Recent Progress in 2G HTS Wires at SuperPower
Recent Progress in 2G HTS Wires at SuperPower
Recent Progress in 2G HTS Wires at SuperPower
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
<strong>2G</strong> cable has been <strong>in</strong>stalled <strong>in</strong> grid of Albany Cable<br />
site<br />
Install<strong>at</strong>ion <strong>at</strong> Albany Cable site<br />
(Aug. 5, 2007)<br />
World’s first <strong>in</strong>-grid cable, first<br />
underground <strong>HTS</strong> cable, first cable-tocable<br />
jo<strong>in</strong>t, 350 m long<br />
On-Grid Oper<strong>at</strong>ions Began July 20, 2006<br />
30 m segment of 1G cable replaced by<br />
<strong>2G</strong> cable which is world’s first <strong>2G</strong> device<br />
ISS 2007 –6–<br />
<strong>2G</strong> cable cool-down<br />
beg<strong>in</strong>s l<strong>at</strong>e Nov. 2007<br />
and will be energized<br />
soon thereafter