Land Acquisitions and Easement Costs ................................. 6-10<br />

6.3.5.4 Permitting Requirements ........................................................ 6-10<br />

6.3.6 Route 6 ................................................................................................... 6-10<br />

6.3.6.1 Maintenance <strong>of</strong> Traffic ............................................................ 6-10<br />

6.3.6.2 Existing Utilities ........................................................................ 6-11<br />

6.3.6.3 Land Acquisitions and Easement Costs .................................. 6-11<br />

6.3.6.4 Permitting Requirements ......................................................... 6-11<br />

6.4 Pipe Materials ....................................................................................... 6-11<br />

6.5 Conceptual Comparative Cost ............................................................... 6-12<br />

6.6 Recommendations ................................................................................. 6-15<br />

Section 7 Conclusions From Review Meetings and Workshops<br />

7.1 Flow Transfer Option Selection for Basis <strong>of</strong> Design ............................... 7-1<br />

7.2 Force Main Route Selection for Basis <strong>of</strong> Design ..................................... 7-3<br />

7.2.1 Evaluation <strong>of</strong> Routes Between AWWRF and 4 th <strong>St</strong>reet South ................ 7-3<br />

7.2.2 Evaluation <strong>of</strong> Route Segment On 11 th Avenue South Versus 13 th<br />

Avenue South .............................................................................................. 7-4<br />

7.2.3 Evaluation <strong>of</strong> Route Segment on 54 th Avenue South Versus <strong>St</strong>.<br />

<strong>Petersburg</strong> Country Club ........................................................................... 7-4<br />

7.2.4 Evaluation <strong>of</strong> I-275 Crossing ....................................................................... 7-5<br />

7.2.5 Evaluation <strong>of</strong> Eckerd College Easement ....................................................7-7<br />

7.3 Pump <strong>St</strong>ation Site Alternatives ...............................................................7-7<br />

7.4 Pump <strong>St</strong>ation Preliminary Performance Criteria ...................................7-7<br />

7.5 Project Cost Reduction Measures .......................................................... 7-8<br />

Section 8 Conclusions and Recommendations<br />

8.1 Selected Basis <strong>of</strong> Design .......................................................................... 8-1<br />

8.1.1 Selected Flow Transfer Option ................................................................... 8-1<br />

8.1.2 Selected Route ............................................................................................. 8-3<br />

8.1.2.1 Selected Route Recommended Action Items ......................... 8-3<br />

8.1.3 Possible Pump <strong>St</strong>ation Locations and Preliminary Pump <strong>St</strong>ation<br />

Performance Criteria .................................................................................. 8-4<br />

8.1.3.1 Pump <strong>St</strong>ation Site Alternatives ................................................ 8-4<br />

8.1.3.2 Pump <strong>St</strong>ation Preliminary Performance Criteria ................... 8-4<br />

8.2 Opinion <strong>of</strong> Probable Construction Cost ................................................ 8-5<br />

8.3 Construction Schedule ........................................................................... 8-7<br />

S:\STPETE\AWWRF Flow Transfer PDR\Flow Transfer Implementation Plan Preliminary Design Report\Final Report\TOC.docx<br />

© 2011 Camp Dresser & McKee All Rights Reserved<br />

iv

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!