Fig.25: Crossing a shallow river.<br />

- Crossing a road<br />

The pipe must be buried at a minimum depth <strong>of</strong> 1m.<br />

Use only GI pipe, a GI sleeve or concrete culvert.<br />

- Marking blocks<br />

To mark the pipe laying, concrete or masonry marking blocks must be installed every 100m,<br />

especially at the joints level, and at each sensitive point (junctions, change <strong>of</strong> direction, etc).<br />

Ideally, you must indicate on the blocks the pipe type and diameter, the direction <strong>of</strong> the flow<br />

direction and a block registration number.<br />

Fig.26: Marking block.<br />