The ESP examined the installation of five staging areas: three within the BV-1 segment<br />

encompassing 8 acres, a 1-acre site in the B-4 segment, and a 15-acre area within the B-5A<br />

segment. No staging areas were planned for segments B-2 and B-5B. The post-construction<br />

survey confirmed that 2.86 acres of staging area were used in B-5B and two additional staging<br />

areas were used in B-4. However, even with the additional staging areas, the total impact<br />

footprint of the staging areas decreased from 23 acres to 14 acres.<br />