- Page 3 and 4: Heading 1 (Section Number) Heading
- Page 5: 5.4.3.3 Floor Live Loads ..........
- Page 9 and 10: 3-22 Option #4b - Marginal Present
- Page 11 and 12: Figures On or/Follows Page ES-1 ES-
- Page 13 and 14: Executive Summary After reviewing t
- Page 15 and 16: Executive Summary ES.1.3 Possible P
- Page 17 and 18: Executive Summary The Opinion of Pr
- Page 19 and 20: Section 1 Introduction 1.1 Descript
- Page 21 and 22: Section 1 Introduction In parallel
- Page 23 and 24: Section 2 Existing System An evalua
- Page 25 and 26: Section 2 Existing System generator
- Page 27 and 28: Section 2 Existing System To determ
- Page 29 and 30: Section 3 Flow Transfer Options Eva
- Page 31 and 32: Section 3 Flow Transfer Options Eva
- Page 33 and 34: OPTION #1B EXISTING FORCEMAIN TO BE
- Page 35 and 36: OPTION #2B AWWRF Pump Station EXIST
- Page 37 and 38: OPTION #3A AWWRF Pump Station LS #6
- Page 39 and 40: OPTION #4A EAST HALF LS #62 SERVICE
- Page 41 and 42: OPTION #4C EAST HALF LS #62 SERVICE
- Page 43 and 44: OPTION #5B EXISTING FORCEMAIN TO BE
- Page 45 and 46: Section 3 Flow Transfer Options Eva
- Page 47 and 48: Section 3 Flow Transfer Options Eva
- Page 49 and 50: Section 3 Flow Transfer Options Eva
- Page 51 and 52: Section 3 Flow Transfer Options Eva
- Page 53 and 54: Section 3 Flow Transfer Options Eva
- Page 55 and 56: Section 3 Flow Transfer Options Eva
- Page 57 and 58:
Section 3 Flow Transfer Options Eva
- Page 59 and 60:
Section 3 Flow Transfer Options Eva
- Page 61 and 62:
Section 3 Flow Transfer Options Eva
- Page 63 and 64:
Section 3 Flow Transfer Options Eva
- Page 65 and 66:
Section 3 Flow Transfer Options Eva
- Page 67 and 68:
Section 3 Flow Transfer Options Eva
- Page 69 and 70:
Section 3 Flow Transfer Options Eva
- Page 71 and 72:
Section 3 Flow Transfer Options Eva
- Page 73 and 74:
Section 3 Flow Transfer Options Eva
- Page 75 and 76:
54-inch SS 250.37 ft 250.37 ft 36.0
- Page 77 and 78:
Section 4 Evaluation of Pump Statio
- Page 79 and 80:
Section 4 Evaluation of Pump Statio
- Page 81 and 82:
Section 4 Evaluation of Pump Statio
- Page 83 and 84:
Section 4 Evaluation of Pump Statio
- Page 85 and 86:
Section 5 Pump Station Preliminary
- Page 87 and 88:
Section 5 Pump Station Preliminary
- Page 89 and 90:
Section 5 Pump Station Preliminary
- Page 91 and 92:
Section 5 Pump Station Preliminary
- Page 93 and 94:
Section 5 Pump Station Preliminary
- Page 95 and 96:
Section 5 Pump Station Preliminary
- Page 97 and 98:
Section 6 Force Main Route Evaluati
- Page 99 and 100:
Section 6 Force Main Route Evaluati
- Page 101 and 102:
Section 6 Force Main Route Evaluati
- Page 103 and 104:
Section 6 Force Main Route Evaluati
- Page 105 and 106:
Section 6 Force Main Route Evaluati
- Page 107 and 108:
Section 6 Force Main Route Evaluati
- Page 109 and 110:
Section 6 Force Main Route Evaluati
- Page 111 and 112:
Section 6 Force Main Route Evaluati
- Page 113 and 114:
Section 7 Conclusions from Review M
- Page 115 and 116:
Section 7 Conclusions from Review M
- Page 117 and 118:
Section 7 Conclusions from Review M
- Page 119 and 120:
37th 34th 29th 48th 47th 49th 38th
- Page 121 and 122:
Section 7 Conclusions from Review M
- Page 123 and 124:
Section 8 Conclusions and Recommend
- Page 125 and 126:
Section 8 Conclusions and Recommend
- Page 127 and 128:
Section 8 Conclusions and Recommend
- Page 129 and 130:
Section 8 Conclusions and Recommend
- Page 131 and 132:
Section 8 Conclusions and Recommend
- Page 133:
Appendix A Existing Pump Curves
- Page 145 and 146:
! City of St. Petersburg Page 1 AWW
- Page 147 and 148:
! City of St. Petersburg Page 3 AWW
- Page 177:
Appendix D AWWRF Flow Transfer Rout
- Page 226 and 227:
Florida Department Of Transportatio
- Page 228 and 229:
FLORIDA DEPARTMENT OF TRANSPORTATIO
- Page 230 and 231:
Topic No. 710-020-001-g August 2010
- Page 232 and 233:
Topic No. 710-020-001-g August 2010
- Page 234 and 235:
Topic No. 710-020-001-g August 2010
- Page 236 and 237:
Topic No. 710-020-001-g August 2010
- Page 238 and 239:
Topic No. 710-020-001-g August 2010
- Page 240 and 241:
Topic No. 710-020-001-g August 2010
- Page 242 and 243:
Topic No. 710-020-001-g August 2010
- Page 244 and 245:
Topic No. 710-020-001-g August 2010
- Page 246 and 247:
Topic No. 710-020-001-g August 2010
- Page 248 and 249:
Topic No. 710-020-001-g August 2010
- Page 250 and 251:
Topic No. 710-020-001-g August 2010
- Page 252 and 253:
Topic No. 710-020-001-g August 2010
- Page 254 and 255:
Topic No. 710-020-001-g August 2010
- Page 256 and 257:
Topic No. 710-020-001-g August 2010
- Page 258 and 259:
Topic No. 710-020-001-g August 2010
- Page 260 and 261:
Topic No. 710-020-001-g August 2010
- Page 262 and 263:
FDOT TELEPHONE CONTACTS •For stat
- Page 264 and 265:
RULE 14-46 STATE OF FLORIDA DEPARTM
- Page 266:
Appendix F LS #28 Potential Gravity
- Page 271 and 272:
Memorandum To: From: David Abbaspou
- Page 273 and 274:
AWWRF Draft PDR Comment Responses A
- Page 275 and 276:
AWWRF Draft PDR Comment Responses A
- Page 277 and 278:
AWWRF Draft PDR Comment Responses A
- Page 279 and 280:
AWWRF Draft PDR Comment Responses A
- Page 281 and 282:
AWWRF Draft PDR Comment Reponses Au
- Page 283 and 284:
10' FPC EASEMENT μ 5 Legend EASEME
- Page 285 and 286:
Figure No. 1 Albert Whitted Master
- Page 287:
Appendix J Albert Whitted PS Concep
- Page 292 and 293:
DATE POWER FACTOR EFFICIENCY MOTOR
- Page 294 and 295:
City of St Petersburg, FL AWWRF Pum
- Page 296 and 297:
City of St Petersburg, FL AWWRF Pum
- Page 298 and 299:
City of St Petersburg, FL AWWRF Pum
- Page 300 and 301:
City of St Petersburg, FL AWWRF Pum
- Page 302 and 303:
City of St Petersburg, FL AWWRF Pum
- Page 304 and 305:
City of St Petersburg, FL AWWRF Pum
- Page 306 and 307:
Project name Estimator Labor rate t
- Page 308 and 309:
City of St. Petersburg, FL AWWRF Fl
- Page 310 and 311:
Trenchless Brick Paving City of St.
- Page 312 and 313:
Subject: FDOT right of way and I-27