Recovered Energy Generation (REG)<br />
using<br />
ORMAT ® Energy Converters (OEC)<br />
<strong>Gas</strong> <strong>Electric</strong> <strong>Partnership</strong> Meeting<br />
January 31, 2008<br />
Presenter – Dan Nadav<br />
GREEN ENERGY you can depend on<br />
PO103<br />
060607
Table of Contents<br />
• Company Profile<br />
• The REG Technology<br />
• ORC Benefits<br />
• <strong>Ormat</strong>’s Experience<br />
• Environmental and Soft Benefits<br />
GREEN ENERGY you can depend on<br />
2<br />
© Copyright. 2006 ORMAT<br />
–<br />
All rights reserved.
Company Profile<br />
Main Areas of Activities<br />
Reliable Distributed Power<br />
Geothermal Power Plants<br />
Resource Recovery: Biomass<br />
Heat Recovery - Pipelines<br />
GREEN ENERGY you can depend on<br />
Industrial Waste Heat Recovery<br />
3<br />
© Copyright. 2006 ORMAT<br />
–<br />
All rights reserved.
Company Profile<br />
• Focus on Renewable and Sustainable Energy since 1965<br />
• Listed on the New York Stock Exchange (ORA)<br />
The only pure play geothermal/REG company listed (NYSE)<br />
• Vertically integrated<br />
Design, Engineering, Manufacturing, Supply, Installation &<br />
Operation<br />
• Flexible Business Model<br />
Equipment only<br />
Turnkey (EPC) power plants supply<br />
<strong>Electric</strong>ity sales under PPA<br />
Project financing<br />
GREEN ENERGY you can depend on<br />
4<br />
© Copyright. 2006 ORMAT<br />
–<br />
All rights reserved.
Technology<br />
One Technology, Different Applications<br />
Typical REG application<br />
GREEN ENERGY you can depend on<br />
Typical Geothermal application<br />
5<br />
© Copyright. 2006 ORMAT<br />
–<br />
All rights reserved.
Technology Background<br />
<strong>Gas</strong> Turbine exhaust<br />
G<br />
Recuperator<br />
Thermal oil loop<br />
Vaporizer<br />
Condenser<br />
Preheater<br />
WHOH<br />
GREEN ENERGY you can depend on<br />
Exhaust gas<br />
6<br />
© Copyright. 2006 ORMAT<br />
–<br />
All rights reserved.
Technology Background<br />
TS Organic Fluid<br />
200<br />
1-2 PreHeating<br />
150<br />
2 3<br />
2-3 Boiling<br />
3-4 Expansion<br />
4-5 Cooling<br />
Temperature<br />
100<br />
50<br />
0<br />
5-6 Condensing<br />
1<br />
6-1 Pumping<br />
4<br />
6<br />
5<br />
0 20 40 60 80 100 120<br />
Entropy<br />
GREEN ENERGY you can depend on<br />
7<br />
© Copyright. 2006 ORMAT<br />
–<br />
All rights reserved.
Technology - Benefits<br />
• Simple system<br />
Air-cooled<br />
No water use, no water treatment<br />
No blow down<br />
No vacuum pumps or steam ejectors<br />
Uses thermal oil as the system’s intermediate medium<br />
Load fluctuation tolerance<br />
• Rugged design<br />
1800 RPM turbine, no reduction gear<br />
Outdoor installation typical (even in severe climates)<br />
• Packaged modular system – fast on-site installation<br />
4-6 month onsite construction (20 months from NTP to Completion)<br />
May use existing utility interconnection<br />
Small installation footprint<br />
• Cost effective<br />
Very low O&M requirements<br />
No licensed steam technicians required<br />
Operates in automatic/unmanned mode<br />
GREEN ENERGY you can depend on<br />
8<br />
© Copyright. 2006 ORMAT<br />
–<br />
All rights reserved.
Technology - Benefits<br />
Flexible installation<br />
• The REG system allows for some large distances between the location of<br />
the heat exchanger (Waste Heat Oil Heater) and the OEC.<br />
• This distance does not significantly affect the performance of the OEC.<br />
Original<br />
Stack/Silencer<br />
WHOH<br />
OEC<br />
*<br />
*<br />
Diverter<br />
<strong>Gas</strong><br />
Turbine<br />
Enclosure<br />
GREEN ENERGY you can depend on<br />
400 Feet of Piping<br />
9<br />
© Copyright. 2006 ORMAT<br />
–<br />
All rights reserved.
Technology - Benefits<br />
Minimum interruption<br />
Installation completed in less than 48 hours outage of <strong>Gas</strong><br />
turbine<br />
GREEN ENERGY you can depend on<br />
10<br />
© Copyright. 2006 ORMAT<br />
–<br />
All rights reserved.
Technology - Benefits<br />
Low Operation & Maintenance (O&M) requirements<br />
• Unmanned operation<br />
• Island mode capabilities<br />
• Single switch operation<br />
• Minimal maintenance requirements<br />
GREEN ENERGY you can depend on<br />
11<br />
© Copyright. 2006 ORMAT<br />
–<br />
All rights reserved.
Technology<br />
REG – Efficiency factors<br />
• 25% additional power from existing gas<br />
turbines (800ºF-950ºF)<br />
Roll Royce (40,000 HP) – approximately 5.5 MW<br />
GE LM2500 (25,000 HP) – approximately 5.5 MW<br />
Solar Titan (15,000 HP) – approximately 3.5 MW<br />
Solar Mars 100 (12,000 HP) – approximately 2.4<br />
MW<br />
Solar Taurus (7,000 HP) – approximately 1.4 MW<br />
GREEN ENERGY you can depend on<br />
12<br />
© Copyright. 2006 ORMAT<br />
–<br />
All rights reserved.
<strong>Ormat</strong>’s Experience<br />
Neptune <strong>Gas</strong> Processing Plant<br />
• Heat source - two Solar<br />
Mars 100 <strong>Gas</strong> Turbines<br />
• REG application – 4.6<br />
MW<br />
• Allows island-mode<br />
operation<br />
• Historical availability<br />
factor near 100%<br />
• O&M performed by the<br />
plant operating team<br />
GREEN ENERGY you can depend on<br />
13<br />
© Copyright. 2006 ORMAT<br />
–<br />
All rights reserved.
<strong>Ormat</strong>’s Experience<br />
Northern Border Pipeline<br />
• Heat source – 4 RR RB211 <strong>Gas</strong> Turbines<br />
• Owned and operated by <strong>Ormat</strong><br />
• Capacity: 6.5 MW x 4 (locations) = 26 MW<br />
(total)<br />
• Technology advances<br />
Automated diverter<br />
Remote operation from<br />
main and backup locations<br />
Minimum impact on day<br />
to day station operation<br />
GREEN ENERGY you can depend on<br />
14<br />
© Copyright. 2006 ORMAT<br />
–<br />
All rights reserved.
<strong>Ormat</strong>’s Experience<br />
– The Alliance Pipeline<br />
• Heat source – one 33,000 HP<br />
General <strong>Electric</strong> LM2500 <strong>Gas</strong><br />
Turbine<br />
• The Kerrobert Recovered Energy<br />
Generation Power Plant is owned<br />
and operated by NRGreen Power<br />
Limited <strong>Partnership</strong><br />
• Capacity: 6.5 MW<br />
• The electricity generated by the<br />
power plant is sold to SaskPower<br />
• Recently NRGreen has signed<br />
contracts for three additional REG<br />
projects already under construction<br />
at its compressor stations in<br />
Saskatchewan<br />
GREEN ENERGY you can depend on<br />
15<br />
© Copyright. 2006 ORMAT<br />
–<br />
All rights reserved.
<strong>Ormat</strong>’s Experience – The Duke Energy Pipeline<br />
• Developer: EnPower, an<br />
independent power<br />
producer (IPP) owned by<br />
Pristine Power and Enmax<br />
• An agreement to develop<br />
five 5-MW REG projects on<br />
five compressor stations at<br />
the T-south mainline<br />
• Currently two projects<br />
(Station 6A 150 Mile House<br />
and Savona) are under<br />
construction based on a<br />
long term PPA with BC<br />
Hydro as part of the utility’s<br />
“Clean Energy Program”<br />
GREEN ENERGY you can depend on<br />
16<br />
© Copyright. 2006 ORMAT<br />
–<br />
All rights reserved.
<strong>Ormat</strong>’s Experience –<br />
Kinder Morgan’s Trailblazer Pipeline (the Peetz<br />
Compressor Station)<br />
• Heat source – two 12,000<br />
Solar Mars <strong>Gas</strong> Turbines<br />
• Owned and operated by<br />
<strong>Ormat</strong><br />
• Capacity: 4 MW<br />
• Generates Green Credits<br />
qualified under the<br />
Colorado RPS<br />
GREEN ENERGY you can depend on<br />
17<br />
© Copyright. 2006 ORMAT<br />
–<br />
All rights reserved.
REG Experience – Global Reach<br />
• Germany<br />
Heidelberg Cement Plant<br />
1.5 MW REG unit<br />
Availability factor – over 98% (average for<br />
the first 5 years)<br />
O&M costs - $6,800/year over the first 5<br />
years of operation (equivalent to less than<br />
$0.001/kWh)<br />
• India<br />
UltraTech, India’s largest cement company<br />
5.5 MW REG project<br />
• Italy<br />
Five small standard 350 kW units using<br />
Jenbacher gas engines in landfills and<br />
other industrial applications<br />
GREEN ENERGY you can depend on<br />
18<br />
© Copyright. 2006 ORMAT<br />
–<br />
All rights reserved.
Soft Benefits – the PR Impact<br />
• The current PR landscape provides a perfect<br />
opportunity for green energy projects:<br />
Environmentally-conscious public<br />
Proactive regulator/legislator<br />
GREEN ENERGY you can depend on<br />
19<br />
© Copyright. 2006 ORMAT<br />
–<br />
All rights reserved.
MSNBC – covering the OREG1 (South<br />
Dakota) REG plant dedication ceremony<br />
GREEN ENERGY you can depend on<br />
20<br />
© Copyright. 2006 ORMAT<br />
–<br />
All rights reserved.
Alliance – the Kerrobert dedication ceremony<br />
with SK premier and minister of energy<br />
GREEN ENERGY you can depend on<br />
21<br />
© Copyright. 2006 ORMAT<br />
–<br />
All rights reserved.
Thank you<br />
Contact:<br />
Ohad Zimron<br />
email: ozimron@ormat.com<br />
Dan Nadav<br />
email: dnadav@ormat.com<br />
GREEN ENERGY you can depend on<br />
PO103<br />
060607