Reinforced concrete constructions will be preferred because they guarantee an easy<br />
maintenance (catchment box easily accessible). Gabion constructions must be avoided when<br />
possible because they rarely have inspection doors and are buried in the ground.<br />
Three rules must be imperatively respected to build a spring catchment:<br />
Catchments should never be subject to back-pressure: the water level in catchment<br />
box or in the drain must always be lower than the water discharge area level before work.<br />
Catchments must allow draining the aquifer layer by authorizing a drawdown <strong>of</strong> the<br />
piezometric level, but not to increase the pressure, which could make the spring disappear. A<br />
stake can be used (planted quite far in order not to disturb the excavation works) to keep<br />
the reference <strong>of</strong> the initial level <strong>of</strong> the water discharge. This level is used as reference mark<br />
during work construction: the outlet and the overflow pipes have must be always located<br />
below this level. Still to avoid an accidental back-pressure, the installation <strong>of</strong> an overflow<br />
pipe is obligatory; if you do not have any information on the spring maximal flow, the overflow<br />
must be oversize (two pipes <strong>of</strong> 2” for example).<br />
The dam must be constructed on an impermeable ground: the excavation should not be<br />
stopped before reaching the substratum (rocky watertight layer). It sometimes represents<br />
large works, but it is essential to prevent water from flowing under the catchments few<br />
weeks after the end <strong>of</strong> the construction work. The substratum is sometimes difficult to<br />
identify in the field: thus, you must consider it as a layer <strong>of</strong> soil less permeable on which<br />
water circulates without infiltrate.<br />
Catchment must be protected: protection works should always be included in the<br />
catchments work, on the level <strong>of</strong> the drain cover (plastic cover) or the catchment box.<br />
Fig.4: “Gabion type” spring catchments<br />